EXPLORATION UPDATE FOR DALMAS AND HIVER PROJECTS
Lightning Minerals (L1M or the Company) has received initial results from its reconnaissance works at
the Dalmas and Hiver Lithium projects in Quebec, Canada. The Dalmas and Hiver projects lie within
the James Bay region and the La Grande geological sub province, approximately 150km to the east of
Patriot Battery Metals’ (ASX: PMT) Corvette lithium project and 45km to the east of Winsome Resources’
(ASX: WR1) Adina lithium project. The Hiver project is comprised of sixty two (62) claims covering an area
of 31 km2 and the Dalmas project with ninety two (92) claims for a total area of 47 km2 .
HIGHLIGHTS
o
Field reconnaissance programs are now complete with all analytical work returned for 32
samples
o
Multiple pegmatites to form the basis of future exploration
o
Planning of the next stage of exploration underway for the resumption of field activities
during the Canadian summer
As outlined in ASX announcement 3 November 2023, 163 of the 165 multispectral targets that were
identified have been visited at the company’s Dalmas and Hiver projects, with 111 targets at Dalmas and
52 targets at Hiver. From these targets, 32 samples were collected for geochemical analysis. Results are
presented in Appendix 2. The completion of these early-stage exploration works can now be used to
guide future exploration with numerous strategies currently being investigated.
Lightning Minerals’ Managing Director Alex Biggs said, “It was important to complete stage one
reconnaissance works prior to the Canadian winter. Results still demonstrate the potential for lithium
mineralisation and have provided further opportunities and ideas for ongoing exploration. Current
results will give us a greater understanding of how we can unlock the potential of Dalmas and Hiver
which are located in one of the world’s premier lithium provinces. This program was designed to be a
quick first pass reconnaissance of Dalmas and Hiver to identify extent of surface mineralisation and
allow us to develop strategies for sub cropping structures should they exist. Consider this work as an
incremental step in gaining an understanding of what will be the most appropriate path forwards to
identifying the potential at Dalmas and Hiver and we believe that the underlying geology represents
significant opportunity”.
RECONNAISSANCE FIELDWORK RESULTS
Geological service provider IOS Services Géoscientifiques of Quebec, Canada were commissioned to
undertake the reconnaissance fieldwork program during October 2023. The program was designed to
inspect target locations identified in the previous multispectral interpretations (ASX Announcement
08 August 2023) are shown in Figures 1 and 2. The reconnaissance program was designed to be a first
pass with a view to determining future works and whether mineralisation exists clearly at surface or if
exploration requires more advanced targeting techniques to uncover sub cropping potential.
Note 1: The presence of pegmatitic lithologies does not necessarily indicate the presence of lithium, tantalum or caesium mineralisation.
Only laboratory chemical assays can determine the presence and grade of any mineralisation.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Field geologists focused on the prospectivity for hard rock pegmatite hosted lithium-caesiumtantalum deposits, and as such sampled outcropping pegmatites and mobile boulders for a total of 32
samples.
At Hiver, one outcrop of pegmatite was documented and sampled, in addition 11 boulders of
pegmatite/paragneiss were recorded across the multispectral target areas. The pegmatites are
generally described as quartz, plagioclase, and biotite dominant with occasional feldspar and
magnetite crystals present. Dalmas sites of interest included 11 outcropping pegmatites as well 6 sites
reported as pegmatitic granite/granodiorite. The Dalmas pegmatites are comprised of quartz,
plagioclase, and biotite, with occasional K-feldspars, amphiboles, and pyrite. A full list of geological
descriptions for both insitu pegmatites and mobile boulders is available within Appendix 2 – Table 4.
Figure 1: Pegmatite outcrop and boulders mapped within the Dalmas Project (NAD 83/UTM Z18N)
The samples were submitted to ‘Actlabs’ in Ancaster Ontario for analysis. All samples were analysed by
Sodium Peroxide Fusion with the Actlabs Ultratrace 7 package as well as assayed for gold. Handheld
XRF measurements of potassium and rubidium were collected on large feldspar crystals within
pegmatite samples to provide qualitative elemental compositions for fractionation analysis.
Peak results from the Actlabs whole rock laboratory analysis include 33ppm lithium, 7.3ppm caesium
and 3.6ppm tantalum. Full results are presented in Appendix 2.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 2: Pegmatite outcrop and boulders mapped within the Hiver Project (NAD 83/UTM Z18N)
Handheld XRF analysis of feldspars within field samples reported potassium/rubidium (K/Rb) ratio
values peaking at 166.7 for Dalmas sample 159990065. As a general guide K/Rb ratios are considered
indicative of fractionated pegmatites as ratios move below 50, dependant on the overall whole rock
chemistry. Sample 159990065 from the Dalmas project is further along the desired fractionation trend
but remains distinctly separate from analogue analysis from mineralised pegmatite samples within
the region as shown by Figure 3 below.
Handheld XRF results are presented in Appendix 2.
Note 2: Handheld XRF measurements inherently have numerous issues and limitations, results must be handled with caution.
Determinations by handheld XRF are considered semi-quantitative at best, as such XRF data has only been used to calculate Potassium
and Rubidium ratios within feldspar crystals for geological fractionation analysis. Certified laboratory analysis of whole rock geochemistry
for each sample is also available in Appendix 2 – Tables 5 and 6
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 3: Handheld XRF results for feldspar minerals within field samples.
While the reconnaissance program has not identified mineralised pegmatites in the first pass of field
visitation, the geology within the projects remains prospective.
The next stages of the exploration strategy are currently being assessed, including potential collection
of high-resolution Light Detection and Ranging topographic data collection (LIDAR) to aid in the
identification of further outcropping pegmatites. Various tillite sampling programs across both project
areas are also being considered to investigate dispersion of tantalum as an exploration tool. The
collection of high resolution aeromagnetic geophysical data to uncover geological structures is also
being considered for the resumption of field activities during the Canadian summer.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
ABOUT THE PROJECTS AND QUEBEC AS A SIGNIFICANT LITHIUM REGION
Quebec is quickly becoming one of the world’s leading lithium regions, particularly the James Bay
district which hosts multiple large scale lithium projects including:
•
Patriot Battery Metals’ (ASX: PMT) Corvette lithium project1 consisting of 109.2Mt @ 1.42% Li20
Inferred
•
Nemaska Lithium’s (TSX: NMX) Whabouchi lithium project2 with 55.7Mt @ 1.4% Li20 consisting of
38.5Mt @ 1.45% Li20 Measured and Indicated and 17.2Mt @ 1.29% Li20 Inferred
Critical Elements’ (TSX.V: CRE) Rose lithium project3 with 34.2Mt @ 0.9% Li20 consisting of 31.5Mt @
0.91% Li20 Indicated and 2.7Mt @ 0.77% Li20 Inferred
•
•
Sayona Mining’s (ASX: SYA) Moblan lithium project4 with 51.4Mt @ 1.30% Li20 Measured, Indicated
and Inferred
•
Allkem’s (ASX: AKE) James Bay lithium project5 with 54.3Mt @ 1.30% Li20 Indicated and 55.9Mt @
1.29% Li20 Inferred
•
Winsome Resources’ (ASX: WR1)6 Adina project with 58.5mt @ 1.12% Inferred
Figure 4: Dalmas and Hiver project locations, James Bay, Quebec
REFERENCES
Patriot Battery Metals (PMT) ASX Announcement 31 July 2023
Nemaska Lithium’s TSX Announcement 09 August 2019
3
Critical Element’s TSX.V Announcement 27 July 2022
4
Sayona Mining’s ASX Announcement 17 April 2023
5
Allkem’s ASX Announcement 11 August 2023
6
Winsome Resources (WR1) ASX Announcement 11 December 2023
1
2
This announcement has been approved for release by the Board of Directors.
-ends
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Stock Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas project is
located in the prolific Dundas region of Western Australia. The Company also owns the Dalmas and Hiver lithium projects in
Quebec, Canada, another significant and evolving lithium region globally as well as other projects in Western Australia which
include Mt Jewell, Mt Bartle and Mailman Hill which are prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is a
full-time employee of the company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation and
types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
Lightning Minerals engaged IOS Geosciences (IOS) to execute the prospecting and exploration work described in this news
release. IOS has an experienced team of explorers based in Saguenay and is managing several projects in the James Bay region.
This report contains information related to exploration results and is based on preliminary information and data compiled or
reviewed by IOS under the supervision of Mr. Hugues Longuepee, who is classified as a Professional Geoscientist (P. Geo) with
the respective professional regulatory body, the Order of Geologists of Quebec. Mr. Longuepee has also reviewed this new release.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
APPENDIX 1: JORC CODE 2012 TABLE 1 CRITERIA
The Table below summarises the assessment and reporting criteria used for exploration results for the Dalmas and Hiver Exploration Projects and reflects the guidelines in Table 1 of The Australasian
Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Drilling techniques
Drill sample recovery
Logging
Commentary
•
Rock chip sampling is associated with the reconnaissance mapping and sampling program which aimed to confirm historical
pegmatite reports, by both locating both previous and sampling pegmatite outcrops or boulders.
•
No visual estimates of mineralisation are being reported
•
No drilling is reported.
•
No drilling is reported.
•
•
•
•
No drilling completed.
Mineral percentage bins of surface samples are as follows - Primary Minerals (Major >30%), Secondary Minerals (Minor
>5% and <30%), Accessory Minerals (Trace <5%).
Geological observations are qualitative in nature. The information contained within describes only dominant outcrop
lithologies at discreet locations, and minerals of interest.
All data is stored in digital format for use in GIS software packages.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
•
•
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
•
•
•
•
•
•
•
•
•
•
•
Sampling is at the discretion of field geologists undertaking the geological reconnaissance activities.
At this early stage of exploration discretionary grab samples on selecting lithologies of interest is considered appropriate.
No sub sampling has occurred.
36 Samples comprising 32 field samples, 3 Certified Reference Materials, and 1 blank were submitted to Actlabs in
Ancaster, Ontario. All QAQC samples passed the criteria when reviewed.
Samples were prepared using protocol RX1, in which the samples are dried crushed until P80 passes @-2mm.
Homogenisation is then carried out using a riffle splitter. A 250g representative sample is then obtained. Pulversiging to
P95 passing @<105micron is then completed. All samples were then analysed by soidum peroxide fusion with ICP-OES
and ICP-MS finish. Samples were also assayed for gold using the Actlabs 1A2-ICP package which is a fire assay with ICPMS finish.
Handheld XRF measurements were carried out at the IOS Services Géoscientifiques laboratory with a portable X-ray
fluorescence spectrometer (Olympus Vanta VMR). A count time of 90 seconds was used using the 3 beam Geochemistry
mode. Rousseau’s fundamental algorithm for major elements and Compton normalisation were employed. Calibration
samples were tested daily and certified reference materials were used for control purposes. Handheld XRF sampling
inherently has numerous issues and limitations, results must be handled with caution.determinations by handheld XRF
are considered semi-quantitative at best, as such the XRF data has only been used to calculate Potassium and Rubidium
for geological fractionation analysis.
No data verification has occurred.
The company has verified the presence of historically reported outcrop lithologies during the reconnaissance phase of
exploration works.
All geological maps utilising NAD83 / UTM zone 18N are sufficiently annotated.
All geological locations utilising WGS84 / UTM zone 19N are sufficiently annotated.
All reported locations are assumed to have a +/- 10m accuracy via use of handheld GPS instruments.
Data points are guided by field outcrops instead of regular spacing.
Exploration data contained within is not appropriate for calculating Mineral Resources. Insufficient exploration has been
completed at this stage to warrant such calculations.
No compositing of results has been reported in this announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
•
•
Sample security
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
Orientation of data in
relation to geological
structure
Field observation points are guided by outcrop location instead of specific orientation.
No relationship between outcrop mapping sites is known.
•
Field samples have been collected and stored by IOS Geosciences, under the supervision of Mr. Hugues Longuepee
P.Geo.. Mr. Longuepee, is QP and a Member of the Ordre des geologues du Quebec.
No audits or reviews have been undertaken.
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
•
•
•
•
•
The Hiver and Dalmas projects are located in the James Bay Region of Quebec, Canada.
The Hiver and Dalmas projects are centered at approximately 54°03’20”N, 72°01’57”W, and 53°36’01”N, 71°43’18”W
respectively.
The Hiver and Dalmas Project are 100% owned by Lithium Rabbit Quebec Pty Ltd.
Lightning Minerals Ltd signed a binding letter of intent on 11th August 2023 to acquire two project areas, Dalmas and Hiver
in the James Bay region of Quebec, Canada.
The Dalmas project is comprised of 92 mining claims totaling 4,707Ha
The Hiver project is comprised of 62 mining claims totaling 3137Ha
Lithium Rabbit Quebec Pty Ltd retains a 2.0% Net Smelter Royalty, of which 1.0% may be bought back by the Company at
any time for A$1.0 million. The NSR is applicable across both projects.
All tenements are in good standing and are presented in this announcement.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
•
Geology
Deposit type, geological setting and style of mineralisation.
•
The mineralisation style sought at the Dalmas and Hiver Projects is Lithium bearing pegmatites.
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
•
No drillholes are reported.
Geological datasets were sourced from Ministère des Resources Naturelles et des Forêts (MERN), the Quebec geological
survey.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Data aggregation
methods
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
•
No weighted averaging techniques have been reported, and no max/min cutoffs have been used.
•
No drill results are reported.
•
Appropriate two-dimensional plans have been included in the body of this announcement.
•
•
•
•
•
•
•
Lightning Minerals is committed to accurately detailing the results from any exploration activities, and reporting results in a
balanced manner.
Lightning Minerals Ltd engaged IOS Geosciences during October 2023.
IOS Geosciences have completed field reconnaissance as planned and reported results as contained herein.
All pegmatite lithologies mapped within the project areas require geochemical analysis to ascertain if a relationship to
relevant mineralisation processes are present. The presence of pegmatites in outcrop and boulders alone is not sufficient
to assume the presence of mineralisation.
Lightning Minerals is not aware of any data that may have been omitted from this announcement.
As detailed in text.
Exploration efforts will continue with a consolidation and review of all previous geological and geophysical data available
for the project areas.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
APPENDIX 2 - TABLE 1: REPORTING VISUAL ESTIMATES OF MINERALISATION
Project
Sample ID
Dalmas
-
Hiver
-
Geology/Comments
No lithi