Major Molybdenum Porphyry Target Emerges at Mt Turner
Released
Released
Announcement PDF
08 October 2026
Major Molybdenum Porphyry Target Emerges
at Mt Turner
________________________________________________________________________________________
Highlights:
• Compelling Climax-style porphyry molybdenum target identified at the 3.7 km²
Eastern Rhyolite Complex (ERC) within the Mt Turner Project: integrated geological,
geochemical and geophysical signature consistent with a high-priority, Tier 1
exploration target
• Three independent exploration vectors converge: ~600m x 400m annular
molybdenum (Mo) soil anomaly (>30 ppm Mo), coincident IP chargeability response at
~120m depth indicating potential sulphides, and oxidised stockwork veining at surface
with handheld XRF readings up to 1,400 ppm Mo
• Target is undrilled: no previous drilling despite multiple converging vectors within a
classic porphyry setting displaying rhyolite dyke swarms, pervasive sericite alteration
and fluidised breccias
• Confirms the exploration model for Mt Turner of a centralised Porphyry system with
peripheral gold mineralisation, localised by surrounding structures
• Copper potential at depth: strong IP chargeability anomaly at ~120m depth may
indicate sulphide mineralisation including copper, to be confirmed by drilling
• An Internal review integrates approximately 3,500 historical soil samples with
reprocessed aeromagnetic and induced polarisation data to unlock the target; 49
confirmatory soil samples submitted for laboratory analysis, results pending
• Adds strategic critical mineral (molybdenum) and potential copper optionality to
L1M's Priority One Mt Turner Project, which already hosts a 14 km gold system along the
Drummer Fault and Western Zone gold Soil Anomaly
• Engage with this Announcement via InvestorHub:
https://lightningminerals.com.au/link/eW1RwP
Lightning Minerals Limited (ASX: L1M) (“Lightning” or “the Company”) is pleased to report
the identification of a major, undrilled molybdenum target at the Eastern Rhyolite Complex
("ERC") within its wholly owned Mt Turner Project in Queensland (Figure 1).
The integrated geological, geochemical and geophysical signature is interpreted as consistent
with a classic Climax-style porphyry molybdenum system. The ERC is one of several gold,
copper and molybdenum prospects located within the Mt. Turner Project (Figure 2).
2
The target was identified through an internal review of the Company's historical geochemical
and geophysical data. The review highlighted a broad, strongly anomalous molybdenum-in-soil
anomaly coincident with a strong IP chargeability response (> 30 milli secs/sec) and surface
stockwork veining. L1M has completed a confirmatory soil program and submitted 49 samples
for laboratory analysis.
The Company considers the co-incidence of historical soils exhibiting an annular >30 ppm Mo
anomaly (well above baseline anomaly thresholds), underlying high intensity I.P. chargeability
anomaly and surface leached, stock-work mineralised outcrop represents a well-defined, high
priority, Tier 1 exploration target.
Figure 1. Queensland Regional Map - Mt. Turner Project location
Lightning Minerals Managing Director, Troy Brice, commented:
“The Eastern Rhyolite Complex has emerged as a compelling new target from our systematic
review of Mt Turner's extensive historical datasets. What makes this particularly compelling is
the convergence of three key and independent indicators. It confirms our exploration model of
a centralised Porphyry system with peripheral gold mineralisation, localised by surrounding
structures.
The 49 soil samples now at the laboratory will validate the anomaly and define drill targets.
Molybdenum is increasingly recognised as a strategic critical mineral, and identifying a target of
this calibre is an excitingdevelopmentfor shareholders. This target is undrilledand thepotential
for associated copper mineralisation beneath the oxide zone adds further optionality."
3
Figure 2. Map of Mt Turner key targets, including the ERC (Mo-Cu) target, over Aeromagnetic FVD.
4
EASTERN RHYOLITE COMPLEX INTEGRATED TARGET FEATURES
DATASET OBSERVATION EXPLORATION RELEVANCE
Historical soil geochemistry
Approximately 600 m by 400 m
area containing historical soil
values above 30 ppm Mo.
Defines a broad surface
geochemical footprint.
Induced polarisation
geophysics
Strong chargeability anomaly
coincident with the historical
soil anomaly and interpreted at
approximately 120 m vertical
depth.
Provides a subsurface
geophysical vector indicating
potential sulphides.
Geology and alteration
Pervasive sericite altered multi-
phase rhyolitic intrusions and
dyke swarms within intensely
fractured granitic basement.
Supports Climax style
exploration model.
Surface mineralisation
Oxidised stockwork veining
observed at surface.
Indicates potential near
surface mineralisation
Handheld XRF
Indicative readings of up to
1,400 ppm Mo from limonitic
stockwork veins.
Screening data only; laboratory
assays are required for
confirmation.
CONFIRMATORY SOIL PROGRAM
L1M has completed a confirmatory soil sampling program across the historical molybdenum
anomaly. A total of 49 samples have been submitted for laboratory analysis (refer to Figures 3 &
4). The program is intended to test the repeatability and continuity of the historical molybdenum
response in two locations as a basis for developing immediate drill targets. Assay results are
pending. The Company will report material results after receipt, validation and interpretation in
accordance with the ASX Listing Rules and the JORC Code.
5
Figure 3. Map of ERC historical Mo Anomaly (yellow), I.P Chargeability (pink) and Soil sample
Validation Sites (White) over LiDAR DEM (Digital Elevation Model)
ERC encompasses an area of 3.7 square kilometres of back-arc, multi-phase felsic rhyolites and
quartz eye porphyry intrusives into basement granite.
The intrusives are associated by rhyolite dyke swarms, multi-phase breccias, and stock work
veining in granite. The rhyolites, porphyry and granite have been extensively fractured and
pervasively altered. Petrological observations indicate accessory fluorite within the rhyolitic
intrusives.
6
An historical, extensive, annular Mo anomaly in soils overlies an intense chargeability anomaly
at a vertical depth of 120 metres (surface rocks are heavily oxidised and have been leached of
sulphides). The Mo anomaly is also characterised at surface by multi-phase, stock-work quartz
veining with limonite filled fractures. Hand-held XRF (HHXRF) measurements of these fractures
have returned up to 1400 ppm Mo (figure 4).
The geological setting and associated rock types display the classic characteristics of a Climax-
type Mo porphyry system. These include:
• high fluorine levels
• highly anomalous Mo in soils
• surface stock-work veining with highly elevated Mo
Figure 4. ERC multi-phase, oxidised, stock- work veining in outcrop recorded during confirmatory
soil sampling, GPS co-ordinates 759408mE 7981206mN.
STRATEGIC ALIGNMENT WITH MT TURNER GOLD + COPPER PROJECT
The ERC program directly supports L1M's 2026-2029 Strategic Plan, which identifies Mt Turner
as the Company's Priority One flagship asset with the objective of advancing it toward a
recognised district-scale gold and copper project supported by maiden JORC Mineral
Resources.
This work:
• Confirms the exploration model for Mt Turner of a centralised Porphyry system with
peripheral gold mineralisation, localised by surrounding structures
7
• adds a Climax-style molybdenum target to the Mt Turner pipeline
• integrates ~3,500 historical soil samples with reprocessed geophysics to unlock a
previously unrecognised target
• broadens the district's commodity exposure to include strategic critical minerals
• establishes a pathway to drill testing following laboratory validation
Importantly, the molybdenum anomaly has not yet established the presence of associated
copper mineralisation. Copper is highly mobile in the surface environment and may not report
in surface sampling, while molybdenum is relatively immobile. The strong IP chargeability
response at depth indicates the potential presence of sulphides beneath the oxide zone. Drilling
will test for associated copper mineralisation, which if confirmed could materially enhance the
target's significance.
NEXT STEPS
• receive and validate the 49 laboratory assay results;
• undertake targeted geological mapping and follow-up surface sampling across
observed stock work veining within the confirmed Mo anomaly
• use these vectors to target a maiden reconnaissance style drill program
-end-
REFERENCES TO PREVIOUS ASX ANNOUNCEMENTS
16 April 2026 – Strategic Plan and Portfolio Simplification.
29 July 2026 - Investor Presentation – Unlocking a New District-Scale Gold System.
29 September 2026 – Investor Presentation – High Grade Tungsten. District Scale Gold
This announcement has been authorised for release by the Board of Lightning Minerals Limited.
For more information, please visit: lightningminerals.com.au.
Enquiries in relation to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Tau Media
Troy Brice Jessica Fertig | +61 408 855 855
Managing Director Investor & Media Relations
admin@lightningminerals.com.au ir@lightningminerals.com.au
8
About Lightning Minerals Limited (ASX: L1M)
Lightning Minerals Limited is an Australian mineral exploration company focused on gold, copper,
molybdenum and tungsten opportunities within its Australian project portfolio. The Company’s principal
asset is the wholly owned Mt Turner Project in northern Queensland. Exploration at Mt Turner is focused on
gold, copper and molybdenum mineralisation. The Company is undertaking systematic exploration, including
geochemical sampling, geophysical surveys, geological interpretation and drilling, to progressively evaluate
the project’s mineral potential and advance priority targets.
Lightning Minerals also holds the Warby Project in northern Queensland, a rapidly advancing tungsten
exploration opportunity and an important component of the Company’s critical-minerals strategy.
Systematic exploration is being undertaken to evaluate the extent and continuity of tungsten mineralisation,
refine priority target areas and inform subsequent phases of exploration.
The Company’s Western Australian gold projects provide additional exploration and asset- development
depth, complementing the Company’s priority activities at Mt Turner and contributing to a broader pipeline of
gold opportunities. Lightning Minerals’ strategy is to create long-term shareholder value through disciplined
exploration, technically driven target generation and responsible capital allocation.
Lightning Minerals Project Map
9
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking
statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”,
“intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production
or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may
cause the Company’s actual results, performance and achievements to differ materially from any future results,
performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices,
foreign exchange fluctuations and general economic conditions, increased costs and demand for production
inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary
licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the
regulatory framework within which the Company operates or may in the future operate, environmental conditions
including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and
litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to
the financial, market, regulatory and other relevant environments that will exist and affect the Company’s business
and operations in the future. The Company does not give any assurance that the assumptions on which forward
looking statements are based will prove to be correct, or that the Company’s business or operations will not be
affected in any material manner by these or other factors not foreseen or foreseeable by the Company or
management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or
results to differ materially from those disclosed in forward looking statements, there may be other factors that
could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended,
and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to
place undue reliance on forward looking statements. Forward looking statements in these materials speak only at
the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing
rules, in providing this information the Company does not undertake any obligation to publicly update or revise any
of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any
such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed
by Mr Lee Spencer, who is a Competent Person and a member of the Australasian Institute of Mining and
Metallurgy. Mr Spencer is a Director of TRS Management Pty Ltd, a contractor to the Company. Mr Spencer, B.Sc.
(Hons) M.Sc. M.AusIMM, has sufficient experience which is relevant to the style of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent Persons as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Spencer consents to the inclusion of his name in the matters based on the information in the
form and context in which it appears.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements, and that all material assumptions and technical parameters have
not materially changed. The Company also confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
APPENDIX 6
JORC Code, 2012 Edition – Table 1 (Section 4 & 5 not applicable)
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g., ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may
be required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation
types (e.g., submarine nodules) may warrant
disclosure of detailed information.
Soil Samples
• A total of 49 soil samples were collected samples collected at 50 metre spacing.
Samples were collected by mattock to a nominal depth of 0.5 metre in the B horizon.
Outcrop, coordinates, soil type and colour were logged. Samples were screened at
180 microns and the minus-180-micron fraction submitted for analysis.
Rock Samples
• A total of 5 samples were secured as random samples of available outcrop during soil
sampling, samples were sawn logged and HHXRF used to determine metal content
within various veinlets.
Drilling
techniques
• Drill type (e.g., core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g., core
diameter, triple or standard tube, depth of
• Not Applicable.
11
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
Drill
sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Not Applicable.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the
relevant intersections logged.
Soil Samples
• Sample site coordinates were noted, samples sites were logged for soil type, colour
and basement outcrop. Logging is qualitative and appropriate for early-stage
exploration.
Rock Samples
• Samples were sawn and macroscopically logged for lithology, alteration if any and
mineralisation if any. All samples were photographed.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
Soil samples
• Soil samples were collected using a mattock to a maximum depth of 0.25 metre.
Samples were collected, bagged and assigned a sample number. Coordinates were
recorded ( GDA94 Zone 55) along with soil type, colour, description and notes on any
nearby outcrop. Samples were transported back to Georgetown facility where they
were screened at 180 microns with the -180 micron fraction weighed and transferred
to a soil packet. Screens were cleaned by air compressor between each sample.
Rock samples
• A total of 5 samples were secured as random samples of available outcrop during soil
sampling, samples were sawn logged and handheld XRF used to determine metal
content within various veinlets.
12
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g., standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e., lack of bias) and
precision have been established.
Soil samples will be analysed by ALS Laboratory Townsville/Brisbane using appropriate
analytical techniques for the elements assayed.
• ALS carry out internal checks as per their standard operating procedure. This results
in around 10% of the total samples received being independently assayed as internal
QA/QC.
• Samples were transported to ALS Laboratory in Townsville and will be assayed using
ALS assay method ME-MS61 for a 48 multi-element scan.
Rock Samples were tested for anomalous elements using a handheld XRF. Handheld XRF
readings are preliminary, semi-quantitative screening measurements.
• They may be affected by calibration, surface condition, moisture, matrix effects,
sample geometry and instrument settings. They are not laboratory assays and must
not be used to estimate grade, continuity, tonnage or economic potential.
Verification
of sampling
and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Primary data is recorded in the field and transferred to spreadsheets and uploaded
to the company’s electronic data filing system.
Assays are received from the Laboratory in excel format and appended to field data.
Deviations of assays from observed mineralisation are re-assayed.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• All sample locations are recorded by gps and entered into field notes.
• Grid system is GDA94 Zone 55.
• For rock chip samples elevation data is recorded from the gps.
13
Data
spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• The soil sample spacing is appropriate for historical anomaly confirmation.
• No compositing has been applied.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Sampling soil lines were designed to cross perpendicular to the orientation of the
historical soil anomaly.
• The relationship between sample orientation and all possible mineralised structures
is not fully understood at this early stage.
Sample
security
• The measures taken to ensure sample
security.
• Chief measure to ensure sample security was the adoption of an internal chain of
custody. Samples were delivered from the field and delivered to courier for delivery
to ALS Laboratory.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No internal review or audit of sampling techniques has been carried out.
Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• Sampling was carried out on EPM 27170 Mt Turner 100% owned by Lightning
Minerals Pty Ltd.
• The tenement is in good standing and under Queensland law gives the holder
exclusive right to explore for minerals for a period of 5 years. The tenement can
be extended for a further five years on application.
14
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• Previous exploration includes 1989 GSQ mapping, 1996 KGM Propriety Ltd
mapping and soil sampling, 2024 Ismins Propriety Ltd IP Chargeability. No
Drilling.
Geology • Deposit type, geological setting and style of
mineralisation.
• Mineralisation is interpreted to be hydrothermal stock-work porphyry type in a
back-arc setting.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole
collar.
elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar.
dip and azimuth of the hole.
down hole length and interception
depth.
hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• Not applicable.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g., cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low-grade results, the procedure used for such
aggregation should be stated and some typical
• Not applicable.
15
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g., ‘down hole length, true width not
known’).
• Not applicable.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• Not applicable.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration Results.
• Not Applicable.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• Not Applicable.
Further work • The nature and scale of planned further work
(e.g., tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Depending on assay results further work will be aimed at mapping the surface
expression of porphyry style mineralisation and associated alteration.
16
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)
Criteria JORC Code explanation Commentary
Database
integrity
• Measures taken to ensure that data has not been corrupted by, for
example, transcription or keying errors, between its initial
collection and its use for Mineral Resource estimation purposes.
• Data validation procedures used.
• Sampling was conducted under a quality management
system. All field data captured by hard copy is subsequently
uploaded to a spreadsheet system and added to the stored
database. The database is checked for input errors in the field
and at head office.
Site visits
• Comment on any site visits undertaken by the Competent Person
and the outcome of those visits.
• If no site visits have been undertaken indicate why this is the case.
• Competent person has visited site on several occasions.
Geological
interpretation
• Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.
• Nature of the data used and of any assumptions made.
• The effect, if any, of alternative interpretations on Mineral
Resource estimation.
• The use of geology in guiding and controlling Mineral Resource
estimation.
• The factors affecting continuity both of grade and geology.
• Project is in early exploration stage as such geological
interpretation of any mineral deposits present is premature.
Dimensions
• The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below
surface to the upper and lower limits of the Mineral Resource.
• Current sampling will not estimate the extent of
mineralisation.
17
Estimation
and modelling
techniques
• The nat
Share your feedback
Discover