Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
24 October 2024
QUARTERLY ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 SEPTEMBER 2024
Lightning Minerals (L1M or the Company) is pleased to report its Quarterly Activities Report for the
quarter ending 30 September 2024.
HIGHLIGHTS
o
Exploration works begun at the Company’s Caraíbas and
Sidrônio (now Canabrava) lithium projects, located in the
prolific Lithium Valley region of Minas Gerais, Brazil
o
Initial works to focus on soil sampling, ground
reconnaissance and geophysics interpretation to assist in
developing drill targets
o
Acquisition of the Esperança lithium project in close
proximity to the Company’s Caraíbas and Sidrônio (now
Canabrava) lithium projects
o
Establishment of team in Brazil and relationship building
with stakeholders on the ground including the Minas Gerais
government
o
Results of auger program at Mailman Hill identifying
anomalous gold occurrences
o
Annual Report completed and lodged
o
Planning and logistics completed for infill soil sampling at
Dundas North and Dundas South to follow up on lithium in
soil anomalism up to 147ppm Li and areas up to 35km2
ASX: L1M
Shares on Issue
103,328,319
Performance Rights
46,049,999
Unlisted Options
Outstanding
10,450,000 (exercisable at A$0.25)
6,000,000 (exercisable at A$0.105)
80,000 (exercisable at A$0.30)
110,000 (exercisable at A$0.40)
140,000 (exercisable at A$0.50)
Listed Options Outstanding
37,442,829 (exercisable at A$0.25)
Cash Position
A$2.625 Million
(at 30 September 2024)
Lightning Minerals Managing Director Alex Biggs said, “The September Quarter has been very positive
for the Company with the start of works on the ground in Brazil which are ongoing subsequent to end
of Quarter. Since completion of the acquisition of Bengal Mining in June 2024 we have established a
presence in Brazil quickly and effectively which has allowed us to begin our work programs. The
acquisition of the Esperança project which is in close proximity to the Caraíbas and Canabrava projects
further demonstrates the Company’s intent to increase its land position in the Lithium Valley region of
Minas Gerais. Over the next Quarter results will begin to be reported which will form the basis for drill
program planning. Completion of an auger program at the Company’s Mailman Hill gold project in
Western Australia has also been an important step to understanding the potential that Mailman Hill
may hold and inform our future work programs there. Plans were also made to complete further infill
soil sampling at the Company’s Dundas project in Western Australia to follow up on previous positive
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
results across the project area. The Company is supporting the lithium thematic and Minas Gerais, Brazil
is seen as a low-cost, highly prospective region that has yielded multiple world class discoveries in
recent years. The achievements during the Quarter have set the Company up well for news flow for the
next few months. Thanks to our shareholders and stakeholders who have supported our strategy in
Brazil and backed the future of the lithium thematic”.
OPERATIONAL ACTIVITIES
CARAÍBAS, SIDRÔNIO (NOW NAMED CANABRAVA) AND ESPERANÇA
PROJECT OVERVIEW (100% L1M)
The Company began its exploration programs at the Caraíbas and Sidrônio (now Canabrava) lithium
projects in the prolific Lithium Valley region of Minas Gerais, Brazil. ground reconnaissance, geophysics
and soil sampling in order to identify drill targets to be drilled towards the end of the year. Subsequent
to end of Quarter results have begun to be reported including identification of lithium in soil anomalism
and multiple pegmatites at the Canabrava project up to 113ppm lithium (ASX Announcement 03
October 2024) and commencement of works at the Esperança project (ASX Announcement 09 October
2024).
DUNDAS PROJECT OVERVIEW (100% L1M)
The Quarter has focused on designing infill soil sampling campaigns and organising logistics for both
Dundas North and Dundas South to follow up on previous lithium in soil anomalism up to 147ppm
lithium and anomalism across broad areas up to 35km 2. Works have begun subsequent to end of
Quarter (ASX Announcement 07 October 2024).
DALMAS AND HIVER PROJECT OVERVIEW (100% L1M)
Further investigation of LIDAR and a field work program to follow up on works completed in 2023 was
conducted with plans for field works to potentially be conducted in the 2025 Canadian summer field
season. The projects are located in the prolific James Bay region of Quebec which hosts multiple large
scale lithium projects and exploration targets.
MAILMAN HILL PROJECT OVERVIEW (100% L1M)
Results from the Company’s inaugural auger sampling campaign were delivered during the Quarter
(ASX Announcement 21 August 2024) identifying anomalous levels of gold. The program was designed
to test 9km of highly prospective lithology within the Keith-Kilkenny Tectonic Zone immediately
southeast of Cavalier Resources’ (ASX:CVR) Crawford Gold Project which is located directly to the northwest of the Mailman Hill tenement. The project hosts a JORC compliant Resource of 3.75Mt @ 1.0g/t Au
for 118koz (1.15Mt @ 1.0g/t Au Indicated, 2.60Mt @1.0g/t Inferred). The Project has a maiden ore Reserve
of 1.00Mt @0.9g/t Au for 29koz and is progressing to the permitting stage (see ASX announcement 14
March 2024, Cavalier Resources (ASX: CVR)). The Company is investigating the potential of an extension
to the Crawford Gold Project. Plans are underway for further follow up, potentially targeting deeper
lithologies which may yield higher grade gold results in line with what is seen at the nearby Crawford
deposit.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
SUMMARY OF ANNOUNCEMENTS IN THE QUARTER
(ending 30 September 2024)
EXPLORATION BEGINS AT LITHIUM PROJECTS IN BRAZIL
(ASX ANNOUNCEMENT 24 July 2024)
o Exploration program underway including first-pass geological mapping and surface
sampling. Geophysical targeting exercise to be undertaken using existing state
geophysical datasets
O
Exploration includes a focus on an artisanal workings site within the Caraíbas Project,
which produced peak pegmatite rock chip assay results grading up to 0.53% Li2O
(lepidolite) and strong tantalum (1,245ppm), rubidium (1,175ppm) and caesium (1,455ppm)
assays
O
Multiple pegmatites identified during reconnaissance site visit2 to be further analysed
and mapped as well as regional trends within the Salinas Formation which hosts multiple
lithium Resources
Exploration Mapping and Soil Sampling
Exploration at the Caraíbas and Sidrônio (now named Canabrava) projects has now commenced
following successful contractor engagement. The local lithium exploration IP possessed by the team
will greatly benefit the exploration works and will accelerate an already aggressive exploration agenda.
The initial stage of work includes geological mapping across both the Caraíbas and Sidrônio (now
named Canabrava) projects. This will quickly accelerate exploration and aid with drill target generation
to ensure optimal drill targets are generated as effectively and efficiently as possible.
A more focused geological mapping and geochemical sampling program will be completed on the
area immediately surrounding the Caraíbas artisanal site to support drill target generation. The
Caraíbas artisanal site has already confirmed that pegmatite boulders at the location contain lithium
minerals (lepidolite + accessory rubelite) for which three previously announced rock chip assay results
included peak values of 0.53% Li2O, tantalum (1,245ppm), rubidium (1,175ppm) and caesium
(1,455ppm)1. The pegmatite outcrop at this location continues along strike from the artisanal workings
but is covered by residual saprolites from weathered Salinas Formation schists. Mapping surrounding
these areas intends to gather information about the orientation and prevalence of the intrusion
extending away from the outcrop location.
The geochemical surface sampling campaign will target Salinas Formation host rocks adjacent to the
fertile granites. Areas with residual saprolite profiles will be targeted and will be split into two distinct
areas shown in Figure 1.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 1: The Caraíbas and Sidrônio (now named Canabrava) project areas showing priority target areas (dashed) for
regional mapping, soil sampling and geophysical dataset review
The eastern target area of the Caraíbas project will receive a tightly spaced sample grid up to a
maximum resolution of 100m x 50m surrounding the artisanal site. The western target area will receive
a coarser resolution grid for sample spacing as it is considered early-stage with less documented
historical exploration. This approach accelerates the turnaround of exploration data and helps to
expedite vectoring toward potential lithium mineralisation.
The collection of soil samples will utilise access tracks perpendicular to the regional aeromagnetic
signature and structural regime to best target sites of structural dilation that may present the most
suitable locations for the emplacement of pegmatites. This will facilitate mapping of outcrops that could
have previously been hidden by vegetation. This will enable geologists to assess the surface for
potential sub-cropping pegmatites which are known to leave particular mineral assemblage in
floatstone contained within the saprolite profile above the Salinas Formation.
Geophysical Dataset Reprocessing
Reprocessing of existing Minas Gerais state regional geophysical datasets will be conducted in
conjunction with the first pass regional exploration program. The resolution of the currently available
imagery is insufficient to support the localised targeting of structures, the coarse resolution of the
imagery can be seen in Figure 2.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 2: The Minas Gerais state regional aeromagnetic geophysical image is shown below and exhibits a coarse
resolution which can be optimised with reprocessing of existing data
The reprocessing exercise intends to refine the available data to support exploration targeting within
the NE-SW magnetic lineaments indicating structural complexities. Reprocessing existing data is
considered fast and cost effective and will inform a parallel piece of work of planning collection of highresolution drone geophysical data. Future surveys will likely utilise drone technology as associated costs
are dramatically reduced in comparison to helicopter-based survey work. Initial reinterpretation of
existing data will also reduce the amount of drone survey work required as it will be focused on areas
of higher interest.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
The Caraíbas and Sidrônio (now named Canabrava) tenements are potentially part of a subparallel
lithium domain and may be related to the same N-E regional structural lineaments that are observed at
nearby known lithium Resources (Figure 2). Contradictory granite and metasediment interpreted
geological contacts exist within the state bedrock geology datasets. These layers may not accurately
represent the underlying geology satisfactory for targeting at a project scale. The presence of younger
cover sequences are thought to have impacted the regional scale interpretations and now present an
opportunity to refine and gain further understanding of the extents of the Salinas Formation.
The geophysics and regional field mapping exercises aim to suitably define geological contacts and
may have a marked impact on target prioritisation. The distance of target areas from the granite
boundaries plays an important role considering the genetic model of hard rock lithium deposits when
they are derived from the nearby fertile parental granite suites that include S-type granitic bodies.
LIGHTNING EXPANDS LITHIUM POTENTIAL IN BRAZIL
(ASX ANNOUNCEMENT 14 August 2024)
o Esperança Project location consolidates the existing land package in Brazil with identified
pegmatite outcrops at Caraíbas and Sidrônio (now named Canabrava) lithium projects and
located along clearly identified geophysical trends
o Acquisition is based on a 24-month option which allows for low-cost, phase 1 exploration
strategies to prove prospectivity
o On-ground works have begun at the Caraíbas and Sidrônio (now named Canabrava)
projects including ground reconnaissance, geophysics and soil sampling with a view to
defining drill targets. Work programs will be extended to the Esperança project area
The Esperança Project
The Esperança Project is located approximately 3km south-east of the Company’s Sidrônio (now
named Canabrava) project along the same geophysical trend that runs north-east to south-west as
shown in Figure 5. These structural trends are analogous to the trends present at Latin Resources’ (ASX:
LRS) Colina deposit approximately 25km to the north-east. During a recent site visit in June 2024
multiple areas of interest were identified that will be the focus of further investigation. The Project is
located in the prolific Salinas Formation which is thought to provide adequate rheological conditions
suitable for the emplacement of late hydrothermal fluids and has proven to host multiple lithium
Minerals Resources in the region. In similar geological settings, proximal to S-type granites, the Salinas
Formation is known to host fertile lithium mineral bearing pegmatites. The Project also presents the
opportunity for the Company to begin consolidation of its land position around the Caraíbas and
Sidrônio (now named Canabrava) lithium projects.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 3: Esperança Project site trip in June 2024
Figure 4: Geology team at the Esperança Project during site trip in June 2024
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 5: Esperança, Caraíbas and Sidrônio (now named Canabrava) projects location and tenements plotted
against publicly available analytic signal aeromagnetic image from Servico Geologico do Brasil (Geological
Service of Brazil), as first announced on 22 April 2024
Summary of Key Terms
The Company, via its wholly owned subsidiary Tigre Mineracao Ltda (Tigre), has entered into the
Option Agreement with BRS pursuant to which BRS has granted the Company an option to acquire
100% of the rights over the Esperança Project held by BRS for a period of 24 months from the date
of the Option Agreement (Option).
If the Company elects to proceed with the Option Exercise (defined below), it will acquire, via Tigre,
a 100% interest in the Esperança Project. If the Company elects not to exercise the Option and
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
terminate the Option Agreement, the Company will forfeit all amounts paid to BRS to date and will
not acquire any interest in the Esperança Project.
For the exclusive right until the 24-month anniversary of the Option Agreement to acquire the
Esperança Project, the Company is to pay to BRS:
•
•
a fixed amount of BRL$100,000, with BRL$50,000 paid upon signing of the Option Agreement
(Stage 1 Payment) and BRL$50,000 to be paid within 12 months from the start of the Option
Agreement term (Stage 2 Payment); and
a monthly amount of BRL$5,000 for the 24-month term of the Option Agreement (Monthly
Payments). If the Company elects to exercise the Option or terminates the Option at any time
prior to the payment of all Monthly Payments, no remaining Monthly Payments shall be paid.
In the event that the Company elects to exercise the Option and proceed with the acquisition of
the Esperança Project at any time prior to the 24-month anniversary of the Option Agreement
(Option Exercise), the Company is required to pay to BRS:
• an amount of BRL$1,000,000 (Option Exercise Payment) within 30 days of the Option Exercise;
and
• a deferred milestone amount of BRL$2,000,000 upon and subject to Tigre reporting a mineral
resource estimate (of inferred or greater confidence) on the Esperança Project of at least 10Mt,
reported in accordance with the JORC Code, with a grade of at least 1.3% of Li 2O (Milestone
Consideration).
Table 1: Acquisition terms for the Esperança Project
Deal Terms
Amount
TOTAL
TOTAL
(BRL)
(BRL)
(AUD)1
Percentage of
Total Deal Value
(%)
Quantity
Stage 1 Payment
1
50,000
50,000
13,500
1.6%
Stage 2 Payment (12 Months)
1
50,000
50,000
13,500
1.6%
Monthly Payment
24
5,000
120,000
32,400
3.7%
Option Exercise Payment
1
1,000,000
1,000,000
270,000
31.1%
Milestone Consideration - 10Mt
@ 1.3% Li20
1
2,000,000
2,000,000
540,000
62.1%
3,220,000.00
869,400.00
Notes:
1.
Based on a BRL:AUD exchange rate of 1.00:0.27 as at 8 August 2024.
Net Smelter Royalty
In the event that the Company elects to proceed with the Option Exercise, a 2.0% Net Smelter
Royalty (NSR) is granted to BRS (Royalty). Half of the Royalty (1.0%) can be purchased at any time by
the Company for BRL$3,000,000 (~A$800,000). The remaining 1.0% may be purchased at fair
market terms, as determined by an independent auditing firm contracted by the Company.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Facilitator Shares
Subject to shareholder approval, 1,000,000 fully paid ordinary shares in the Company are intended
to be issued to the transaction facilitator, Mr Leandro Gobbo for services provided in connection
with the Option Agreement.
AUGER PROGRAM ASSAY RESULTS FOR MAILMAN HILL GOLD PROJECT
(ASX ANNOUNCEMENT 21 AUGUST 2024)
o
Program tested 9km of the prospective lithology within the Keith-Kilkenny Tectonic
Zone immediately southeast of the Crawford Gold Project (ASX:CVR)
o
Assays highlight three broad clustered areas with multiple results >15ppb Au that
require follow up exploration.
o
Peak UFF+ gold value of 141ppb Au returned from saprolite above Felsic
Volcaniclastics of the Minerie Formation
AUGER DRILLING STRATEGY FOR E37/1408 – MAILMAN HILL GOLD
PROJECT
The Mailman Hill project is located adjacent to the southeast of Cavalier Resources (ASX:CVR).
Recent exploration success has progressed the Crawford gold project beyond Prefeasibility studies
and has successfully delineated a JORC gold resource of 3.74Mt @ 1.0g/t (0.5g/t cut off) for 117,800
ounces (Figure 6).
The Mailman Hill auger sampling program was designed to test the geophysical trend extensions
over a spatial footprint of approximately 41km2, including an 8km stretch of prospective strike
extension south east of the Crawford project. Seven hundred and nineteen (719) auger samples
have now been collected at average depths of 1.5 metres beneath alluvial cover. Samples were
collected into kraft field sampling bags which were then sent to LabWest Minerals Analysis of Perth
for analysis using the CSIRO developed Labwest UltraFine+™ (UFF+) analysis technique. The UFF+
technique was developed to test for low level pathfinder element anomalism through the cover
sequences, the application of this technique is considered appropriate for the Mailman Hill gold
project.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 6: Mailman Hill Project location
KEY ASSAY RESULTS
The UFF+ analytical method was selected as it can detect very subtle anomalies in transported
cover where other traditional detection methods may be challenged. The UFF+ process involves a
physical step to retain the fine microparticles of less than two microns in size as they have a greater
surface area to test for the presence of adsorbed gold and other elements. Where metals can
reasonably migrate to the surface in great enough concentrations, the UFF+ method is the best
suited to expose even very low tenor response anomalism.
Results for the Mailman Hill auger program are encouraging, Au results show a concentration of
broad low level (>15ppb Au) clusters in the north-western half of the auger program area (Figure
7).
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 7: Mailman Hill Project complete auger program Au assay results showing gold anomalism
clustered in North-Western half of survey area
This concentration of results can be further subdivided into three areas above 15ppb Au. The
response from the south-eastern half of the program may be further subdued due to the depth of
the alluvial cover increasing in this area.
The peak Au value (141ppb Au) occurs within ‘Target area 2’ in sample MHAU00250 which is located
approximately 3km east of the interpreted extensions of the Crawford project. The relationship
between the peak gold values returned in this location will be investigated as a priority, as the
elevated Au responses are more consistent along the two sample traverses present within ‘Target
area 2’ as shown in Figure 8. The underlying geology in this location is interpreted as Felsic
Volcaniclastics of the Minerie Formation, which may lie on the eastern contact of the broad eastern
boundary of the Keith-Kilkenny Tectonic Zone (KKTZ). The KKTZ lineament is a major structural
feature within the Eastern Goldfields Superterrane and has a strong association with various gold
deposits within the region.
High resolution and targeted infill auger programs may be considered to improve the clarity of
results for any Aircore drill target generation, and for follow up exploration works.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 8: Mailman Hill Project Auger program Au results showing three broad Target areas for follow
up exploration works
NEXT STEPS AND OTHER WORK PROGRAMS
A review of geochemical results including analysis of pathfinder elements to elucidate any subtle trends
will be completed to aid in the drill targeting exercise. Small, targeted, and cost-effective infill auger
programs may be considered prior to a decision on Aircore drill testing.
MT JEWELL PROJECT (100% L1M)
No further work has been conducted on the Mt Jewell project this Quarter.
MT BARTLE PROJECT (100% L1M)
Application for the Mt Bartle tenements is still pending. Data review and analysis is still ongoing and
continues subsequent to the end of Quarter. Discussions regarding execution of heritage agreements
are continuing.
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
PERMITTING, HERITAGE AGREEMENTS AND POW APPLICATIONS
All permitting and heritage agreements are in good standing with the exception being Mt Bartle
where negotiations are ongoing.
PROJECT GENERATION
The Company has continued to review project opportunities during the Quarter and now holds highly
prospective lithium targets in Minas Gerais, Brazil, Western Australia and Quebec, Canada.
Figure 9: Lightning Minerals’ Brazilian tenements in regional context of the Lithium Valley
region of Minas Gerais
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 10: Lightning Minerals’ Australian project tenement summary
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 11: Location of Dundas project tenements
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 12: Dalmas and Hiver project locations, James Bay, Quebec
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
FINANCE
EXPLORATION EXPENDITURE
The Company spent A$155K on direct exploration activities during the period, focused principally on the
Dundas Projects, establishing works for Mailman Hill Project and data review of other projects. The Company
has cash and cash equivalents of A$2.625 Million at 30 September 2024.
QUARTERLY USE OF FUNDS
Under ASX listing rule 5.3.4 the company presents its quarterly use of funds against its IPO Prospectus
projections as shown in Table 2.
Table 2: Use of funds against IPO prospectus projection
Expenditure
1
Prospectus
Q2 23
Q3 23
Q4 23
Q1 24
Q2 24
Q3 24
Q4 24
Q1 25
Q2 25 TOTAL
4,900,000
129,000
574,000
217,000
793,000
217,000
227,000
155,000
149,000
2,461,000
Working Capital (A$)2
1,374,000
314,000
363,000
352,000
373,000
453,000
265,000
346,000
289,000
2,753,000
Costs of Offer (A$)3
726,000
486,000
34,000
21,000
2
0
0
108,000
26,000
675,002
Exploration (A$)
1
includes items 1.2(a) and 2.1(d) from Appendix 5B, includes items 1.2(d) and 1.2(e) from Appendix 5B, includes item 3.4
2
3
CHANGE IN DIRECTOR’S INTERESTS
There were no changes of Director’s interests during the Quarter.
FINANCING
No financing or capital raises occurred during the Quarter.
OTHER DISCLOSURES
As disclosed under item 6.1 in the Appendix 5B and under ASX listing rule 5.3.5, the Company made
payments for a total consideration of A$98k relating to payments for Executive and Non-Executive Directors
for Director’s normal monthly fees and undertaking additional duties to support corporate and exploration
activities.
CAPITAL STRUCTURE
The capital structure at 30 September 2024 was:
Ordinary Shares
103,328,319 Ordinary Shares
Options
37,442,829 L1MO : Listed Options (each exercisable at A$0.25 each expiring 13/03/28)
6,000,000 Options (each exercisable at A$0.105 each expiring 18/06/27)
5,450,000 Options (each exercisable at A$0.25 each expiring 27/09/27)
5,000,000 Options (each exercisable at A$0.25 each expiring 14/11/26)
80,000 Options (each exercisable at A$0.30 each expiring 06/04/27)
110,000 Options (each exercisable at A$0.40 each expiring 06/04/27)
140,000 Options (each exercisable at A$0.50 each expiring 06/04/27)
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
Performance Shares
4,800,000 Class A Performance Rights Restricted (each vest upon 25 cent VWAP expiring 18/11/2027)
250,000 Class B Performance Rights (each vest upon 50 cent VWAP expiring 23/11/28)
500,000 Class C Performance Rights (each vest upon 75 cent VWAP expiring 23/11/28)
500,000 Class D Performance Rights (each vest upon $1.00 VWAP expiring 23/11/28)
14,285,714 Class E Performance Rights (each vest upon Resource of at least 5Mt @ 1.00% Li20 for Caraíbas
or Sidrônio (now named Canabrava) project expiring 18 June 2027)
14,285,714 Class F Performance Rights (each vest upon Resource of at least 10Mt @ 1.00% Li20 for Caraíbas
or Sidrônio (now named Canabrava) project expiring 18 June 2028)
11,428,571 Class G Performance Rights each vest upon Resource of at least 30Mt @ 1.00% Li20 for Caraíbas
or Sidrônio (now named Canabrava) project expiring 18 June 2029)
This announcement has been approved for release by the Board of Directors.
-ends
Level 11, 40 The Esplanade, Perth, Western Australia, Australia | admin@lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Securities Exchange (ASX:L1M) and focused on
the exploration of lithium and critical minerals. The recent acquisition of the Caraíbas, Sidrônio (now Canabrava) and Esperança
lithium projects in Minas Gerais, Brazil are potentially transformational to the Company’s success in the lithium sector. The
Company also owns the Dundas lithium project in the prolific Dundas region of Western Australia and the Dalmas and Hiver
lithium projects in Quebec, Canada, another significant and evolving lithium region globally. The Company also holds other
projects in Western Australia which include Mt Jewell, Mt Bartle and Mailman Hill which are prospective for base metals and
critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operatio
Share your feedback
Discover