Supplementary information to ASX announcement on 1 July 2026
Released
Released
Announcement PDF
A. 32 Harrogate Street, West Leederville Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
ASX ANNOUNCEMENT
3 July 2026
1
SUPPLEMENTARY INFORMATION - PETROLOGY CONFIRMS RHYOLITE
INTRUSION HOSTED GOLD MINERALISATION AT MT TURNER
Lightning Minerals Ltd (Company) refers to its ASX announcement dated 1 July
2026 titled “PETROLOGY CONFIRMS RHYOLITE INTRUSION HOSTED GOLD
MINERALISATION AT MT TURNER.”
The Company provides the attached JORC Table 1 as supplementary information
to the announcement.
~ Ends ~
This announcement has been authorised for release by the Board of Lightning Minerals Limited.
For more informa:on, please visit: lightningminerals.com.au
Enquiries in rela3on to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Corporate Story3me
Troy Brice Paul Berson
Chief Execu:ve Officer Investor & Media Rela:ons
Phone +61 8 9429 8806 Phone +61 421 647 445
admin@lightningminerals.com.au paul@corporatestory:me.com
A. 32 Harrogate Street, West Leederville Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
2
About Lightning Minerals Ltd (ASX: L1M)
Lightning Minerals Limited is an Australian exploration and development company focused
on advancing a portfolio of gold and copper assets in Tier 1 mining jurisdictions.
The Company’s flagship asset is the wholly owned Mt Turner Gold Project in northern
Queensland, which hosts a large-scale gold system extending over approximately 14km of
strike along the prospective Drummer Fault. Mt Turner is the primary focus of exploration,
with ongoing drilling aimed at progressing the project toward resource definition and
development.
Lightning Minerals also holds a pipeline of gold and copper projects across Australia,
including assets in the Lachlan Fold Belt in New South Wales and the Eastern Goldfields of
Western Australia, providing additional exploration upside and growth opportunities.
The Company’s objective is to create long-term shareholder value through disciplined
exploration, resource growth and the development of high-quality mineral assets.
Figure 3: Location of Lightning Minerals Australian Gold and Copper Projects
1
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Petrology samples were secured from 14 locations from 6
diamond holes drilled in 2025, refer to Table 1 in this
announcement.
• Samples were selected based on previous logging from
intervals that were deemed critical in understanding the host
lithology, alteration and mineralization
• No assays were undertaken
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Diamond core HQ3
• Reported in ASX Announcements dated: 21/10/2025,
10/11/2025 and 17/11/2025.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• As above
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• As above
2
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Core has been previously sawn and cut into half core, as
reported in previous announcements
• Approximate 3cm wide portions of core to be sampled for
petrology were sawn from existing core placed into sealed
packets, labelled and dispatched to UNSW
• Thin sections and polished sections were prepared by UNSW
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• No assay data was generated
• The petrographic analysis at UNSW was undertaken using
‘standard’ procedures as follows:
o Macroscopic description – hand specimen
o Microscopic description – polished thin-section
I. Texture
II. Mineralogy (individual mineral descriptions)
III. Mineralisation (in reflected light – sulfides, oxides)
IV. Alteration (mineral assemblages and intensity)
• Analysis techniques: Thin sections were examined under a
doubly polarising microscope (a Leica DM 4500P, petrological
microscope) under magnifications from 10X to 500X and
images directly taken using a Leica digital camera system with
accompanying Leica software.
• Traditional microphotography of rocks uses a doubly
polarising transmitted light microscope, which passes white
light through sections of rock cut to a standard thickness of
0.03 mm, at which thickness most minerals become
transparent or translucent. In all of the photomicrographs a
3
Criteria JORC Code explanation Commentary
scale bar is given in either mm or microns (µm).
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Previously reported
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Not applicable
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Not applicable
Sample
security
• The measures taken to ensure sample security. • Chief measure to ensure sample security was the adoption of an
internal chain of custody. Samples were delivered from the field
and delivered to UNSW
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No audits undertaken
4
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• The Mt Turner Project includes exploration licences EPM27525,
and EPM27170.
• The Tenements are considered to be in good standing at the
time of this announcement
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • Exploration undertaken by prior parties includes:
• Essex Minerals 2020-2022
• Meryllion Resource Corp 2020-2022
• KNX Resources Australia 2015-2020
• Mega Uranium 2006-2014
• Union Mining 1993-2003
• CRA Exploration 1985-1990
Geology • Deposit type, geological setting and style of mineralisation. • Back arc epithermal and porphyry related
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• Previously reported ASX Announcements of 21/10/2025,
10/11/2025 and 17/11/2025.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
• Not applicable
5
Criteria JORC Code explanation Commentary
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Not applicable
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Sections were drafted and previously reported refer 2025
announcements
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Assay data included in announcement was previously reported
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• All meaningful data and relevant information have been
included in the body of previous announcements
Further work • The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Further exploration drilling is planned in 2026 as indicated,
utilising petrology to guide drilling
Share your feedback
Discover