Additional Information - Warby Project Tungsten Announcement
Released
Released
Announcement PDF
A. 32 Harrogate St, West Leederville, WA 6007.
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
ASX ANNOUNCEMENT
22 May 2026
1
SUPPLEMENTARY INFORMATION – WARBY PROJECT
TUNGSTEN ANNOUNCEMENT
Lightning Minerals Limited (ASX: L1M or “the Company”) refers to its ASX
announcement dated 19 May 2026 titled “Significant Tungsten Potential Identified at
the Warby Project in North Queensland, Supports Tenure Prospectivity” (“Original
Announcement”).
The Company provides the following additional information regarding the visual
observations of tungsten mineralisation referred to in the Original Announcement and
includes a JORC Code Table 1 in respect of the 14 rock chip samples submitted for assay.
Visual Observations of Tungsten Mineralisation
The Company confirms that visible tungsten mineralisation observed during
reconnaissance field activities at the Warby Project comprises wolframite mineralisation
occurring as coarse acicular sprays, blades and clustered aggregates within quartz veining,
greisen and altered granite.
The Company advises that no reliable estimate of tungsten mineral abundance as a
percentage (%) can be determined from visual observations alone.
Wolframite mineralisation is characteristically coarse grained, irregularly distributed and
subject to a pronounced nugget effect. In addition, wolframite occurs within a solid solution
series between ferberite (iron-rich) and hübnerite (manganese-rich) end members,
resulting in variable tungsten content that cannot be accurately quantified visually.
Analytical laboratory assay is considered the only appropriate method for determining
tungsten concentration within the sampled material.
The Company further confirms that the following cautionary statement included in the
Original Announcement remains applicable:
“Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.”
A. 32 Harrogate St, West Leederville, WA 6007.
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
2
Rock Chip Sampling Program
As previously disclosed, a total of 14 rock chip samples were collected from historical dump
material associated with nine individual vein positions during field activities completed in
May 2026.
Samples were collected to confirm the presence or absence of tungsten mineralisation
within historical workings identified during reconnaissance mapping.
All samples as shown below, have been submitted to ALS Laboratories in Townsville for
assay analysis. Assay results remain pending.
The below estimates of mineral abundance are provided as estimations from visual
observations only and should not be relied upon.
Table of samples with indicative, visual estimates.
No reliable estimate of tungsten mineral abundance as a percentage (%) can be
determined from visual observations alone.
Sample No Coordinates
Tungsten Visual
estimates
# mE mN % Estimated W
105491 189992 8028264 <0.1
105492 189992 8028264 <0.1
105493 189283 8028316 0.5 to 1
105494 189283 8028316 <0.1
105495 189283 8028316 1 to 2
105496 189215 8028196 1 to 2
105497 189215 8028196 1 to 2
105498 189215 8028196 0.5 to 1
105499 189314 8027987 1 to 3
105500 189573 8027843 0.5 to 1.5
105877 189513 8027795 1 to 3
105878 189513 8027795 2 to 4
105879 189721 8027804 0.1 to 0.5
105880 189790 8027645 <0.1
A. 32 Harrogate St, West Leederville, WA 6007.
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
3
In accordance with ASX Listing Rules and the JORC Code (2012 Edition), the JORC Code
Table 1 relating to the sampling activities referred to in the Original Announcement is
included as Appendix 1 to this announcement.
~ Ends ~
This announcement has been authorised for release by the Board of Lightning Minerals
Limited.
For more information, please visit: lightningminerals.com.au
Enquiries in relation to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Corporate Storytime
Troy Brice Paul Berson
Chief Executive Officer Investor & Media Relations
Phone +61 8 9429 8806 Phone +61 421 647 445
admin@lightningminerals.com.au paul@corporatestorytime.com
About Lightning Minerals Ltd (ASX: L1M)
Lightning Minerals Limited is an Australian exploration and development company focused
on advancing a portfolio of gold and copper assets in Tier 1 mining jurisdictions.
The Company’s flagship asset is the wholly owned Mt Turner Gold Project in northern
Queensland, which hosts a large-scale gold system extending over approximately 14km of
strike along the prospective Drummer Fault. Mt Turner is the primary focus of exploration,
with ongoing drilling aimed at progressing the project toward resource definition and
development.
Lightning Minerals also holds a pipeline of gold and copper projects across Australia,
including assets in the Lachlan Fold Belt in New South Wales and the Eastern Goldfields of
Western Australia, providing additional exploration upside and growth opportunities.
The Company’s objective is to create long-term shareholder value through disciplined
exploration, resource growth and the development of high-quality mineral assets.
A. 32 Harrogate St, West Leederville, WA 6007.
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
4
Figure 3: Location of Lightning Minerals Australian Gold and Copper Projects
A. 32 Harrogate St, West Leederville, WA 6007.
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
5
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward
looking statements can generally be identified by the use of forward-looking words such as “may”, “will”,
“expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may
include, without limitation, statements regarding plans, strategies and objectives of management, anticipated
production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that
may cause the Company’s actual results, performance and achievements to differ materially from any future
results, performance or achievements. Relevant factors may include, but are not limited to, changes in
commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development, including the
risks of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and
social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of
personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating
to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on which
forward looking statements are based will prove to be correct, or that the Company’s business or operations will
not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company
or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events
or results to differ materially from those disclosed in forward looking statements, there may be other factors that
could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended,
and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not
to place undue reliance on forward looking statements. Forward looking statements in these materials speak
only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock
exchange listing rules, in providing this information the Company does not undertake any obligation to publicly
update or revise any of the forward-looking statements or to advise of any change in events, conditions or
circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or
reviewed by Mr Lee Spencer, who is a Competent Person and a member of the Australasian Institute of Mining
and Metallurgy. Mr Spencer is a contractor to the Company. Mr Spencer has sufficient experience which is
relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Spencer consents to the inclusion of
his name in the matters based on the information in the form and context in which it appears. Mr Spencer holds
options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements, and that all material assumptions and technical parameters
have not materially changed. The Company also confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
1
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Samples were secured as random chip samples of vein and wall rock
material from historical waste dumps as a key geochemical tool in
the early exploration phase.
• Approximately 2 kilograms of material were obtained per sample
and sent for preparation and assay via an industry standard
procedure
• Samples were secured to determine the presence or absence of
tungsten mineralization within dump material.
• Sampling followed a well - documented protocol and quality was
considered to be of good industry standard.
• Rock chip samples will not be included in a dataset for any future
resource estimation
•
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Not Applicable
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Not Applicable
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Random chip samples were qualitatively logged as to the presence
or absence of mineralization, lithology and any alteration of the host
rock. Samples were photographed during logging for reference.
2
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
All samples were taken dry
All comminution and splitting was conducted at the assay laboratory
using Jaw crushers, mills and Jones-type riffle splitters.
Sampling procedures included sampling a number of quartz vein rocks
per sample from the dump material to represent as much as possible the
rock type being sampled. No excavations were made into the dump so
samples represent what was exposed at surface.
Sample size is industry standard for the type of rock and mineralisation
being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Samples were submitted to ALS Laboratory in Townsville using
certified methods and instruments. Methods used for assay data
include AA-26,ME-MS -61 and ME -MS-81h.
• ALS carry out internal check as per their standard operating
procedure. This results in around 10% of the total samples received
being independently assayed as internal QA/QC.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Primary data is recorded in the field and transferred to spreadsheets
and uploaded to the company’s electronic data filing system.
• Assays are received from the Laboratory in excel format and
appended to field data. Deviations of assays from observed
mineralization are re-assayed.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• All sample locations are recorded by gps and entered into field notes
• Grid system is UTM WGS 84 Zone 55
• For rock chip samples elevation data is recorded from the gps
3
Criteria JORC Code explanation Commentary
• Quality and adequacy of topographic control.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Data spacing was dependant on the location of historical workings
• The current spacing of sampling would not be sufficient to establish
any degree of continuity. Further grid based sampling or drilling would
be required to fulfill grade and geological continuity.
• No compositing has been applied
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Sampling of dump material is inherently biased as the location of
original in-situ material is unknown.
Sample
security
• The measures taken to ensure sample security. • Chief measure to ensure sample security was the adoption of an
internal chain of custody. Samples were delivered from the field and
delivered to courier for delivery to ALS Laboratory
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No internal review or audit of sampling techniques has been carried
out
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Sampling was carried out on EPM 28262 Warby 100% owned by
Lightning Minerals Pty Ltd.
• The tenement is in good standing and under Queensland law gives
the holder exclusive right to explore for minerals for a period of 5
years. The tenement can be extended for a further five yeqars on
application
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • No recorded previous exploration on tungsten exploration
Geology • Deposit type, geological setting and style of mineralisation. • Mineralisation appears to be hydrothermal W vein type
4
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• Not applicable
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• Not applicable
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Not applicable
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Not applicable
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Not Applicable
Other
substantive
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
• Not Applicable
5
Criteria JORC Code explanation Commentary
exploration
data
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
Further work • The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Depending on assay results further work will be aimed at discovery of
further evidence of W mineralization by a combination of drainage
sampling and soil sampling
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)
Criteria JORC Code explanation Commentary
Database
integrity
• Measures taken to ensure that data has not been corrupted by, for
example, transcription or keying errors, between its initial collection
and its use for Mineral Resource estimation purposes.
• Data validation procedures used.
• Sampling was conducted under a quality management system. All
field data captured by hard copy is subsequently uploaded to a
spreadsheet system and added to the stored database. The database
is checked for input errors in the field and at head office.
Site visits • Comment on any site visits undertaken by the Competent Person and
the outcome of those visits.
• If no site visits have been undertaken indicate why this is the case.
• Competent person collected the samples
Geological
interpretation
• Confidence in (or conversely, the uncertainty of ) the geological
interpretation of the mineral deposit.
• Nature of the data used and of any assumptions made.
• The effect, if any, of alternative interpretations on Mineral Resource
estimation.
• The use of geology in guiding and controlling Mineral Resource
estimation.
• The factors affecting continuity both of grade and geology.
• Initial sampling is to determine the presence or absence of W
mineralization. The exploration stage is too early to determine the
geological nature of the mineralization observed on dump material.
Dimensions • The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below
surface to the upper and lower limits of the Mineral Resource.
• Current sampling will not estimate the extent of mineralisation
Estimation
and modelling
techniques
• The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme grade
values, domaining, interpolation parameters and maximum distance
of extrapolation from data points. If a computer assisted estimation
method was chosen include a description of computer software and
• Not Applicable
6
Criteria JORC Code explanation Commentary
parameters used.
• The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.
• The assumptions made regarding recovery of by-products.
• Estimation of deleterious elements or other non-grade variables of
economic significance (eg sulphur for acid mine drainage
characterisation).
• In the case of block model interpolation, the block size in relation to
the average sample spacing and the search employed.
• Any assumptions behind modelling of selective mining units.
• Any assumptions about correlation between variables.
• Description of how the geological interpretation was used to control
the resource estimates.
• Discussion of basis for using or not using grade cutting or capping.
• The process of validation, the checking process used, the comparison
of model data to drill hole data, and use of reconciliation data if
available.
Moisture • Whether the tonnages are estimated on a dry basis or with natural
moisture, and the method of determination of the moisture content.
• Not Applicable
Cut-off
parameters
• The basis of the adopted cut-off grade(s) or quality parameters
applied.
• Not Applicable
Mining factors
or
assumptions
• Assumptions made regarding possible mining methods, minimum
mining dimensions and internal (or, if applicable, external) mining
dilution. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider
potential mining methods, but the assumptions made regarding
mining methods and parameters when estimating Mineral Resources
may not always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining assumptions
made.
• Not Applicable
Metallurgical
factors or
assumptions
• The basis for assumptions or predictions regarding metallurgical
amenability. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider potential metallurgical methods, but the assumptions
regarding metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with an explanation of
• Not Applicable
7
Criteria JORC Code explanation Commentary
the basis of the metallurgical assumptions made.
Environmen-
tal factors or
assumptions
• Assumptions made regarding possible waste and process residue
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of
potential environmental impacts, particularly for a greenfields project,
may not always be well advanced, the status of early consideration of
these potential environmental impacts should be reported. Where
these aspects have not been considered this should be reported with
an explanation of the environmental assumptions made.
• Not Applicable
Bulk density • Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or dry, the
frequency of the measurements, the nature, size and
representativeness of the samples.
• The bulk density for bulk material must have been measured by
methods that adequately account for void spaces (vugs, porosity,
etc), moisture and differences between rock and alteration zones
within the deposit.
• Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.
• Not Applicable
Classification • The basis for the classification of the Mineral Resources into varying
confidence categories.
• Whether appropriate account has been taken of all relevant factors (ie
relative confidence in tonnage/grade estimations, reliability of input
data, confidence in continuity of geology and metal values, quality,
quantity and distribution of the data).
• Whether the result appropriately reflects the Competent Person’s
view of the deposit.
• Not Applicable
Audits or
reviews
• The results of any audits or reviews of Mineral Resource estimates. • Not Applicable
Discussion of
relative
accuracy/
confidence
• Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an approach
or procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative
discussion of the factors that could affect the relative accuracy and
• Not Applicable
8
Criteria JORC Code explanation Commentary
confidence of the estimate.
• The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be
relevant to technical and economic evaluation. Documentation should
include assumptions made and the procedures used.
• These statements of relative accuracy and confidence of the estimate
should be compared with production data, where available.
Section 4 Estimation and Reporting of
Share your feedback
Discover