High Grade Gold Intersected at Mt Turner Project
Released
Released
Announcement PDF
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
High Grade Gold Intersected at Mt Turner Project
20.4m @ 2.4g/t Au (from 63m) inc 1.9m @ 10.5g/t Au
ASX Announcement
21 October 2025
Lightning Minerals Ltd (L1M or the Company) is excited to provide an update on results of its inaugural drilling
campaign at its wholly owned Mt Turner Gold Project in Queensland, Australia.
HIGHLIGHTS
• Significant gold potential confirmed at Mt Turner from first holes of fully funded 9-hole
campaign
o Hole 25L1MP3DD001 (Pit 3): 20.4m @ 2.4g/t Au and 14.3g/t Ag from 62m, including
1.8m @ 10.6g/t Au and 27.1g/t Ag from 77m
o Hole 25L1MP5DD001 (Pit 5): 8m @ 1.4g/t Au and 4.8g/t Ag from 77.8m
o Hole 25L1MP5DD001 (Pit 5): 2m @ 1.3g/t Au and 1.6g/t Ag from 117m
o Hole 25L1MP5DD001 (Pit 5): 1.9m @ 0.9g/t Au and 7.1g/t Ag from 127m
• Drilling is ongoing with 8 holes completed of the 9 planned holes
• Initial assay results confirm near surface high grade epithermal gold mineralisation
• Soil sampling and rock chip sampling has been completed along the Drummer Fault and
around prospects of interest (assays pending)
• Inaugural drill program designed to test potential extension of shallow mineralisation
below historic workings
Assay results from the first three holes of a nine-hole program targeting fertile structures have demonstrated
the presence of shallow, breccia hosted, high-grade epithermal gold mineralisation over significant widths.
Peak assay results from Hole 25L1MP3DD001 of 10.6g/t Au and 27.1g/t Ag over 1.8m from 77m downhole
demonstrate the high-grade gold potential of the Mt Turner Project. Additionally, wider intersections
demonstrate the scale potential of the project including results from Hole 25L1MP3DD001 yielding 2.4g/t Au
and 14.3g/t Ag over 20.4m from 62m down hole (true width 15m).
Drilling is ongoing at Mt Turner with eight of the planned holes completed. Mineralisation remains open
both at depth and along strike with multiple drill holes still pending results. Multiple targets are yet to be
drilled along the 14km Drummer Fault. The current drill program has only targeted shallow mineralisation
down to around 100m below surface. This highly encouraging start to the drill program provides strong
impetus for the Company to further its exploration activities across the project area with the potential to
define a significant gold system. Follow-up drilling is being planned to target both down dip and along
strike from recent intercepts.
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Lightning Minerals’ Managing Director Alex Biggs said, “Excellent results from the first round of assays at the
Mt Turner project have demonstrated to us the grade and scale potential that this project represents to the
Company. Results demonstrate continuation of the gold bearing ore zone down dip and we are still only at
shallow depths with mineralisation open at depth and along strike. It should be noted that this is only one
target area and with 14km of strike along the Drummer Fault to explore we have many other drill targets for
execution. To have intersected epithermal style mineralisation is also a big positive as we understand that
typically this represents potential for higher gold grades. As drilling progresses our thesis is evolving on the
nature, style and potential that the Mt Turner project represents. We believe we are well positioned for
discovery of a significant high grade gold project.
Having exposure to the current gold market with a high-quality project of scale, multiple drill targets with high
grades is an exceptional opportunity for Lightning Minerals and we are highly encouraged by the potential
scale of opportunity at this exciting project. These results are only the start, and we are looking forward to
updating the market in the coming weeks with further results as we complete our inaugural drill program.
Well done to the team on the ground at Mt Turner for working safely, diligently and efficiently”.
Assays Confirm Near Surface High Grade Epithermal Gold Mineralisation
Hole 25L1MP3DD001 (Pit 3) - 10.6g/t Au and 27.1g/t Ag over 1.8m from 77m Downhole
The first three diamond drill holes have been positioned to test for previously unrecognised breccia hosted
gold and silver mineralisation beneath several shallow historical pits mined for oxide gold in the 1990’s,
namely Pit 3 (Drummer West), Pit 4 (Drummer Boy), and Pit 5 (Drummer Girl) which are located along the
Drummer Fault directly to the north of the Mt Turner Porphyry system.
Peak assay results from Hole 25L1MP3DD001 of 10.6g/t Au and 27.1g/t Ag over 1.8m from 77m downhole
were received from drilling at Pit 3 (Drummer West). Examples of drill core from Pit 3 are shown in Figures 1
and 2. Early-stage pyrite and silicified breccia clasts that have been fractured and infilled/flooded by multi-
phase fine grain silica (white and grey) with gold and silver associated with the fine-grained silica phases.
Pit 3 has the strongest occurrence of epithermal breccia, followed by Pit 5. No epithermal breccia was
observed during drilling at Pit 4, suggesting mineralisation in this location may be related to orogenic quartz
veining.
Figure 1 Epithermal style breccia hosted mineralisation (78.1m, Drill Hole 25L1MP3DD001)
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 2 Epithermal breccia mineralisation (79.4m, Drill Hole 25L1MP3DD001)
Wide Intersection Demonstrates Scale Potential Close to Surface
Hole 25L1MP3DD001 (Pit 3) - 20.4m @ 2.4g/t Au and 14.3g/t Ag from 63m
The downhole intersection of 20.4m (true width 15m) recorded in Hole 25L1MP3DD001 is encouraging as it
aligns with the dimensions of Pit 3 (Drummer West) and demonstrates continuity of mineralisation down dip
from historic drilling. The grade and scale on the intersection are highly encouraging, particularly taking into
account its close proximity to surface and the significant increase in grade from historic RC drill intercepts
completed in 2021. Planning is currently underway to test further potential at depth and along strike.
Cross-section and plan view of Hole 25L1MP3DD001 is shown in Figure 3 and Figure 4 respectively.
The initial drill hole 25L1MP5DD001 into Pit 5 (Drummer Girl) is encouraging with multiple intersections of
mineralisation encountered including an 8m downhole intercept grading 1.4g/t Au and 4.8g/t Ag. A further
two holes have been completed at Pit 5 with assay results pending at the laboratory.
Cross-section and plan view of Hole 25L1MP5DD001 is shown in Figure 5 and Figure 6 respectively.
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 3: Cross-section of Hole 25L1MP3DD001 and historic hole 21ISMP3RC001 (Drummer West - Pit 3)
Figure 4: Plan view of Hole 25L1MP3DD001 and historic hole 21ISMP3RC001 (Drummer West - Pit 3)
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 5: Cross-section and plan view of Hole 25L1MP5DD001 (Drummer Girl - Pit 5)
Figure 6: Plan view of Hole 25L1MP5DD001 (Drummer Girl - Pit 5)
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Mt Turner Project Location and Prospectivity
The Mt Turner Project is located 15km to the northwest of Georgetown in North Queensland. The
Project is held through granted Exploration Permits (EPM 27170 and EPM 27525) and will be explored
by the Company with the intention of identifying an economic gold resource with accessory silver along
the Drummer Fault structure, a 14 km east-west structure readily visible on LiDAR and satellite imagery.
Historically, several shallow oxide pits were mined for gold in the 1990’s along the Drummer Fault. In
addition, northeast trending structures have intersected the Drummer Fault in numerous locations.
These structures have potential to form higher-grade mineralisation and are thus a high priority target.
There are multiple existing mineralised targets along the Drummer Fault and below the current open
pits.
Prior drilling1
has been completed by Essex Minerals Inc2
during 2021, Union Mining NL3
in the 1990s,
and CRA Exploration Ltd4
in the late 1980’s intersecting multiple gold lodes with positive results
including 16m @ 3.56 g/t Au (Hole UMDT95_D04), 16.0m @ 3.60g/t Au (Hole UMDT95_D03), 12m @
6.5g/t Au (Hole UMDT95_D03) and 6m @ 2.9g/t Au (Hole PD86_RR2). These results formed the basis
for shallow oxide open pit mining across six open pits in the 1990’s. Minimal exploration has occurred
beneath the historical open pits but multiple targets exist with shallow mineralisation intercepts of up
to 7.0m @ 1.74g/t Au and 67.7g/t Ag from 64m downhole (Hole 21ISMP3RC001).
Figure 7: Isometric view of Mt Turner Project demonstrating Drummer Fault and drilling areas including
current drill hole status
Geology and Gold Potential at Mt Turner
The Permo-Carboniferous, Mt Turner Porphyry System is a multi-stage felsic magmatic event localised
by NW-NE conjugate faults. The system is characterised by a number of felsic quartz eye intrusive stocks
and associated rhyolite dyke swarms that emanate some distance from the intrusive centre. The system
hosts a 6-kilometre diameter magmatic hydrothermal system characterised by a pervasive alteration halo
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
with historical soil data displaying a classic porphyry metal zoning pattern from an inner Cu-Mo core
surrounded by a base metal-gold zone.
The Company has adopted a targeted exploration model whereby peripheral structures and breccia
bodies may host significant precious metal low temperature epithermal style mineralisation. Structural
analysis from geophysics and acquired LiDAR topography has demonstrated the existence of a number
of prospective peripheral structures and breccia bodies interacting with rhyolite volcanics. Prospective
structures were rated on the basis of strike length, historical mining, host rock lithology (Proterozoic
basement mafic rocks were considered high priority) and proximity to the Mt Turner porphyry system.
The 14 kilometre east-west trending, regional Drummer Fault and associated splay structures was
considered to be of the highest priority. The fault has been intruded by Permo-Carboniferous sub-
volcanics and volcanic lithologies with wide -ranging compositions and alteration intensity from mafic
dykes to rhyolite to fine grained granite. Fault splays, tensional jogs and horse-tailing have been
recognised from analytical signal aero-magnetics which indicates potential tensional zones conducive
for mineralisation. The current drilling program is testing some of these prospective tensional zones
along the fault.
The second structure prioritised during this initial program was the Cobar Line Structure consisting of a
kilometre long north south feature associated with the Mt Turner rhyolite dyke swarm immediately south
of the porphyry system.
Diamond core drilling has been selected as the current exploration method. While more expensive than
alternative drilling techniques, it provides intact geological samples that can be inspected for structural
features, chemical alteration, and rock textures, including carrying out petrographic studies on selected
thin sections. This detailed information enables discrimination between orogenic, porphyry, and
epithermal mineralization styles, including identification of minerals and mineral associations.
Table 1: Drill Hole Location for Significant Intercepts
Hole ID Hole Type
Easting
GDA94z54
(m)
Northing
GDA94z54
(m)
RL
AHD
(m)
Azimuth
Grid
(°)
Dip
(°)
Hole Depth
(m)
25L1MP3DD001 Diamond 756,993 7,983,247 283 356.0 -55 120.1
25L1MP5DD001 Diamond 755,910 7,983,102 277 1.0 -55 140.7
Table 2: Drill Hole Significant Intercepts
Hole ID Hole Type
Depth From
(m)
Depth To
(m)
Interval
(m)
Au
(ppm)
Ag
(ppm)
25L1MP3DD001 Diamond 62 82.4 20.4 2.4 14.3
Including 77 78.8 1.8 10.6 27.1
25L1MP5DD001 Diamond 77.8 85.8 8 1.4 4.8
Including 83.9 85.8 1.8 5.4 16.3
25L1MP5DD001 Diamond 117 119 2 1.3 1.6
25L1MP5DD001 Diamond 127 128.9 1.9 0.9 7.1
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Next Steps – Defining an Extensive Gold and Silver System at Mt Turner
The inaugural drill program at Mt Turner is nearing completion with the final hole currently being drilled at
Pit 6 (Rocky Reward) six kilometres west of Pit 5 (Hole25L1MP3DD001) where previous drilling has not yet
tested extensions to mineralisation below and along strike from the existing open pit. Assays are pending
for four holes, two which have been drilled in the locality of the Drummer Girl Pit (Pit 5), targeting gold and
silver mineralisation and two that have been drilled at the Cobar Line prospect targeting primary silver and
gold mineralisation. Assays are expected within four weeks.
Soil and rock chip sampling has been completed along the Drummer Fault and around prospects of interest,
identified through field reconnaissance and mapping, assay results are expected within four to six weeks.
These results will further assist in supporting a larger scale targeting exercise on prospects within the
broader Mt Turner Project area.
The Company’s geology team is planning additional drilling to follow up on areas of interest and positive
drilling results. Once all assays are received a focused plan will be finalised for drilling and further
exploration in 2026.
REFERENCES
1
Prior drilling results contained within this document have been reviewed and compiled by the Competent
Person and reported in accordance with JORC Code 2012. See Company Announcement 30 June 2025 -
Acquisition of Advanced Brownfields Gold and Copper Projects
2
Essex Minerals (TSX-V:ESX) TSXV Announcement - Essex Reports Numerous High-Grade Gold Intercepts
At Drummer Fault, October 13, 2021 (https://essexminerals.com/wp-content/uploads/ESX-2021-10-13-
NR-Drummer-Fault-Drilling-FINAL.pdf)
3
Essex Minerals (TSX-V:ESX) TSXV Announcement – ESSEX Samples Up to 14.55 G/T Gold Extending Gold
Mineralisation Along Drummer Fault, Mt Turner Gold Project (https://essexminerals.com/wp-
content/uploads/ESX-2021-07-13_NR-Mt-Turner-Exploration-FINAL.pdf)
4
CRA Exploration Ltd 1987 - Clark Creek A to P 4416M, North Queensland, Report On Investigations For
The First Six Months Of Tenure, https://geoscience.data.qld.gov.au/data/report/cr016859
Approved for release by the Board of Directors
-END-
More information at www.lightningminerals.com.au
l 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Securities Exchange (ASX:L1M) and focused on
the exploration of gold, critical minerals and lithium. The Mt Turner gold and copper project provides the Company with access
to these strong markets through near term, brownfields projects in Australia as well as the Boree Creek copper and gold
porphyry project in the Lachlan Fold Belt of NSW. The Company also owns the Caraíbas, Canabrava and Esperança lithium
projects in Minas Gerais, Brazil, the Dundas projects in Western Australia, the Dalmas and Hiver lithium projects in Quebec,
Canada. The Company also holds other projects in Western Australia which include Mt Bartle and Mailman Hill which are
prospective for gold, base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs
or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration
and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades
of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the
future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel,
industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr
Matthew Watson, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Watson
is a full-time employee of the Company. Mr Watson has sufficient experience which is relevant to the style of mineralisation and
types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Watson consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Watson holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Appendix 1: Mt Turner Project – JORC Code 2012 Table 1 Criteria
The Table below summarises the assessment and reporting criteria used for exploration results for the Mt Turner Project and reflects the guidelines in Table 1 of The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
Section 1 - Sampling T
echniques and Data
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
With respect to the 2025 drilling by Lightning Minerals
• Drilling consisted of 3 HQ diamond holes.
• All samples were processed in Townsville by ALS Global, an independent accredited laboratory. Gold assays were
completed by 50g screen fire assay with atomic absorption finish. Silver and 33 multi-element analysis was undertaken by
a four-acid digest followed by inductively coupled plasma atomic emission spectroscopy (ICPAES).
With respect to the 2021 drilling by ISMINS on behalf of Essex Minerals2
• Drilling consisted of two HQ diamond holes with RC pre-collars, the remaining four holes were completed as Reverse
Circulation using a 4.5-inch drill bit, and a cone splitter.
• All samples were processed in Townsville by ALS Global, an independent accredited laboratory. Gold assays were
completed by 50g screen fire assay with atomic absorption finish. Silver and 33 multi-element analysis was undertaken by
a four-acid digest followed by inductively coupled plasma atomic emission spectroscopy (ICPAES).
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
With respect to the 2025 drilling by Lightning Minerals
• Drilling consisted of 3 x HQ3 diamond holes.
• Core was orientated using a Reflex Act III down hole survey tool.
With respect to the 2021 drilling by ISMINS on behalf of Essex Minerals2
• Drilling consisted of two HQ diamond holes with RC pre-collars, the remaining four holes were completed as Reverse
Circulation using a 4.5-inch face sampling drill bit.
• Core was not orientated.
Drill sample recovery Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
With respect to the 2025 drilling by Lightning Minerals
• Core sample recoveries were quantitatively measured comparing length of core recovered vs expected length as recorded
on the driller run sheet. Drilling consisted of 3 HQ diamond holes. Core recovery average 94% over 102m of samples
submitted for assay.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
• The drilling rate was purposefully slowed in through brecciated ground to improve core recovery.
• No relationship has been established between sample recovery and grade. No sample bias has been observed due to
preferential loss/gain of fine/coarse material.
With respect to the 2021 drilling by ISMINS on behalf of Essex Minerals2
• Core sample recoveries were quantitatively measured comparing length of core recovered vs expected length as recorded
on the driller run sheet. Drilling consisted of 2 HQ diamond tail holes. Core recovery average 98% over 200m of drilling.
• The drilling rate was purposefully slowed in through brecciated ground to improve core recovery.
• No relationship has been established between sample recovery and grade. No sample bias has been observed due to
preferential loss/gain of fine/coarse material.
• No sample recovery information is available for the RC pre-collars and drill holes.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
With respect to the 2025 drilling by Lightning Minerals
• The drill core has been qualitatively logged by geologists with experience in orogenic, epithermal and porphyry
mineralisation systems. The diamond core logging has recorded colour, texture, grainsize, weathering, alteration and
minerals present in the drill core. The reported drill holes have been logged in full.
• Core has been photographed in the wet form. Core photography is currently ongoing.
With respect to the 2021 drilling by ISMINS on behalf of Essex Minerals2
• The RC chips have been qualitatively logged by geologists with experience in orogenic, epithermal and porphyry
mineralisation systems. The RC logging has recorded colour, texture, grainsize, weathering, alteration and minerals present
in the drill core. The reported drill holes have been logged in full.
• The availability of chip tray photography is currently unknown.
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
With respect to the 2025 drilling by Lightning Minerals
• The drill core was drilled with HQ3 size and sampled as complete half core to produce bulk sample for analysis. Intervals
selected varied from 0.5m to 1.6m (minimum-maximum), with a nominal sample length of 1m. The core is cut in half length
ways just to the right of the orientation line where available using a diamond core saw. All samples are collected from the
same side of the core where practicable. Assay preparation procedures ensure the entire sample is first crushed coarse
crushed, then fine crushed to better than 85% mass passing 3.15mm screen sizing, with a 250g rotary split taken and
pulverised to 75 microns, from which a sub‐sample is taken for analysis. This removes the potential for the significant sub‐
sampling bias that can be introduced at this stage.
• No second-half sampling of the core has not been undertaken.
With respect to the 2021 drilling by ISMINS on behalf of Essex Minerals2
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
• The RC chips were drilled with 4.5” face sampling hammer. Samples were taken at 1m Intervals. The core is cut in half
length ways just to the right of the orientation line where available using a diamond core saw. Assay preparation procedures
ensure the entire sample is pulverised to 75 microns, from which a sub‐sample is taken for analysis. This removes the
potential for the significant sub‐sampling bias that can be introduced at this stage.
• No second-half sampling of the core was undertaken. No field duplicates were submitted to the laboratory.
Quality of assay data and
laboratory tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision
Share your feedback
Discover