QUARTERLY ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 JUNE 2023
Lightning Minerals (“L1M” or “the Company”) is pleased to report its Quarterly Activities Report for the
quarter ending 30 June 2023.
HIGHLIGHTS
o
Drilling at Dundas project started and is continuing
subsequent to end of quarter, targeting outcropping
pegmatites and lithium-rubidium in soil anomalism on
tenement E63/2001
o
Multiple pegmatites intersected by the drilling subsequent
to end of quarter (ASX announcement 13 July 2023)
o
Further lithium in soil anomalism identified at Dundas
North Project, with largest anomaly being 35km2 and
up to 147ppm lithium
o
Phase 1 soil sampling across Dundas North and
Dundas South now complete, with multiple targets
identified across multiple tenements
Listed Options
26,728,543 (exercisable at A$0.25)
o
Follow up infill sampling planned across multiple
lithium in soil anomalies
Cash Position
A$4.69 Million
(at 30 June 23)
o
Heritage Agreement has been signed with The Ngadju
Native Aboriginal Title Corporation (NNTAC)
o
Company has attended multiple conferences during
the quarter including the Battery Metals Conference in
Sydney and the 121 Conference in Melbourne
ASX: L1M
Shares on Issue
48,457,170
Performance Rights
4,800,000
Unlisted Options
10,200,000 (exercisable at A$0.25)
80,000 (exercisable at A$0.30)
110,000 (exercisable at A$0.40)
140,000 (exercisable at A$0.50)
Lightning Minerals Chief Executive Officer Alex Biggs said, “The Company has successfully begun
drilling at its flagship Dundas Project in Western Australia. Following a very busy and successful first
quarter of the year, the Company has continued to identify significant lithium in soil anomalies across
its Dundas Project tenements creating a pipeline of targets for follow-up drilling and further exploration.
Subsequent to the end of quarter the Company has had success with multiple pegmatites intersected
on tenement E63/2001, with drilling ongoing subsequent to end of quarter. I congratulate our team on
a job well done and the speed at which works have been completed in both a safe and diligent manner.
I look forward to continued success, as the Company accelerates its exploration campaigns across its
projects”.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
OPERATIONAL ACTIVITIES
DUNDAS PROJECT OVERVIEW
Drilling at the Company’s Dundas project began during the quarter and was ongoing subsequent to
the quarter end. The Company’s inaugural drill program has focused on tenement E63/2001 with up to
2,500m of reverse circulation (RC) drilling and 10,000m of Aircore (AC) drilling.
The drill program has been designed to target outcropping pegmatites in the north of the tenement
and test a 4km2 lithium and rubidium in soil anomaly in the south-east of the tenement up to 112ppm
lithium, with multiple samples exceeding the background of 60ppm (ASX announcement 23 January
2023).
Drilling in the south-east of the tenement will target potential extensions of pegmatites identified by
Larvotto Resources (ASX: LRV) directly to the south of the Company’s tenure (Larvotto Resources ASX
announcement 03 April 2023). Subsequent to the end of quarter multiple pegmatites have been
intersected on tenement E63/2001 (ASX announcement 14 July 2023). This demonstrates the northwest to south east pegmatite trend from Liontown’s (ASX: LTR) Buldania project in the north to
Larvotto’s Merivale prospect in the south.
Figure 1: Lithium UFF+ soil anomalism >60ppm contours on Interpreted 1:100,000 GSWA interpreted
geology
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 2: Planned Phase 1 drilling areas within tenement E63/2001
Figure 3: Reverse Circulation collar locations for drilling of outcropping pegmatites on tenement E63/2001
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 4: Planned Aircore drilling on tenement E63/2001
The soil sampling program at Dundas was completed during the period with identification of further
lithium in soil anomalism at the Company’s Dundas North tenements (ASX announcement 01 May
2023).
Geochemistry identified lithium in soil anomalies up to 147ppm lithium within three target areas with
the largest area being approximately 35km2. Further infill soil sampling is planned to identify drill
targets across the tenements. These results mark the completion of all soil sampling and Phase 1
exploration at Dundas. The next stage of works is infill sampling on tenement E63/2000.
A summary of operational announcements during the quarter is presented below.
DRILLING STARTS AT DUNDAS TARGETING LI PEGMATITE POTENTIAL
(ASX ANNOUNCEMENT 08 JUNE 2023)
and
MOBILISATION TO DUNDAS PROJECT FOR 12,500M DRILL PROGRAM
(ASX ANNOUNCEMENT 02 JUNE 2023)
o
2,500m Reverse Circulation and 10,000m of Aircore drilling planned to target outcropping
pegmatites and lithium in soil anomaly on tenement E63/2001
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
o
Underexplored targets in one on Western Australia’s fastest emerging lithium provinces
o
Drill program represents a catalyst for the Company as drilling can now follow up strong
targets across the Dundas region
DRILLING STRATEGY FOR E63/2001
Drill program design has been completed for the Dundas South tenement E63/2001, with up to 2,500m
Reverse Circulation (RC) and ~10,000m of Aircore (AC) now confirmed. Drill areas are shown in Figures
2,3 and 4.
Drilling will follow up a combination of recent priority targets identified through the mapping of
outcropping pegmatites, geophysical reinterpretations, and lithium-rubidium in soil anomalism
identified in the south-eastern corner of tenement E63/2001.
It is anticipated that RC component will be undertaken first to test the continuation of the three
outcropping pegmatites at depth. If the outcrop is proven to continue the program intends to collect
samples from depths between fifty and one hundred metres vertically from surface. This will provide a
more representative sample from beneath the interpreted base of complete oxidation (BOCO). The
continuation or orientation of the pegmatites is not yet known and as such there are no guarantees of
success in the maiden drill campaign.
After the completion of the initial RC drilling the AC program will then commence in the south-eastern
corner of tenement E63/2001. The AC program will target the lithium and rubidium anomalism
previously reported1 and the potential extensions of pegmatites present in the south of the tenement.
Composite samples will be taken through areas of saprolitic cover to help vector toward any pegmatites
that are not intersected within the maiden AC program. If pegmatites are intersected in the AC
program, a follow up RC program will be considered as a priority to accelerate exploration progress
within E63/2001. Adjustments to final collar locations are expected as the drill program develops and
evolves in the field.
Figure 5: Gyro Australia on site at the Company’s Dundas Project
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
FURTHER LITHIUM ANOMALISM IDENTIFIED AT DUNDAS PROJECT
(ASX ANNOUNCEMENT 01 MAY 2023)
o
Dundas North soil geochemistry identifies further lithium soil anomalism up to
147ppm lithium
o
Three broadly coincident lithium-caesium-rubidium target areas identified for follow
up exploration works
o
Results mark the completion of Phase 1 exploration at Dundas. Next stage of works is
drilling at Dundas South prospect E63/2001 and infill auger drilling at E63/2000
DUNDAS NORTH LITHIUM SOIL RESULTS
Geochemical results for the final 1,308 samples have been received for samples taken within the
Dundas North project (E28/3027 and E28/3028). The results highlight three target areas that display
elevated lithium in soil values up to 147ppm, with some correlative rubidium, caesium, and tantalum
elevations. The areas are highlighted by light blue ellipses in Figure 6. The underlying geology consists
of the interpreted sediments of the Mt Belches super sequence, the same geological unit that hosts
the Bald Hill lithium-tantalum mine ~30km to the West.
These results complete the laboratory analytical work for the Company’s inaugural geochemical
program across the greater Dundas project area.
Samples were collected on a nominal 400m x 400m grid across the tenements, with analysis
completed by LabWest Minerals Analysis (LabWest). Analysis utilised the Ultrafine + (UFF+) method
with chemical analysis for a suite of 62 elements including lithium and associated pathfinders for
lithium-caesium-tantalum (LCT) mineralisation. Project scale sample site locations and returned
lithium values for the Dundas North tenements are shown in Figure 6.
The tenor of background lithium level within the project area and the Mt Belches lithological unit
appear to be approximately 40-60ppm lithium, with the elevated zones returning multiple samples
with values above 80ppm lithium and up to a peak result of 147ppm lithium. Results are thought to
provide sound vectors toward potential mineralisation as the elevations are clustered and are proximal
to suitable granitic protoliths within the ‘goldilocks zone’ for LCT pegmatite mineralisation. The
‘goldilocks zone’ is typically estimated to be between 2km and 10km from the source granitic body. This
geological setting therefore requires follow up exploration works to ascertain the source of the
anomalies.
Coincident elevations of rubidium (>170ppm) and caesium (>8ppm) are present near the elevated
lithium zones (Figure 7 and 8). Furthermore, isolated low tenor (>0.02ppm) tantalum results are present
near the elevated lithium values (Figure 7). The tantalum results are considered noteworthy as the UFF+
analytical technique may subdue response of high field strength elements. These elements are
generally immobile and may not be readily adsorbed onto the <2-micron soil particles, such as clays
and iron oxides that constitute the sample media. For this reason, the low tenor tantalum results may
provide a valuable targeting tool as tantalum has proven synonymous with fractionated LCT
pegmatites within other deposits. Further exploration is required to delineate the anomalous areas with
the aim to development of high-quality drill targets.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Planning of follow up exploration is underway including infill soil and auger sampling programs at a
tighter grid spacing. This may add further confidence and warrant an initial drill program targeting the
identified areas.
Figures 6, 7, 8 and 9: Dundas North tenure showing returned UFF+ lithium, rubidium, caesium and
tantalum soil geochemistry results
DUNDAS SOUTH ROCK CHIP RESULTS
The analytes for five rock chip samples (DSRK0026-DSRK0030) have also been returned from
outcropping pegmatites within E63/2001 (Figure 5). The samples show positive geochemical indicators
of fractionation with elevated tantalum, tin and niobium in Sample DSRK0027, elevated beryllium in
Sample DSRK0029, and elevated rubidium and caesium in Sample DSRK0026 (Table 1). The lithium
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
tenor recorded in these samples is again subdued, similar values were returned for prior samples as the
outcropping lithologies are intensely weathered. These results further highlight the necessity for drill
testing pegmatites at depth, beneath the oxidised zone. These results provide further confidence for
the upcoming drill program on tenement E63/2001.
Figure 10: Rock chip sample sites for samples DSRK0026 to DSRK0030 within tenement E63/2001
Table 1: Dundas South pegmatite rock chip results E63/2001
Sample ID
Northing
Easting
DSRK0026
6448041
417723
DSRK0027
6448014
417733
DSRK0028
6447985
417736
DSRK0029
6448000
417756
DSRK0030
6448003
417754
Description
Highly
weathered
pegmatite
Highly
weathered
pegmatite
Highly
weathered
pegmatite
Highly
weathered
pegmatite
Highly
weathered
pegmatite
K/Rb
(Ratio)
Be
ppm
Cs
ppm
K
ppm
Li
ppm
Nb
ppm
Rb
ppm
Sn
ppm
Ta
ppm
27.84
2
33
83000
10
5
2981
20
7
50.34
7
6
22000
<10
135
437
43
43
101.97
8
3
31000
<10
80
304
28
31
94.89
26
3
39000
10
35
411
15
11
41.13
6
13
54000
10
30
1313
14
17
The final six rock chip samples collected targeting granite lithologies present in the project area have
also been returned. These samples are intended to be utilised to collate a regional dataset concerning
the geochemistry of the possible parental granite suites within the project area. A geochemical review
of all results can now be undertaken as all samples have been returned.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
MT JEWELL PROJECT (100% L1M)
Work program design has been ongoing during the quarter to determine on site activities during the
second half of 2023. Data review and interpretation of existing drilling data has been completed during
the period and is ongoing subsequent to end of quarter. POW applications have been approved by The
Department of Mines, Industry Regulation and Safety (DMIRS). Heritage agreements are in the final
stages of sign off and are expected to be finalised subsequent to end of quarter.
MAILMAN HILL PROJECT (100% L1M)
Work program design has been ongoing during the quarter to determine on site activities during the
second half of 2023. Data review and interpretation of existing drilling data has been completed during
the period and is ongoing subsequent to end of quarter. POW applications have been approved by The
Department of Mines, Industry Regulation and Safety (DMIRS). Heritage agreements are in the final
stages of sign off and are expected to be finalised subsequent to end of quarter.
MT BARTLE PROJECT (100% L1M)
Application for the Mt Bartle tenements is still pending. Data review and analysis is ongoing and
continues subsequent to the end of quarter. Discussions regarding execution of heritage agreements
are ongoing.
CURRENT WORK PROGRAMS
Drilling on the Company’s Dundas E63/2001 tenement is ongoing subsequent to the end of quarter
with intersections of several pegmatites (ASX announcement 13 July 2023). Preparations are underway
for infill soil sampling on Dundas tenements E63/2000, E28/3027 and E28/3028. Further geochemical
reviews, on ground evaluation and thesis development are key to unlocking the potential that Dundas
represents. The Company also continues to plan for work programs at its Mt Jewell and Mailman Hill
projects.
PERMITTING, HERITAGE AGREEMENTS AND POW APPLICATIONS
A summary of POW applications and status is shown in Table 2 as at 30 June 2023.
Table 2: Current POW applications with Department of Mines, Industry Regulation and Safety (DMIRS)
Project
Tenement
Drill type
Approved
Dundas Sth
E63/2001
RC
Yes
Dundas Sth
E63/2001
AC
Yes
Mt Jewell
E27/566
DD
Yes
MM Hill
E37/1408
RC
Yes
Dundas Sth
E63/2000
Auger
Yes
Dundas Sth
E63/2000 and E63/1993
AC
Yes
Dundas Sth
E63/2000 and E63/1993
RC
Pending
A Heritage Agreement has been signed with The Ngadju Native Aboriginal Title Corporation (NNTAC)
during the Quarter which covers all of the Company’s Dundas tenements.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 11: Lightning Minerals’ project tenement summary
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 12: Location of Dundas project tenements
OTHER RELEVANT ANNOUNCEMENTS DURING THE QUARTER
CHANGE OF DIRECTOR’S INTEREST NOTICE
(ASX ANNOUNCEMENT 11 APRIL 2023)
Non-Executive Director Craig Sharpe purchased 100,000 shares of Lightning Minerals on-market for a
total consideration of A$15,022.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
EMPLOYEE SHARE OPTION PLAN RULES
(ASX ANNOUNCEMENT 17 APRIL 2023)
The Company published its Employee Share Option Plan Rules.
NOTIFICATION REGARDING UNQUOTED SECURITIES – L1M
(ASX ANNOUNCEMENT 17 APRIL 2023)
The Company issued performance related options to its exploration team as outlined in Table 3.
Table 3: Issue of unlisted options issued to the Company’s exploration team
Security Description
Total No. of Securities
Issue Date
Expiry Date
Unlisted Options with an exercise price of 30 cents per Option
80,000
6/04/2023
06//04/2027
Unlisted Options with an exercise price of 40 cents per Option
110,000
6/04/2023
06//04/2027
Unlisted Options with an exercise price of 50 cents per Option
140,000
6/04/2023
06//04/2027
PROJECT GENERATION
During the period the Company received a number of project opportunities, and conducted high-level
internal project evaluation and will continue to identify and review projects that may be complimentary
to its business.
FINANCE
EXPLORATION EXPENDITURE
The Company spent A$208,000 on exploration activities during the period, focused principally on the
Dundas Projects. The Company has cash and cash equivalents of A4.69 Million at 30 June 2023.
QUARTERLY USE OF FUNDS
Under ASX listing rule 5.3.4 the company presents its quarterly use of funds against its IPO Prospectus
projections as shown in Table 4.
Table 4: Use of funds against IPO prospectus projection
Expenditure
Exploration (A$)
Prospectus
Q2 23
Q3 23
Q4 23
Q1 24
Q2 24
Q3 24
Q4 24
Q1 25
Q2 25
TOTAL
4,900,000
129,000
574,000 217,000
920,000
Working Capital (A$)2
1,374,000
314,000
363,000
352,000
1,029,000
Costs of Offer (A$)3
726,000
486,000
34,000
21,000
1
541,000
includes items 1.2(a) and 2.1(d) from Appendix 5B, includes items 1.2(d) and 1.2(e) from Appendix 5B, includes item 3.10
1
2
3
OTHER DISCLOSURES
As disclosed under item 6.1 in the Appendix 5B and under ASX listing rule 5.3.5, the Company made
payments for a total consideration of A$48,000 relating to payments for Non-Executive Directors for
Director’s normal monthly fees and undertaking additional duties to support corporate and exploration
activities.
Non-Executive Director Craig Sharpe purchased 100,000 shares of Lightning Minerals on-market for a
total consideration of A$15,022.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
CORPORATE ACTIVITIES
CAPITAL STRUCTURE
The capital structure at 30 June2023 was:
48,432,000 shares
5,200,000 options (each exercisable at $0.25 each expiring 22/11/2027)
5,000,000 options (each exercisable at $0.25 each expiring 22/11/2026)
80,000 options (each exercisable at $0.30 each expiring 06/04/2027)
110,000 options (each exercisable at $0.40 each expiring 06/04/2027)
140,000 options (each exercisable at $0.50 each expiring 06/04/2027)
o 4,800,000 performance shares
o 26,728,543 Listed Options (each exercisable at $0.25 each expiring 13/03/2028)
o
o
o
o
o
o
This announcement has been approved for release by the Board of Directors.
-ends
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Stock Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas project is
located in the prolific Dundas region of Western Australia. The Company also has other projects in Western Australia, Mt Jewell,
Mt Bartle and Mailman Hill prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results
to differ materially from those disclosed in forward looking statements, there may be other factors that could cause
actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events
are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on
forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any
continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the
Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to
advise of any change in events, conditions or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr
Jarrad Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr
Woodland is a full-time employee of the company. Mr Woodland has sufficient experience which is relevant to the style of
mineralisation and types of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Woodland consents to the inclusion of his name in the matters based on the information
in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements, and that all material assumptions and technical parameters have not materially
changed. The Company also confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original market announcements.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
APPENDIX 1 - SCHEDULE OF TENEMENTS AS AT 30 JUNE 2023
Tenement
Status
Area
(km2)
Grant Date
Expiry Date
Annual
Rent
(A$)
Annual
Expenditure
(A$)
Royalty
Ownership
E15/1748
Granted
29.13
6/11/2020
05/11/2025
2,750
20,000
1% NSR
100%
E63/1932
Granted
17.01
30/09/2019
19/09/2024
1,650
20,000
1% NSR
100%
E63/1993
Granted
29.07
15/05/2020
14/05/2025
2,750
20,000
1% NSR
100%
E63/2000
Granted
93.10
23/10/2020
22/10/2025
8,800
32,000
1% NSR
100%
E63/2001
Granted
23.24
23/10/2020
22/10/2025
2,200
20,000
1% NSR
100%
E63/2028
Granted
46.50
14/05/2021
13/05/2026
2,448
20,000
1% NSR
100%
E28/3027
Granted
160.84
17/05/2021
06/05/2026
8,415
55,000
1% NSR
100%
E28/3028
Granted
55.51
17/05/2020
16/05/2026
2,907
20,000
1% NSR
100%
Mt Jewell
E27/566
Granted
8.89
8/11/2016
07/11/2026
2,133
30,000
1.5% NSR
100%
Mailman Hill
E37/1408
Granted
101.83
12/05/2021
11/05/2026
5,202
34,000
1% NSR
100%
E53/2151
Pending
193.62
(01/10/2020)
-
-
-
1% NSR
100%
E53/2159
Pending
78.33
(08/09/2020)
-
-
-
1% NSR
100%
E53/2147
Pending
124.98
(18/12/2020)
-
-
-
1% NSR
100%
Project
Dundas
South
Dundas
North
Mt Bartle
*Applications for Mt Bartle tenements pending
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
APPENDIX 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
LIGHTNING MINERALS LTD
ABN
Quarter ended (“current quarter”)
40 656 005 122
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(9)
(42)
(b) development
-
-
(c) production
-
-
(d) staff costs
(216)
(587)
(e) administration and corporate costs
(136)
(466)
(a) exploration & evaluation (if expensed)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
6
6
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(355)
(1,089)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
-
-
(b) tenements
-
(300)
(c) property, plant and equipment
-
-
(208)
(880)
(d) exploration & evaluation (if capitalised)
ASX Listing Rules Appendix 5B (17/07/20)
+See chapter 19 of the ASX Listing Rules for defined terms
1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (12
months)
$A’000
(e) investments
-
-
(f)
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(208)
(1,180)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
7,041
2.2
other non-current assets
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(21)
(413)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(21)
6,628
4.
Net increase / (decrease) in cash and
cash equivalents for the period
(584)
4,359
4.1
Cash and cash equivalents at beginning of
period
5,278
335
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(355)
(1,089)
ASX Listing Rules Appendix 5B (17/07/20)
+See chapter 19 of the ASX Listing Rules for defined terms
2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (12
months)
$A’000
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(208)
(1,180)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(21)
6,628
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
4,694
4,694
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
3,694
5,278
5.2
Call deposits
1,000
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,694
5,278
6.
Payments to related parties of the entity and their associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts