Drummer Fault Soil Sampling Delivers Phase 2 Drill Targets
Released
Released
Announcement PDF
19 June 2026
ASX ANNOUNCEMENT
A. 32 Harrogate Street, West Leederville Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
DRUMMER FAULT SOIL SAMPLING DELIVERS MULTIPLE
PHASE 2 DRILL TARGETS AT MT TURNER PROJECT
HIGHLIGHTS
• Systematic soil sampling & interpretation across a 10km section of the Drummer Fault
corridor identifies multiple new gold targets at wholly owned Mt Turner
• Soil geochemistry supports continuity of mineralisation between historical oxide pits
and extends prospective zones east and west of known workings
• High-priority 2.2km exploration corridor defined between historical Pits 1 and 5,
coincident with multiple interpreted structural trap sites along the Drummer Fault
• Indications from the program, reinforces the strong potential under shallow cover,
coincident with prospective aeromagnetic splay structures
• Results further validate Lightning Minerals' interpretation of the Drummer Fault as
potentially hosting a district-scale gold system
• We have incorporated these data, to optimise our priority drill targets for the Company's
fully funded Phase 2 exploration drilling program, which is scheduled to commence
mid-July
• Exploration activities are consistent with Lightning's stated gold-focused growth
strategy as announced in April 2026, toward future resource definition at Mt Turner
Lightning Minerals Limited (ASX: L1M or “the Company”) is pleased to announce results
from a soil sampling program completed late 2025 during the higher priority, Phase 1 drilling
along the Drummer Fault at its 100%-owned flagship Mt Turner Gold Project in North
Queensland 1
. Following the Company's strategic review and prioritisation of Mt Turner as its
primary growth asset, the data was incorporated into ongoing exploration targeting and has
generated multiple priority targets for the upcoming Phase 2 drilling program.
The program has successfully identified up to six areas (see Figure 2 and Appendix) with multi-
element anomalies over a combined strike length of approximately 3.9km and has confirmed
the continuity of mineralisation between multiple, shallow, historical oxide mining centres along
the Drummer Fault whilst extending potential mineralised zones laterally east and west. These
results provide further support for the Company's emerging district-scale gold system model
and generate multiple high-priority drill targets ahead of the commencement of Phase 2
drilling.
1
ASX announcement dated 11 December 2025 – Aggressive Growth Strategy for Mt Turner Gold Project;
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 2
ASX: L1M
ABN. 40 656 005 122
The results represent another important milestone in Lightning's strategy to advance Mt Turner
toward resource definition following the Company's April 2026 Strategic Plan, which
established Mt Turner as its flagship asset and primary value driver.
Chief Executive Officer Troy Brice commented:
“The Drummer Fault soil program has delivered a strong outcome and further strengthens our
confidence in the scale potential of the Mt Turner Gold Project.
Importantly, the results support continuity between multiple historical mining centres along the
Drummer Fault and have identified several new target areas beyond the historical pits. The
combination of geochemistry, historical workings and structural interpretation has generated
a pipeline of high-priority targets that will be incorporated into our upcoming Phase 2 drilling
campaign.
Since undertaking our strategic Plan earlier this year, we have been focused on advancing Mt
Turner as the cornerstone asset within Lightning’s portfolio and systematically building our
understanding of what we believe is an emerging district-scale gold system. These results
represent another important step in that process, expanding the known footprint of
mineralisation and providing a clear pathway for further growth through drilling.
With Phase 2 drilling expected to commence shortly, we look forward to testing these targets
and continuing to unlock the broader potential of the 14km Drummer Fault corridor as we
progress Mt Turner along the exploration and development pathway.”
Next Steps
1. Commence Phase 2 drilling at the Drummer Fault corridor;
2. Drill test priority targets generated from the soil program;
3. Complete follow-up geochemical work across unsampled portions of the Drummer
Fault;
4. Evaluate covered targets beneath Aurora Creek sediments;
5. Continue regional target generation across the broader Mt Turner Project; and
6. Progress exploration activities. Including early planning for Phase 3 drilling
7. Focused on potential resource definition.
Building a District-Scale Gold System at Mt Turner
The Mt Turner Project hosts a number of large-scale structures proximal to a Cu porphyry
system. The company’s exploration model predicates that Au bearing fluids will be focused
along these structures; a favourable site for gold disposition. The Drummer Fault target, a
major mineralised structure extending approximately 14 kilometres across the project area
was selected as the primary exploration focus. The Company's maiden drilling program
completed in 2025 successfully confirmed the geological model at Pits 3, 5 and 6, with all drill
holes intersecting breccia hosted precious metal mineralisation below the oxide pits.
The May 2026 Investor Presentation highlighted Mt Turner as the Company's cornerstone
growth asset, outlining a clear pathway from exploration success to resource definition through
systematic drilling and target generation. The Drummer Fault soil program forms a critical
component of that strategy by identifying extensions to known mineralisation and defining
additional targets for drilling.
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 3
ASX: L1M
ABN. 40 656 005 122
Drummer Fault Soil Program Objectives
The late 2025 soil sampling program was designed to:
• Delineate strike extensions of the Drummer Fault between historical oxide pits;
• Identify additional zones displaying anomalous geochemistry;
• Refine drill targeting along the broader Drummer Fault corridor; and
• Test areas with limited outcrop exposure where geological interpretation relied
primarily on geophysics and structural modelling.
A total of 492 soil samples were collected on systematic north-south traverses across the
Drummer Fault. Samples were collected at 20 metre intervals along lines spaced 100 metres
apart and analysed by ALS Laboratories for gold and multi-element geochemistry2
. Generally,
soils are skeletal and reflect chemistry of underlying basement rocks. No sampling was
undertaken on or near waste dumps or within transported alluvium.
Multiple Significant Soil Anomalies Defined
The survey identified five distinct anomalous zones distributed across the eastern, central and
western portions of the Drummer Fault corridor. Refer to Appendix 1, 2 and 3 (including
Figures 2 to 5 inclusive), with coloured coded anomalous element values for each expanded
grid section.
In Appendix 3 (Western grid section) an excerpt of simplified results (from a multi element
assay) is shown.3
Eastern Grid – Open Multi-Element Anomaly
A broad multi-element anomaly extends approximately 600 metres westward from 758300mE
to 758900mE and remains open to the west.
The anomaly displays elevated arsenic, silver and lead responses and is locally associated
with elevated chromium values which may reflect underlying mafic dyking intruding along the
Drummer Fault. The western extent remains untested and represents a priority follow-up
target.
2
View Appendix 1 for ALS Laboratory certificates
3
No reliance can be made on these data across the Mt Turner project. The ALS results will be further
analysed and must be integrated with subsequent Phase 2 drilling, and other exploration activities to
determine a more accurate geological context.
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 4
ASX: L1M
ABN. 40 656 005 122
Figure 1 Location Map –Mt Turner Project, including the Drummer Fault
Central Grid – Mineralisation Linking Historical Pits
The central grid returned some of the most strategically significant results from the program.
Strong multi-element anomalies extend westward from Pit 3 and Pit 5, effectively linking known
mineralised centres through geochemical responses and demonstrating continuity along the
fault corridor.
The soil results indicate anomalism extending approximately 1.6 kilometres between Pit 3 and
areas west of Pit 5, substantially expanding the interpreted footprint of the mineralised system.
Several portions of the corridor remain unsampled and provide immediate opportunities for
extension work.
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 5
ASX: L1M
ABN. 40 656 005 122
Figure 2 - Drummer Fault Soil Anomalies, using DTM to highlight topography
Western Grid – Strongest Gold-Pathfinder Response
The strongest anomaly identified during the program occurs east of Pit 6. A coherent Au-Ag-
As anomaly extends approximately 1.2 kilometres before terminating beneath floodplain
sediments associated with Aurora Creek. Geological observations indicate quartz veining
continues beneath the covered area, suggesting mineralisation may extend further east under
shallow transported cover.
A second 800-metre-long anomaly was identified further west and is associated with
gossanous quartz fragments, arsenic enrichment and sporadic gold responses, highlighting
additional exploration potential beyond currently defined targets.
Strong Alignment with Gold-Focused Strategy
The Drummer Fault soil program directly supports the Company's April 2026 strategic Plan,
which prioritised gold as Lightning's primary commodity focus and established Mt Turner as
the Company's flagship asset.
The Company's strategy is centred on disciplined capital allocation toward projects capable of
generating meaningful resource growth and shareholder value. The scale and continuity
demonstrated by the Drummer Fault soil anomalies provide further evidence that the Mt Turner
Project contains key characteristics of a potentially district-scale gold system.
The soil sampling program has generated multiple high-priority targets that will be incorporated
into the Company's upcoming Phase 2 drilling campaign and additional exploration activities
including early Phase 3 drill planning.
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 6
ASX: L1M
ABN. 40 656 005 122
The program will focus on:
• Expanding mineralisation around the historical Drummer Fault pits;
• Testing newly identified geochemical anomalies;
• Evaluating strike extensions beyond current drilling coverage;
• Testing covered targets east of Pit 6;
• Assessing structural dilation zones identified through geochemistry and geophysics;
and
• Extending mineralisation at depth and along strike toward future resource definition.
The Company believes the combination of drilling success, geological continuity and extensive
soil anomalism significantly increases confidence in the scale potential of the Drummer Fault
system.
References to Previous Announcements
The information in this announcement should be read in conjunction with ASX Announcement,
including:
• 17 November 2025 – Final Assays Confirm Extension of Gold System at Mt Turner
• 11 December 2025 – Aggressive Growth Strategy for Mt Turner Gold Project;
• 16 April 2026 - Strategic Plan and Portfolio Simplification to Gold and Copper focus
with Mt Turner flagship
~ Ends ~
This announcement has been authorised for release by the Board of Lightning Minerals
Limited.
For more information, please visit: lightningminerals.com.au
Enquiries in relation to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Corporate Storytime
Troy Brice Paul Berson
Chief Executive Officer Investor & Media Relations
Phone +61 8 9429 8806 Phone +61 421 647 445
admin@lightningminerals.com.au paul@corporatestorytime.com
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 7
ASX: L1M
ABN. 40 656 005 122
About Lightning Minerals Ltd (ASX: L1M)
Lightning Minerals Limited is an Australian exploration and development company focused on
advancing a portfolio of gold and copper assets in Tier 1 mining jurisdictions.
The Company’s flagship asset is the wholly owned Mt Turner Gold Project in northern
Queensland, which hosts a large-scale gold system extending over approximately 14km of
strike along the prospective Drummer Fault. Mt Turner is the primary focus of exploration, with
ongoing drilling aimed at progressing the project toward resource definition and development.
Lightning Minerals also holds a pipeline of gold and copper projects across Australia, including
assets in the Lachlan Fold Belt in New South Wales and the Eastern Goldfields of Western
Australia, providing additional exploration upside and growth opportunities.
The Company’s objective is to create long-term shareholder value through disciplined
exploration, resource growth and the development of high-quality mineral assets.
Location of Lightning Minerals Australian Gold and Copper Projects
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 8
ASX: L1M
ABN. 40 656 005 122
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking
statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”,
“plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without
limitation, statements regarding plans, strategies and objectives of management, anticipated production or
construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may
cause the Company’s actual results, performance and achievements to differ materially from any future results,
performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices,
foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs,
the speculative nature of exploration and project development, including the risks of obtaining necessary licences
and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory
framework within which the Company operates or may in the future operate, environmental conditions including
extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to
the financial, market, regulatory and other relevant environments that will exist and affect the Company’s business
and operations in the future. The Company does not give any assurance that the assumptions on which forward
looking statements are based will prove to be correct, or that the Company’s business or operations will not be
affected in any material manner by these or other factors not foreseen or foreseeable by the Company or
management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or
results to differ materially from those disclosed in forward looking statements, there may be other factors that could
cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and
many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place
undue reliance on forward looking statements. Forward looking statements in these materials speak only at the
date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing
rules, in providing this information the Company does not undertake any obligation to publicly update or revise any
of the forward-looking statements or to advise of any change in events, conditions or circumstances on which any
such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed
by Mr Lee Spencer, who is a Competent Person and a member of the Australasian Institute of Mining and
Metallurgy. Mr Spencer is a contractor to the Company. Mr Spencer has sufficient experience which is relevant to
the style of mineralisation and types of deposits under consideration and to the activity which he is undertaking to
qualify as a Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Spencer consents to the inclusion of his name in
the matters based on the information in the form and context in which it appears. Mr Spencer holds options in
Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements, and that all material assumptions and technical parameters have
not materially changed. The Company also confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
A. 32 Harrogate Street, West Leederville Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 9
ASX: L1M
ABN. 40 656 005 122
APPENDIX
APPENDIX 1 - ALS CERTIFICATE NUMBERS
Certificate ID Soils # Date
TV25304364 60 2 Oct 25
TV25304387 249 2 Oct 25
TV25304389 183 2 Oct 25
492
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 10
ASX: L1M
ABN. 40 656 005 122
APPENDIX 2 – Drummer Fault, expanded Sections, from west to east with colour coded element values.
Figure 3 – EPM 27525 Drummer Fault, expanded Western grid section, with coloured coded anomalous element values
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 11
ASX: L1M
ABN. 40 656 005 122
Figure 4 – Drummer Fault, expanded central grid section, with coloured coded anomalous element values
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 12
ASX: L1M
ABN. 40 656 005 122
Figure 5 – EPM 27170 Drummer Fault, expanded Eastern grid section, with coloured coded anomalous element values
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 13
ASX: L1M
ABN. 40 656 005 122
APPENDIX 3 – Drummer Fault, Western grid section - an excerpt of anomalous results*
*No reliance can be made on these data across the Mt Turner project. The ALS results will be further analysed and must be integrated with
subsequent Phase 2 drilling, and other exploration activities to determine a more accurate geological context.
Sample no Easting Northing Au ppb Ag ppb As ppm Pb ppm Zn ppm
105584 751200 7982890 38 90 65 24 25
105585 751200 7982870 52 120 63 30 31
105586 751200 7982850 39 270 45 20 15
105587 751200 7982830 44 310 43 22 12
105588 751200 7982810 189 280 151 36 28
105589 751200 7982790 57 220 67 22 9
105590 751200 7982770 51 180 102 22 18
105591 751200 7982750 28 150 64 19 16
105592 751300 7982880 64 160 60 25 27
105593 751300 7982860 79 190 111 32 19
105595 751300 7982815 345 1290 487 41 100
105596 751300 7982800 152 250 133 37 36
105597 751300 7982780 131 340 101 35 15
105598 751300 7982760 105 290 71 28 14
105599 751400 7982890 61 160 166 21 7
105600 751400 7982870 84 230 274 33 14
105601 751400 7982850 167 1240 254 21 49
105602 751400 7982830 185 290 213 25 16
105603 751400 7982810 118 240 148 22 12
105604 751400 7982790 67 160 106 21 10
105605 751400 7982770 47 940 29 26 5
105606 751400 7982750 40 120 49 17 6
105607 751500 7982880 78 250 168 33 17
105608 751500 7982860 101 540 226 28 20
105609 751500 7982840 125 1240 442 13 37
105610 751500 7982820 93 280 117 30 40
105611 751500 7982800 48 520 81 29 16
105612 751500 7982780 51 150 54 18 7
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 14
ASX: L1M
ABN. 40 656 005 122
105613 751500 7982760 18 90 63 20 5
105614 751600 7982890 16 840 131 23 13
105615 751600 7982870 12 420 78 13 4
105616 751600 7982850 21 2320 99 18 22
105617 751600 7982830 68 1900 231 13 39
105618 751600 7982810 11 150 43 19 17
105619 751600 7982790 17 310 39 24 6
105620 751600 7982770 33 180 41 22 6
105621 751600 7982750 17 630 53 30 10
105622 751700 7982880 7 220 182 32 30
105623 751700 7982860 5 130 121 13 9
105624 751700 7982840 6 100 107 12 3
105625 751700 7982820 140 2160 1225 13 56
105626 751700 7982800 85 1180 473 29 34
105627 751700 7982780 33 330 134 32 21
105628 751700 7982760 28 680 145 32 6
105629 751800 7982890 21 250 185 34 9
105630 751800 7982870 21 440 196 30 21
105631 751800 7982850 13 460 98 23 11
105632 751800 7982830 58 1080 211 15 33
105633 751800 7982810 50 620 136 16 8
105634 751800 7982790 20 460 127 19 5
105635 751800 7982770 35 900 110 18 7
105636 751800 7982750 21 170 60 19 5
105637 751900 7982880 66 210 187 31 14
105638 751900 7982860 153 270 402 30 18
105639 751900 7982840 151 1420 508 12 29
105640 751900 7982820 59 780 215 18 15
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 15
ASX: L1M
ABN. 40 656 005 122
APPENDIX - JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• The samples are collected from below the natural surface at a depth
of approximately 20cm.
• Soil samples are sieved on site and the -180 micron fraction is
retained for geochemical analysis.
• Soil sample weights are approximately 200 grams. All sieved material
is collected in kraft packets (~200 grams).
• The soil sampling analysis technique utilised considered acceptable
and standard industry practice.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Not Applicable
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Not Applicable
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 16
ASX: L1M
ABN. 40 656 005 122
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Soil sample sites are described, with soil types and basement
lithology where present is logged
• Soil sample descriptions are considered qualitative in nature.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Sample preparation for soil geochemistry program follows best
practice.
• Soil sample sizes of approximately 200gm are considered appropriate
for the analytical technique used.
• Soil samples were collected on a 20mx100m grid pattern, Minor
variations to sample site locations will occur due to field complexities.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• The analysis of soil samples ALS Townsville using method AU ME-
TL43 & 44 is adequate at this early stage of exploration.
• ALS internal QAQC process which is relevant to the stage of
exploration activities.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
• No drilling results are being reported.
• No twinned holes or drilling results are reported.
• No rock chip sample results are being reported.
A. 32 Harrogate Street, West Leederville, Perth WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 17
ASX: L1M
ABN. 40 656 005 122
Criteria JORC Code explanation Commentary
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Primary soil sample locations are collected electronically via a
handheld GPS – Garmin GPSMap 62s.
• No adjustments have been applied to laboratory assay results.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Handheld Garmin GPS instruments were used to locate the sample
sites, these instruments are understood to be accurate within a
nominal ±5m in the horizontal and vertical planes.
• This spatial location accuracy is considered adequate for early grid
soil sampling programs.
• All samples were collected in the Geocentric Datum of Australia 1994
(GDA94) system. (MGA94, Zone 54)
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Soil samples were taken on a 20m x 100m grid. These samples
spacings may require minor and infrequent variation dependent on
field conditions.
• The reporting of field observations is not indicative of mineralisation.
Further exploration work including an assessment of the current soil
sampling results and follow up drilling and sampling are required to
confirm the presence of any mineralisation.
• There is no known sample representivity to mineralisation at this early
stage of exploration sampling.
• No compositing has been undertaken on the soil samples.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mi
Share your feedback