QUARTERLY ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 JUNE 2024
Lightning Minerals (L1M or the Company) is pleased to report its Quarterly Activities Report for the
quarter ending 30 June 2024.
HIGHLIGHTS
o
Completion of Brazilian lithium projects acquisition,
Caraíbas and Sidrônio in the prolific Lithium Valley region of
Minas Gerais
o
Completion of site visit to Brazil by Managing Director, Alex
Biggs confirming prospectivity of Caraíbas and Sidrônio
project areas and highly prospective regional geology
o
Extraordinary General Meeting completed successfully to
support Brazil acquisition and A$1.5M capital raising
o
Strong lithium anomalism further confirmed at Dundas
project through completion of 3,800m Aircore drill program
o
Planning for future infill soil sampling and Aircore drilling
across Dundas projects underway for 2024
o
Auger drilling campaign at Mailman Hill gold project
completed to test large scale gold anomaly which is
potential extension of Cavalier Resources Crawford deposit
o
Director participation in A$1.5M capital raising demonstrates
ongoing confidence in strategy by the Company’s Board
o
Further evaluation of the Company’s assets has been
completed to further define most appropriate expenditure
strategy for the remainder of 2024
ASX: L1M
Shares on Issue
99,328,319
Performance Rights
46,049,999
Unlisted Options
Outstanding
10,450,000 (exercisable at A$0.25)
6,000,000 (exercisable at A$0.105)
80,000 (exercisable at A$0.30)
110,000 (exercisable at A$0.40)
140,000 (exercisable at A$0.50)
Listed Options Outstanding
37,442,829 (exercisable at A$0.25)
Cash Position
A$3.12 Million
(at 30 June 2024)
Lightning Minerals Managing Director Alex Biggs said, “The June Quarter has been a very busy and
exciting period for us here at Lightning. Amongst ongoing works on our Dundas and Mailman Hill
projects here in Australia the acquisition of the Caraíbas and Sidrônio lithium projects in Minas Gerais,
Brazil has been a very positive step in the Company’s evolution. We feel that the projects represent a
transformative opportunity for us and having spent June over in Brazil on the ground at the project
areas and around the Lithium Valley region itself I am very confident in the potential that this
acquisition presents. As a company we are bullish that lithium sentiment will return and now is the
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
opportunity to be preparing the company for when it does through diligent and prudent on ground
works as well as complementary project acquisitions. We look forward to a busy upcoming Quarter of
on ground works in Brazil and development of a number of other opportunities that we are working
on”.
OPERATIONAL ACTIVITIES
CARAÍBAS AND SIDRÔNIO PROJECT OVERVIEW (100% L1M)
The Company completed its acquisition of the Caraíbas and Sidrônio lithium projects in the prolific
Lithium Valley region of Minas Gerais, Brazil. Managing Director, Alex Biggs spent June in Brazil visiting
the project areas and the Lithium Valley region meeting with key stakeholders and developing a team
to complete on ground works. Subsequent to end of Quarter work programs are being put into place
consisting of ground reconnaissance, geophysics and soil sampling in order to identify drill targets to
be drilled towards the end of the year.
DUNDAS PROJECT OVERVIEW (100% L1M)
The Quarter returned results from drilling of a lithium in soil anomaly on Dundas tenement E63/2000.
Previous soil sampling produced results up to 218ppm Li which has yielded a ~2.6km x ~1km >100ppm
lithium in-soil anomaly. A 96 hole Aircore drilling campaign for 3,820m was completed with numerous
elevated lithium assays with a peak assay result of 994ppm Li. Tenement E63/2000 is located
approximately 8km to the East of Liontown Resources (ASX: LTR) Buldania project which hosts a
Resource of 15Mt @ 1.0% Li. Plans are under development for further infill soil sampling across multiple
other targets across the Company’s Dundas tenements.
DALMAS AND HIVER PROJECT OVERVIEW (100% L1M)
Plans are underway for geophysical and LIDAR survey works across both the Dalmas and Hiver projects
to further develop an exploration thesis following a successful ground reconnaissance campaign in
February 2024. The projects are located in the prolific James Bay region of Quebec which hosts multiple
large scale lithium projects and exploration targets.
MAILMAN HILL PROJECT OVERVIEW (100% L1M)
An inaugural auger sampling campaign was completed during the Quarter to test 9km of highly
prospective lithology within the Keith-Kilkenny Tectonic Zone immediately southeast of Cavalier
Resources’ (ASX:CVR) Crawford Gold Project which is located directly to the north-west of the Mailman
Hill tenement. The project hosts a JORC compliant Resource of 3.75Mt @ 1.0g/t Au for 118koz (1.15Mt @
1.0g/t Au Indicated, 2.60Mt @1.0g/t Inferred). The Project has a maiden ore Reserve of 1.00Mt @0.9g/t Au
for 29koz and is progressing to the permitting stage (see ASX announcement 14 March 2024, Cavalier
Resources (ASX: CVR)). The Company is investigating the potential of an extension to the Crawford Gold
Project south-east onto its Mailman Hill tenement and looks forward to receiving assays in Q3 CY2024.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
SUMMARY OF ANNOUNCEMENTS IN THE QUARTER
(ending 30 June 2024)
ACQUISITION OF BENGAL MINING - HIGHLY PROSPECTIVE LITHIUM
PROJECTS IN BRAZIL’S LITHIUM VALLEY
(ASX ANNOUNCEMENT 22 April 2024)
o
Projects located in the prolific Lithium Valley region of Minas Gerais 20km south of Latin
Resources’ (ASX: LRS) Colina project
o
Multiple pegmatites have been identified at the Caraíbas Project, with peak lithium rock
chip assay results grading up to 0.53% Li2O (lepidolite)
o
Significant tantalum (1,245ppm), rubidium (1,175ppm) and caesium (1,455ppm) rock chip assay
results are considered positive exploration indicators
o
Strong aeromagnetic geophysical trends correlate with regional mineralised trends
o
Projects lie within geology of the Salinas Formation which hosts other lithium Resources in
the region
o
Proposed Transaction based on 5Mt, 10Mt and 30Mt Resource milestones presenting
significant upside at both a project and company level demonstrating vendor confidence
o
Oversubscribed placement of A$1.5M at A$0.07 per share to facilitate work program
o
Field work to commence as soon as deal completion and approval at Company EGM
o
Access to a seasoned field team that holds significant local IP, providing invaluable fieldwork
expertise and insights
Lightning Minerals (L1M or the Company) is excited to announce the signing of a binding agreement to
acquire Bengal Mining Pty Ltd (Bengal) which holds, via its wholly owned subsidiary Tigre Mineracao Ltda
(Tigre) option agreements over two lithium projects, Caraíbas and Sidrônio (the Projects) in Brazil’s prolific
Lithium Valley district in the state of Minas Gerais (Proposed Acquisition).
The Company views the Proposed Acquisition as transformative for its future, leveraging the strategic
proximity of the projects to Latin Resources’ (ASX: LRS) Colina project1 hosting 70.3Mt @ 1.27% Li20 and
Sigma Lithium’s (NASDAQ: SGML) Grota do Cirilo project2 hosting 108.9Mt @ 1.41% Li20. The Projects have
been acquired from Bengal, a privately held Australian company which holds exclusive options across all
seven (7) tenements totaling 3,372 Ha.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
About the Projects and Minas Gerais as a Lithium Region
The Projects are located in the Lithium Valley region of Minas Gerais, Brazil. The Projects cover 3,372 Ha
comprising seven (7) exploration licences and are located approximately 20km south of Latin Resources’
(ASX: LRS) Colina lithium project and 60km north-west of Signa Lithium’s (NASDAQ: SGML) Grota do
Cirilo project (Figure 1). The region has emerged as one of the world’s premier lithium districts over the
past few years and presents significant exploration potential.
The Company will benefit from access to a seasoned ground team, providing invaluable fieldwork
expertise and insights, enhancing the Company's strategic approach to exploration. Relationships the
Company already has in the region will help facilitate project growth and advancement.
Minas Gerais is Brazil’s third largest economy with over 300 mines operating in the state with tier-1
operators including Vale, BHP and Rio Tinto. The state boasts a strong mining labour pool and presents
a cost competitive jurisdiction for exploration and project development with mature infrastructure, hydro
power and road access.
Caraíbas and Sidrônio Projects
The Projects are located in the Eastern Brazilian Pegmatite Province that encompasses approximately
150,000 km2, stretching from Bahia state to Rio de Janeiro state. The Caraíbas Project consists of five (5)
separate tenements covering 1,733 Ha and the project area contains a series of albite and muscovite
rich pegmatites identified by Bengal’s initial reconnaissance works. Aeromagnetic data shows the
tenements are located along regional structures and shear zones which are analogous to the trends
present at Latin Resources’ (ASX: LRS) Colina deposit. The Caraíbas Project is located approximately
20km to the south in the same Salinas geological formation.
The Sidrônio Project consists of two (2) tenements covering 1,638 Ha, strategically located adjacent and
along strike to the south from the Caraíbas Project. Aeromagnetic data shows the tenements are located
along similar interpreted structural trends that may potentially be conduits for mineralisation.
Both Projects cover prospective Salinas Formation geology which is thought to provide adequate
rheological conditions suitable for the emplacement of late hydrothermal fluids. In similar geological
settings, proximal to S-type granites, the Salinas Formation is known to host fertile lithium mineral
bearing pegmatites.
Records from the ‘Project Evaluation of the Potential of Lithium in Brazil’ - Servico Geologico do Brasil
(Geological Service of Brazil) indicate that historic prospecting or fossicking may have occurred with the
Caraíbas Project. At this location an inactive mine location is recorded as ‘LB-43 Lavra Luís Rocha –
Caraíbas’ which is interpreted to be a small-scale prospecting excavation. The area was then targeted
by Bengal company geologists in late 2023 as part of a small reconnaissance program to identify lithium
prospectivity in the region. Three rock chip samples were taken from the site with peak assay results of
0.53% Li2O, 1,245 ppm tantalum, 1,175 ppm rubidium and 1,455 ppm caesium.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 1: Location of Caraíbas and Sidrônio projects
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 2: Caraíbas and Sidrônio project location, geology and tenements
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
STRONG LITHIUM ANOMALISM CONTINUES AT DUNDAS PROJECT
(ASX ANNOUNCEMENT 13 May 2024)
o Positive assays for the Company’s 96 hole, 3,820m Aircore drill campaign on tenement
E63/2000 have now been received
o Assays have returned elevated lithium values on composite samples with peak results of
994ppm lithium, confirming and increasing the tenor of the previously identified anomalism
o Results highlight three sites of interest which exhibit correlated elevations in lithium and
pathfinder elements supporting continued exploration
Drilling Results for Dundas Tenement E63/2000
During early 2023 Lightning Minerals completed a first pass reconnaissance soil geochemistry program
consisting of 1,391 soil samples at its Dundas South Project. Results within tenements E63/2000 and
E63/1993 defined a broad lithium in-soil anomaly over an approximate 2.4km x 1.0km area, including a peak
result of 218ppm lithium (Figure 3). Infill sampling was then completed to further define anomalism and to
delineate drill targets through the shallow regolith and alluvial cover present in the area. The positive results
of the infill program were sufficient to support the continuation of exploration activities through Aircore
drilling.
The maiden drill program within E63/2000 was then completed in February 2024 and assays have now been
received for all samples submitted for laboratory analysis. Results show three sites of interest, these exhibit
broadly correlated elevations in pathfinder elements within highly weathered saprolites. Two of the three sites
(Drill Traverse 4 and 6, Figure 4) are located on the eastern extents of east west orientated drill lines and will
require follow up exploration to continue vectoring toward any potential lithium mineral system that may be
responsible for the elevated results.
Samples were collected from all holes using a 4m composite sampling technique from surface. The samples
were then submitted to Nagrom laboratories for a full suite of exploration stage low level elemental analysis.
Lithological logging via suitably qualified contract geologists reported a range of end of hole (EOH) rock
types including mafic volcanics, granites, and metasediments, with some holes ending at hard
undifferentiated saprock/saprolite boundaries.
Two drillholes (DSAC0140 and DSAC0151) intersected albite-quartz-muscovite pegmatites. This supports
the thesis that pegmatite producing hydrothermal systems are present and may support lithium enrichment
if the genetic lithological conditions are correct. Due to the pegmatite intersection, drillhole DSAC0151 was
sampled at 1m intervals. Potassium to rubidium ratios (K/Rb) are encouraging for this intersection as they may
indicate that pegmatites in this location have experienced fractionation.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 3: Dundas South tenement E63/2000 and E63/1993 showing UFF+ lithium soil geochemistry
results and recent Aircore drill collar locations (white)
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 4: Peak downhole lithium result plan for composite samples within E63/2000 Aircore
program. (Background lithium heatmap derived from UFF+ lithium soil geochemistry results)
Peak results for elements considered as potential pathfinders for the target commodity include 125ppm
beryllium, 115ppm caesium, 35ppm tin, and 38ppm tantalum.
The peak lithium result of 994ppm lithium occurs within a 2m composite sample at EOH in drillhole
DSAC0227 (Figure 6). The lithology for this sample is described as highly weathered mafic saprock (2425m), followed by moderately weathered, fine grained mafic basalt (25-26m EOH). A lithium response
of this magnitude is unusual for this lithology without the presence of an underlying modifying factor,
investigating this will form part of the next stage of works. Resampling of DSAC0227 to a 1m downhole
resolution will now be undertaken to provide further confidence in the identified area of interest.
Drill sections for each of the three areas of interest are shown in Figures 5 to 7. In cross sections ‘C-D’ and
‘E-F’ it is noted that a gradual increase in the tenor of results occurs as drilling moves toward the east.
Exploration will focus on areas located immediately east of drillholes DSAC0227 and DSAC0151 and
may require follow up exploration to determine the potential of a lithium mineral system.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 5: Cross Section A-B showing composite downhole lithium and rubidium intercepts
Figure 6: Cross Section C-D showing composite downhole lithium and rubidium intercepts
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 7: Cross Section E-F showing composite downhole lithium and rubidium intercepts
COMPLETION OF DUE DILIGENCE AND START OF WORK PROGRAM –
BRAZIL LITHIUM PROJECTS ACQUISITION
(ASX ANNOUNCEMENT 28 May 2024)
AND
DEAL COMPLETION ON ACQUISITION OF BENGAL MINING AND
BRAZILIAN LITHIUM PROJECTS
(ASX ANNOUNCEMENT 19 June 2024)
o
All Conditions Precedent have been met including receipt of shareholder approval at the Company’s EGM on 13
June 2024 including completion of tranche 2 capital raising
o
Completion of acquisition of Bengal Mining and options over highly prospective lithium projects Caraíbas and
Sidrônio, located in the prolific Lithium Valley region of Minas Gerais, Brazil
o
Recent site visit confirms the highly prospective nature of the projects in Brazil’s prolific Lithium Valley in the
state of Minas Gerais
The acquisition of Bengal Mining is now complete and is seen as transformative to the future of the
Company as it positions itself in the prolific Lithium Valley district of Minas Gerais, Brazil. Currently,
Managing Director, Alex Biggs is in Brazil visiting the projects and region as well as attending the Brazil
Lithium Summit in Belo Horizonte. He will be meeting with key stakeholders, contractors and business
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
leaders to ensure the Company is well positioned in Brazil moving forwards. Recent site visits have
demonstrated the potential that the Caraíbas and Sidrônio projects present as reported in ASX
Announcement 14 June 2024.
Next Steps
Work programs will focus on ground reconnaissance, geophysical drone survey works, drill target
identification and drilling. It is estimated that these works will occur over the next 6-months but are
subject to change as the Company gains further knowledge on the projects.
Initial indicators and impressions gathered from this site visit will continue to inform the Company’s
approach to exploration at both Caraíbas and Sidrônio over the coming months but the strategy already
developed is considered appropriate with a view to developing drill targets over the next few months.
AUGER SAMPLING TO TEST HIGH PRIORITY GOLD TARGETS AT
MAILMAN HILL PROJECT
(ASX ANNOUNCEMENT 11 June 2024)
o 700+ sample auger drilling program commenced at the Mailman Hill Project
o Program to test 9km of the prospective lithology within the Keith-Kilkenny Tectonic Zone
immediately southeast of the Crawford Gold Project (ASX:CVR)
o Samples will undergo UFF+ Ultrafine™ analysis which has the ability to identify
geochemical anomalism, potentially associated with mineralisation, through alluvial
cover in the region
Lightning Minerals (L1M or the Company) is pleased to report the start of a focused auger sampling
campaign at its 100% owned Mailman Hill gold project, 30km east of the mining centre of Leonora, near
Kalgoorlie in Western Australia. The auger campaign is designed to identify drill targets which may be
an extension to Cavalier Resources’ (ASX: CVR) Crawford Gold Project which hosts 3.75Mt @ 1.0g/t for
118Koz (Inferred + Indicated) and initial Probable Ore Reserve of 1.00Mt @ 0.91g/t for 29Koz.
The Mailman Hill asset is a project that was part of the Company’s IPO on the ASX in November 2022.
Following in-depth data review the Company is excited about the gold potential the Mailman Hill asset
may present. While the Company is still focused on its lithium projects in Australia, Brazil and Canada it
is important that all our projects are reviewed and appropriate works are completed.
AUGER DRILLING STRATEGY FOR E37/1408 – MAILMAN HILL GOLD
PROJECT
The Mailman Hill Project consists of one Exploration Licence (E37/1408) covering an area of nearly 102 km2.
The tenement is located 25 km East of Leonora (Figure 8). The Project is located adjacent to the southeast of
ground held by Cavalier Resources (ASX:CVR), where recent exploration success has progressed the
Crawford gold project beyond Prefeasibility studies and has successfully delineated a JORC gold resource of
3.74Mt @ 1.0g/t (0.5g/t cut off) for 117,800 ounces (Figure 9).
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 8: Mailman Hill Project location
Mineralisation at the Crawford project is associated with intense alteration (sericite-fuchsite-silica-carbonatesulphide) within a shear zone that broadly correlates with the eastern boundary of the Keith-Kilkenny Tectonic
Zone (KKTZ). The KKTZ lineament is a major structural feature within the Eastern Goldfields Superterrane and
has a strong association with various gold deposits within the region.
Public domain aeromagnetic geophysical data for the local area demonstrates that north-westerly orientated
magnetic trends continue from Crawford on the Mailman Hill tenure (Figure 10). The magnetic trends seen
in the aeromagnetic geophysics often highlight zones with structural reworking, and the interpretation is that
the eastern boundary of the KKTZ is interpreted to continue from the Crawford project into the western
portion of the Mailman Hill tenement.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 9: Crawford Deposit immediately along strike to the north west and planned auger drilling
The proposed auger sampling program will test the geophysical trend extensions over a spatial footprint of
approximately 41km2, including an 8km stretch of prospective strike extension south east of the Crawford
project. Samples are to be collected from depths of up to 5 metres beneath alluvial cover and analysis will
utilise the CSIRO developed Labwest UltraFine+™ analysis technique which will aid in seeing through the
cover sequences. It is expected that the tenor of results may be subdued due to the presence of this cover so
any elevated results for gold or pathfinder elements that are grouped or appear to reflect the underlying
geology will be considered as targets for follow up Aircore drilling.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 10: Geophysical signatures of underlying geology at Mailman Hill, showing Cavalier Resources –
Crawford Deposit along regional scale magnetic trends
BRAZIL RECONNAISSANCE SITE VISIT CONFIRMS LITHIUM
POTENTIAL AND PEGMATITES AT CARAÍBAS AND
SIDRÔNIO PROJECTS
(ASX ANNOUNCEMENT 14 June 2024)
O
Field reconnaissance has confirmed lithium bearing outcrop at artisanal workings site within the Caraíbas Project,
which produced peak lithium rock chip assay results grading up to 0.53% Li2O (lepidolite) and strong tantalum
(1,245ppm), rubidium (1,175ppm) and caesium (1,455ppm) assays
O
Exploration programs are being developed which are supported by aeromagnetic geophysical trends that correlate
with regional trends found at nearby lithium deposits
O
Confirmation of exploration approach with detailed plans underway to begin exploration works immediately
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Lightning Minerals (L1M or the Company) is excited to announce a successful site visit to the Caraíbas and
Sidrônio lithium projects in Minas Gerais, Brazil and completion of phase one reconnaissance works. The site
visit was attended by Lightning Minerals representatives and local contract geologists with considerable local
lithium experience.
Positive indications from the site visit include the verification of previously identified outcropping pegmatites
containing lithium bearing minerals (Lepidolite) within artisanal workings at the Caraíbas project. Numerous
pegmatite showings were also observed across both the Caraíbas and Sidrônio project areas indicating the
presence of pervasive hydrothermal activity.
Caraíbas and Sidrônio Projects Site Visit
Lightning Minerals’ representatives have now completed the first reconnaissance field investigation at the
Caraíbas and Sidrônio Projects. The team were accompanied by Brazilian contract geologists with extensive
local lithium experience and knowledge of the Salinas region. Prior to the Company’s site visit a short 4-day
field excursion was completed by in country geologists to note points of interest for later follow-up works.
The Caraíbas project artisanal site was visited as a priority, however entering the artisanal shaft was not
possible due to advanced weathering and a lack of ground support which prohibited entry. Site visits have
however confirmed that pegmatite boulders at the location contain lithium minerals (lepidolite + accessory
rubelite) where three previously announced rock chip assay results included peak values of 0.53% Li2O,
tantalum (1,245ppm), rubidium (1,175ppm) and caesium (1,455ppm). +
Pegmatite boulders at the location (Figure 11C) are scattered due to artisanal mining activities and are
generally of a feldspar-mica-tourmaline-lepidolite mineral assemblage. The presence of lepidolite,
tourmaline, accessory rubelite and tantalite are compelling indicators that the source geochemistry may be
approaching the correct composition.
The pegmatite outcrop continues along strike from the artisanal workings but is covered by thin 2-4m
residual saprolites from weathered Salinas Formation schists. Pegmatite mapping will be a priority for
forward works.
Various sites were then visited across the greater Caraíbas and Sidrônio projects. As a first pass exploration
strategy local geologists traverse stream beds which both provides access and strips saprolite from the
bedrock to expose the geology beneath. Numerous pegmatite occurrences have been identified using this
technique along ephemeral drainage systems (Figure 11D) which is especially encouraging given the lack
of overall exploration data for the region. A comprehensive outcrop geology mapping exercise to properly
locate, geochemically sample, and structurally map the pegmatites utilising the stream exposures is now
being considered in conjunction with a stream sediment sampling program to support future drill target
generation activities.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
Figure 11: (A) Pegmatite showing lepidolite minerals (purple) within sample at Caraíbas artisanal workings (805118mE,
8193908mN) (B) Lightning Minerals’ Managing Director Alex Biggs with local contract lithium geologists at the entry of
the artisanal workings (C) Example of the excavated feldspar-mica-tourmaline-lepidolite pegmatite boulders
surrounding the site. (D) Example of typical pegmatite outcrops within stream beds throughout the project areas.
The scale and number of pegmatite occurrences within the Eastern Brazilian Pegmatite Province and proximal
to the Caraíbas and Sidrônio projects is impressive. The prospectivity evaluation of the projects has been
confirmed and is considered high, supporting the company’s desire to implement aggressive exploration
strategies to vector toward lithium rich areas. Follow up exploration works are outlined below.
The Caraíbas and Sidrônio project areas were of interest due to their position within the Eastern Brazilian
Pegmatite Province (EBPP), which has recently become recognised as the “Lithium Valley” of Brazil. The
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
EBPP is host to numerous lithium (spodumene) resources which occur in a similar geological setting to the
exploration permits Lightning has now acquired.
Next Steps
Immediate steps to progress exploration at the Caraíbas and Sidrônio projects include but are not limited to:
o A short three to five day focused geological mapping and sampling program at the Caraíbas artisanal site
to support drill target generation surrounding the existing lithium bearing pegmatite locations.
o Stream sediment sampling and outcrop geology mapping campaigns will form part of the regional
exploration exercise, which are fast, effective and low cost exploration strategies.
o Soil sampling programs are also in development over areas where regional (coarse resolution) geophysics
datasets display features resembling those of nearby spodumene rich pegmatite deposits.
o Collection of higher resolution aeromagnetic geophysical data to target prospect scale structures is
underway through local geophysical service providers. Surveys will utilise drone technology, the costs for
which are dramatically reduced in comparison to helicopter based survey work.
Drill target identification and drilling will form part of the plan for the larger tenement areas that are
considered to have high prospectivity given their location within the Salinas formation proximal to a large
suite of S-type intrusive granites. Fieldwork labour hire is reasonably priced and will be executed by a local
contracting geological services provider based in Minas Gerais.
It is estimated that these works will begin shortly and continue over the following months, these are however
subject to change as the potential exists to accelerate timelines if a discovery is made as on-ground
knowledge is developed.
Initial indicators and impressions gathered from this site visit will continue to inform the Company’s approach
to exploration at both Caraíbas and Sidrônio over the coming months. This piece of work will form part of the
priority follow up field works to move the project areas toward drill target ready status.
MAILMAN HILL PROJECT (100% L1M)
The inaugural auger exploration campaign was completed during the Quarter (ASX Announcement 11 June
2024) targeting gold mineralisation and potential extensions to Cavalier Resources (ASX:
Share your feedback
Discover