Further Pegmatite Intersections at Dundas Project
Released
Released
Announcement PDF
ASX Announcement
1 September 2023
Further Pegmatite Intersections at Dundas Project
Lightning Minerals (L1M or the Company) is pleased to report that phase 1 exploration drilling on
tenement E63/2001 is now complete. The maiden drill program has successfully located pegmatite
producing hydrothermal systems within E63/2001. Following up on recent pegmatite intersections1
further pegmatites have been encountered in eight holes with the largest occurring in drill hole
DSRC0029 with three discrete intersections occurring between 52m to 93m down hole. Assays are
now pending for all drilling completed on tenement E63/2001.
HIGHLIGHTS
o
Phase 1 of the Company’s drilling campaign on tenement E63/2001 has now been completed
o
Significant new Reverse Circulation pegmatite intersections drilled under recent Aircore
drilling pegmatite discoveries include:
• Hole DSRC0029
o 12m from 52m to 64m
o 6m from 66m to 72m
o 17m from 76m to 93m
• 11m in Hole DSRC0027 from 12m to 23m
• 11m in Hole DSRC0028 from 73m to 84m
• 9m in Hole DSRC0026 from 39m to 48m
• 7m in Hole DSRC0030 from 33m to 40m
• 6m in Hole DSRC0032 from 49m to 55m
Infill soil sampling is ongoing on neighbouring tenement E63/2000 to follow up on positive
lithium in soil anomalism2 up to 218ppm lithium and an approximate 8km2 anomaly
o
A total of 159 exploration stage drill holes have been completed for 8,594m of total drill metres at the
company’s flagship Dundas project 34km east of Norseman in Western Australia. This program
comprised of 22 Reverse Circulation (RC) drill holes for 2,197m, and 137 Aircore drill holes for 6,397m.
Drilling initially targeted a combination of geophysical and geochemical targets including a lithium
and rubidium in soil anomaly within tenement E63/20013. This was identified as part of the Company’s
early aggressive exploration strategy across the Dundas group of tenements. The pegmatites
discovered under transported/alluvial cover have no outcropping or surface expression visible. They
broadly coincide with the delineated target areas providing the Company with confidence in its
exploration strategy.
Drill contractors Gyro Drilling Australia have now demobilised from site.
Note: The field lithological logging and subsequent reporting of pegmatites are not indicative of economic
pegmatite hosted mineralisation. No mineralogical confirmation or quantitative analysis has yet been completed.
Further exploration work including an assessment of the current drill sampling results and follow up drilling and
sampling will be required to confirm the presence of any mineralisation.
ASX Announcement 08 August 2023, 2ASX Announcement 23 March 2023, 3ASX Announcement 23 January 2023
1
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
Lightning Minerals Chief Executive Officer Alex Biggs said, “Completion of our inaugural drill
campaign has thus far proved successful in that it has identified a hydrothermal system with multiple
pegmatites under cover being intersected. We understand the region is a lithium rich district and our
exploration strategy is evolving as we understand more about the local geology. We have multiple
targets across our Dundas project area in proximity to known lithium resources and operating mines.
Our aim is to accelerate our exploration to test target areas effectively and efficiently. I commend the
team and our contractors on completing a safe, efficient and effective phase 1 drilling program and
look forward to updating the market in due course on further progress”.
NEW PEGMATITE INTERSECTIONS ON DUNDAS TENEMENT E63/2001
Further to the pegmatite intersections encountered during the recent Aircore program a limited
number of additional RC drill metres were allocated to ascertain the spatial orientation of pegmatites
to further aid in future exploration.
The follow up RC holes successfully intersected pegmatites beneath those identified by the earlier
Aircore drilling. The mineralogical assemblage present is consistent with that reported in the earlier
drilling which is a feldspar-quartz-mica dominant composition. The pegmatites exhibit a variable
grainsize with common chilling at the host rock contacts. There is also considerable interfingering with
host lithologies which suggests that the pegmatites may have intruded as a swarm with the potential
for multiple phases of intrusion.
The thickest downhole intersections have been returned from drillhole DSRC0029 that was drilled
under the pegmatite intercepts in Aircore holes DSAC0031 to DSAC0034. This hole returned three
pegmatitic rich zones from 52-64m, 66-72m, and 76-93m downhole (Figure 1 and Table 1). A full table of
downhole pegmatite intersections from the recent RC program are available in Appendix 1 - Table 2.
Chip tray photos of drillhole DSRC0029 are available in Appendix 2.
Figure 1: Geological cross section ‘A’ - interpreted pegmatite after intersections in holes DSAC0031DSAC0034, and DSRC0029 and DSRC0030.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
This result shows that the hydrothermal system responsible for the emplacement of the pegmatites
may be of a scale that presents exploration upside. Systems of this scale warrant further exploration,
the pending laboratory results are now an important part of better understanding these systems and
whether the pegmatites and geochemistry has a likelihood of becoming adequately fractionated in
this area to develop LCT pegmatite mineralisation.
Pathfinder elements from the pending analysis will be used for future targeting purposes, where
similar scale pegmatite bodies may be targeted under prospective geological horizons under areas
covered by salt lakes within E63/2001 to the north-west of drill holes DSAC0031 to DSAC0034.
Understanding if lithium endowment is present within these systems is now an important step forward
in progressing exploration works within the tenement. Laboratory geochemical and mineralogical
analysis is currently underway with all results expected in the coming weeks.
Figure 2: Drill location map showing RC drill areas and intersected pegmatite locations
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
Table 1: Latest RC program pegmatite intersections greater than 4m downhole on tenement E63/2001.
Tenement
Hole ID
Drill Type
From (m)
To (m)
Downhole Interval
(m)
Pegmatite (%)
Intersections
Degree of
Weathering
E63/2001
DSRC0026
RC
39
48
9
70
Moderate
E63/2001
DSRC0027
RC
12
23
11
100
Moderate
E63/2001
DSRC0027
RC
60
65
5
100
Fresh
E63/2001
DSRC0028
RC
20
25
5
100
Moderate
E63/2001
DSRC0028
RC
73
84
11
100
Fresh
E63/2001
DSRC0028
RC
113
117
4
90
Fresh
E63/2001
DSRC0029
RC
52
64
12
90
Low-Moderate
E63/2001
DSRC0029
RC
66
72
6
70
Low-Moderate
E63/2001
DSRC0029
RC
76
93
17
90
Fresh-Low
E63/2001
DSRC0030
RC
33
40
7
80
Moderate
E63/2001
DSRC0032
RC
49
55
6
90
Fresh-Low
OTHER EXPLORATION PROGRESS AT DUNDAS
An infill soil sampling campaign (ASX announcement 02 August 2023) is progressing well on
tenements E63/2000 and E63/1993 to further delineate an 8km2 lithium in-soil anomaly that has been
identified with assays up to 218ppm lithium. The results from this program will be used to define drill
targets for a program that can be scheduled to begin during Quarter 4 of CY2023.
Plans are being finalised for infill soil sampling programs to follow up previous results at the Company’s
Dundas North Project. Works are expected to begin during Quarter 4 of CY2023.
DUNDAS PROJECT (LIGHTNING MINERALS 100%)
The Dundas Project area is located near Norseman in Western Australia and comprises eight
tenements totalling approximately 454km2. Norseman has a strong history of mining dating back to
1892 and is located 190km south of Kalgoorlie. Historically, Norseman and the Dundas area has
experienced mining in gold and nickel although over recent years the region has become an emerging
lithium and critical minerals province with multiple discoveries and significant exploration activity.
There are two project areas at Dundas:
a) South/western tenements surrounding Liontown Resources’ Buldania/Anna lithium deposit, and,
b) North/eastern tenements approximately 30km to the east of Alliance Mineral Assets’ Bald Hill
lithium-tantalum mine.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
Figure 3: Location of Lightning Minerals’ Dundas projects
This announcement has been approved for release by Alex Biggs, CEO.
-end
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Stock Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas project is
located in the prolific Dundas region of Western Australia. The Company also has other projects in Western Australia, Mt Jewell,
Mt Bartle and Mailman Hill prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is a
full-time employee of the company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation and
types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429
8806
APPENDIX 1: DUNDAS – JORC CODE 2012 TABLE 1 CRITERIA
The Table below summarises the assessment and reporting criteria used for exploration results for the Dundas Exploration Project and reflects the guidelines in Table 1 of The Australasian Code
for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
•
•
No drill assays reported.
•
Aircore (AC) drilling samples are collected at 1m intervals from the beginning to the end of each AC hole. Drill sample piles
are placed in an orderly fashion on the drill site pad. When impenetrable lithologies are intersected a 90mm hammer is
used to re-enter the hole to continue drilling. When the hammer is used, a 2-3kg samples are taken from a cone splitting
device to provide drill sample for laboratory analysis.
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
•
Drilling techniques
Drill sample recovery
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Commentary
•
•
•
•
•
•
•
•
•
•
Reverse Circulation (RC) drilling samples are collected at 1m intervals from beginning to end of each RC hole. These samples
are placed into a HDPE bag and kept at each drill site location. A 2-3kg sample is split via a rig mounted cone splitter into a
numbered calico bag to provide representative drill sample for laboratory analysis.
Sampling was carried out using Lightning Minerals procedures and QAQC processes as per current industry standard
practice.
Drillhole collars are located using a Garmin Map 62s handheld device.
The RC drilling component of this announcement used a percussion face sampling hammer of 105mm diameter,
collecting chip samples at 1m intervals with each 1m pile placed into a HDPE bag on the drill site pad.
The AC drilling component of this announcement used an aircore blade drill bit of 90mm diameter, collecting samples at
1m intervals, with the drill sample being placed onto the drill site pad. When impenetrable lithologies are intersected by
the rotation blade bit, a 90mm percussion hammer is used to re-enter the hole to continue drilling.
Sample quality and % recoveries are recorded as a visual estimate percentage as part of the field drill rig geologist’s rig
data capture template.
Recoveries remained relatively consistent throughout the program.
The drill cyclone is cleaned frequently when drilling material that adheres to the cyclone out perimeter, and as required
when drilling harder lithologies that generate coarse rock chips.
Care was taken to ensure calico samples were of consistent volume and weight.
Samples are representative of the drilled intervals.
All drillholes are geologically domain logged by suitably experienced and qualified geologists.
Logging is both quantitative and qualitative in nature, including lithology, mineralisation, mineralogy, weathering, and
colour. Logging is of a standard able support future resource studies should they be required.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
•
•
A representative washed chip sample for each one-metre interval as placed in a chip tray for future reference.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
•
•
No drill sample assays have been reported in this announcement.
•
•
No drill sample assays have been reported.
•
No drill sample assays have been reported.
•
Handheld Garmin GPS instruments were used to geo locate each drill collar, these instruments are understood to be
accurate within a nominal ±5m in the horizontal and vertical planes.
•
•
•
•
Photographs are taken of chip trays for each drillhole and stored on L1M company servers.
The field lithological logging and subsequent reporting of pegmatites are not indicative of economic pegmatite hosted
mineralisation. No laboratory analysis results have yet been returned. Further exploration work including an assessment
of the current drill sampling results and follow up drilling and sampling will be required to confirm the presence of any
mineralisation.
A 2-3kg sample is split via cone splitter into a numbered calico bag to provide drill sample for laboratory analysis. This occurs
for both the RC and AC programs.
References to prior reports have adequate JORC Table 1 information contained within.
The level of topographic control offered by a handheld GPS is considered sufficient for early exploration drilling.
All samples were collected in the Geocentric Datum of Australia 1994 (GDA94) system. (MGA94, Zone 51)
The drilling spacing is considered appropriate for the reporting of the exploration results.
No Mineral Resource or Ore Reserve Estimates have been completed.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
•
•
One-metre RC drill hole chip samples were prepared for sample submission
•
The drilling of pegmatite units was targeted as best possible at this early stage of exploration activities. Field modifications
were made as best possible to intercept pegmatite perpendicular to the dip plane as per industry best practice.
Sample security
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
•
The chain of custody for sampling procedures and sample analysis was managed by the rig geologists during drilling.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
No audits or reviews of sampling techniques have been conducted to date.
Orientation of data in
relation to geological
structure
•
No sample compositing was applied.
New or poorly understood pegmatite units were targeted from both directions in order to establish a representative
intercept.
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
•
•
The Dundas Projects are located ~600km east of Perth and 20 to 50 km ENE of Norseman in Western Australia.
•
The Tenements are covered by the Ngadju Determined Native Title Claim (WCD2014/004). An agreement is in Place
between the Ngadju Native Title Aboriginal Corporation RNTBC and Lightning Minerals.
•
•
•
•
•
Geology
Drill hole Information
Deposit type, geological setting and style of mineralisation.
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o
easting and northing of the drill hole collar
The Dundas Project area totals ~450km2 and comprises eight granted exploration licences separated into two exploration
areas – Dundas North (E28/3027 and E28/3028) and Dundas South (E15/1748, E63/1932, E63/1993, E63/2000, E63/2001,
and E63/2028)
The Tenements are considered in good standing at the time of this report.
The Dundas South Project area has been explored predominantly for gold and nickel by various prior parties.
More recent exploration has included a focus on Lithium via explorers such as Matsa Resources (2008-2018), West
Resource Ventures (2018 – 2019), and Liontown Resources (2018-2020).
The result of this work is described in numerous publicly available Geological Society of Western Australia publications.
Review of the considerable historic exploration activities is ongoing; data is being collated into company databases as per
industry standard data collection practice.
•
•
No known mineral deposits occur within project tenure.
•
The Dundas Project is located at the southern-eastern end of the Norseman-Wiluna Belt within the Archaean Yilgarn
Craton. The project area sits adjacent to the Jerdacuttup Fault which represents the boundary or the Archaean Yilgarn
Craton with the adjacent Proterozoic Albany-Fraser Province.
•
•
•
The mineralisation style related to this release are metals related to lithium-caesium-tantalum (LCT) pegmatites intrusives.
There are publicly reported occurrences of LCT pegmatites within an acceptable proximity to the Dundas Project
exploration tenure. (Liontown Resources (ASX:LTR) – Buldania Deposit)
Eight (8) previously unreported RC holes were drilled totalling 829m.
Twenty two (22) RC holes for a total of 2,197m were drilled during the maiden drill campaign.
One hundred and thirty seven (137) AC holes for a total of 6,397m were drilled during the maiden drill campaign.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
o
Data aggregation
methods
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
down hole length and interception depth,
o
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
These relationships are particularly important in the reporting of Exploration
Results. If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported. If it is not known and only the
down hole lengths are reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling). Diagrams clearly
highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not
commercially sensitive.
•
•
Relevant drill hole information has been provided in this release.
•
•
No levelling of the
Share your feedback
Discover