Lightning accelerates Warby tungsten exploration program
Released
Released
Announcement PDF
13 July 2026
7 July 2026
ASX ANNOUNCEMENT
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au
LIGHTNING ACCELERATES WARBY TUNGSTEN
EXPLORATION FOLLOWING HIGH-GRADE ASSAY
RESULTS
HIGHLIGHTS
• Phase 2 exploration program commences at the 100%-owned Warby Project
in North Queensland following encouraging high-grade tungsten rock chip
results announced in May 2026.
• This mapping and geochemistry program is designed to define the
scale, orientation and continuity of tungsten mineralisation within a target
prospective 2km structural length.
• Approximately 100 soil and rock samples to be acquired, targeting stream
sediment and geological mapping.
• Program targets extensions to known wolframite-bearing quartz veins together
with concealed intrusive-related tungsten mineralisation associated with the
Angor Granite contact.
• Warby complements Lightning's flagship Mt Turner Gold Project and supports the
Company's disciplined Australian focused exploration strategy established under
the April 2026 Strategic Reset.
• Tungsten is recognised as a critical mineral by Australia and other western
nations, underpinned by growing strategic demand from defence, aerospace and
advanced manufacturing industries.
• Assayresults expected during August 2026 andwill assist prioritisationof Phase
3 exploration and potential drill targeting.
Lightning Minerals Limited (ASX: L1M) (“Lightning”or“the Company”) is pleased to announce the
commencement of its Phase 2 tungsten exploration program at its wholly owned Warby Project
(“Warby” or the“project”) in North Queensland.
The program follows the Company's successful Phase 1 reconnaissance program, which
confirmed the presence of high-grade tungsten mineralisation within a favourable intrusive-
related geological setting and demonstrated significant exploration potential of the project.
Phase 2 has been designed to define the footprint, orientation and continuity of tungsten
mineralisation through detailed geological mapping, soil geochemistry and stream sediment
concentrate sampling across priority structural targets identified during the initial exploration
campaign.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 2
COMMENT
Lightning Minerals Managing Director, Troy Brice, commented:
"The commencement of Phase 2 at Warby demonstrates Lightning's commitment to
systematically advancing high-quality exploration opportunities across our Australian
portfolio.
"Our initial rock chip program confirmed high-grade tungsten mineralisation associated with
a highly prospective intrusive geological setting. This next phase is focused
on determining the size, continuity and potential scale of the mineralised system while
generating priority drill targets.
"Although Mt Turner remains Lightning's flagship asset and principal capital allocation
priority, Warby provides shareholders with exposure to one of the world's most strategically
important critical minerals.
"The increasing importance of tungsten to global defence capability, advanced
manufacturing and secure Western supply chains has supported recent record tungsten
prices and generated significant industry and investor interest. We believe Warby represents
an exciting complementary growth opportunity within our North Queensland portfolio.”
EXECUTING THE STRATEGY
The commencement of Phase 2 exploration at Warby represents another important milestone in
delivering Lightning's April 2026 Strategic Reset 1
.
Under the Company's revised strategy, Lightning is focused on disciplined capital allocation;
• Tier 1 – Mt Turner Gold Project (Flagship Project)
• Tier 2 – Australian Gold, Copper and Critical Minerals Growth Projects
Mt Turner remains Lightning's primary value driver and resource definition priority, and Warby
provides strategic exposure to the rapidly emerging tungsten sector and strengthens the
Company's North Queensland exploration portfolio (refer to Figure 1).
1
ASX announcement 16 April 2026 – Strategic Plan and Portfolio Simplification
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 3
Figure1: Location of Lightning Minerals tenements in North Queensland
Building on Successful Phase 1 Results
The Phase 2 program follows encouraging exploration results reported across three ASX
announcements in May and June 2026 2
.
Phase 1 confirmed the presence of significant tungsten mineralisation through sampling of
historical wolframite-bearing quartz veins within a previously underexplored intrusive setting.
Historical regional drainage sampling also identified anomalous tungsten values of up
to 102ppm tungsten, highlighting broader exploration potential across the 100%-owned
project.
Importantly, reconnaissance mapping established that mineralisation occurs within a
northwest-trending structural corridor extending approximately 2 kilometres, with limited
outcrop exposure suggesting substantial potential remains concealed beneath transported
cover.
2 Three ASX announcements: 19 May 2026 – Significant Tungsten Potential Identified at The Warby Project in
North Queensland, Supports Tenure Prospectivity. 22 May2026 – Supplementary Information – Warby Project
Tungsten Announcement. 4 June 2026 – High-Grade Tungsten Assays confirm Extensive Mineralisation.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 4
Figure 2: Location of EPM 28262 Warby and adjacent Scardon tenement
GEOLOGICAL SETTING
The Warby Project is located approximately 28 km north of Mount Surprise in North Queensland
and is centred on Exploration Permit EPM 28262 (refer to Figure 2).
The project targets intrusive-related, tungsten mineralisation associated with the contact
between the Permo-Carboniferous Angor Granite and Proterozoic Lyndbrook Metamorphic
Complex (refer to Figure 3). This geological setting is recognised as favourable for intrusion-
related tungsten deposits. Historical workings occur proximal to the granite contact and are
associated with wolframite-bearing quartz veins and greisen alteration developed along
northwest-trending structural corridors.
The Company believes additional mineralised structures may remain concealed beneath
transported sediments and vegetation cover.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 5
Figure 3 Sample no 105498 (3.04% W). Vein no 3. Field of view approximately 22cm. Coarse patches
of biotite and wolframite within a coarse weakly brecciated pegmatitic granite. ASX announcement
dated 4 June2026.
Phase 2 Exploration Program and Objectives
Is designed to define the scale and orientation of the tungsten system and generate future drill
targets. Approximately 100 samples to be collected over a 7-10-day field program (refer to Figure
4). Samples will be analysed by ALS Laboratories, with tungsten assays undertaken in Townsville
before multi-element analysis in Brisbane.
• Objective 1. Determine the strike length of known tungsten-bearing quartz vein
mineralisation towards Dickson Creek.
• Objective 2. Identify additional concealed mineralisation between known workings,
including additional quartz veins and disseminated wolframite mineralisation hosted
within greisenised granite.
• Objective 3. Assess a broader 9-kilometre granite-metamorphic contact for additional
tungsten mineralisation and prioritise follow-up exploration.
Results from the initial program will guide the scope of future exploration across the remaining
contact zone.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 6
Figure 4 - Map of Warby proposed stream sediment sampling (white dots) and soil sampling (green)
North Queensland Growth Strategy
Warby complements the Company's expanding North Queensland exploration portfolio
alongside the flagship Mt Turner Gold Project. Together, these provide Lightning with exposure to
Gold, Tungsten, Copper & Critical Minerals.
• Within highly prospective geological terrains supported by established regional
infrastructure.
• The Company believes this diversified exploration pipeline strengthens its ability to
deliver multiple exploration catalysts while maintaining disciplined capital allocation.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 7
NEXT STEPS
The Company will provide shareholders with updates on:
• Completion of Phase 2 field activities.
• Laboratory assay results and integration of geochemical and geological data.
• Generation of priority drill targets and Phase 3 exploration.
• The advancement of the Mt Turner Gold Project towards resource definition.
References to Previous ASX Announcements
This announcement should be read in conjunction with the Company’s previous
announcements, including:
• 16 April 2026 – Strategic Plan and Portfolio Simplification.
• 19 May 2026 – Significant Tungsten Potential Identified at The Warby Project in North
Queensland, Supports Tenure Prospectivity
• 22 May2026 – Supplementary Information – Warby Project Tungsten Announcement
• 4 June 2026 – High-Grade Tungsten Assays confirm Extensive Mineralisation.
~ Ends ~
This announcement has been authorised for release by the Board of Lightning Minerals Limited.
For more information, please visit: lightningminerals.com.au
Enquiries in relation to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Corporate Storytime
Troy Brice Paul Berson
Managing Director Investor & Media Relations
Phone +61 8 9429 8806 Phone +61 421 647
admin@lightningminerals.com.au paul@corporatestorytime.com
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 8
About Lightning Minerals Ltd (ASX: L1M)
Lightning Minerals Limited is an Australian exploration and development company focused on
advancing a portfolio of gold and copper assets in Tier 1 mining jurisdictions.
The Company’s flagship asset is the wholly owned Mt Turner Gold Project in northern
Queensland, which hosts a large-scale gold system extending over approximately 14km of strike
along the prospective Drummer Fault. Mt Turner is the primary focus of exploration, with ongoing
drilling aimed at progressing the project toward resource definition and development.
Lightning Minerals also holds a pipeline of gold and copper projects across Australia, including
assets in the Lachlan Fold Belt in New South Wales and the Eastern Goldfields of Western
Australia, providing additional exploration upside and growth opportunities.
The Company’s objective is to create long-term shareholder value through disciplined
exploration, resource growth and the development of high-quality mineral assets.
A. 32 Harrogate Street, West Leederville Perth, WA 6007
T. +61 (08) 9429 8806
E. admin@lightningminerals.com.au
lightningminerals.com.au 9
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking
statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”,
“estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements
regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and
expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of
exploration and project development, including the risks of obtaining necessary licences and permits and diminishing
quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company
operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and
retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and
operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any
material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the
Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to
differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual
results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond
the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing
obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does
not undertake any obligation to publicly update or revise any of the forward-looking statements or to advise of any change
in events, conditions or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Lee
Spencer, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Spencer is a
contractor to the Company. Mr Spencer has sufficient experience which is relevant to the style of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Spencer
consents to the inclusion of his name in the matters based on the information in the form and context in which it appears.
Mr Spencer holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in
the original market announcements, and that all material assumptions and technical parameters have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Share your feedback
Discover