Drilling to Begin on High Priority Gold Targets at Mt Turner
Released
Released
Announcement PDF
Drilling to Begin in September on High Priority Gold Targets at
Mt Turner Project
ASX Announcement
01 September 2025
Lightning Minerals (L1M or the Company) is pleased to announce that drill contractors have been
appointed for the upcoming inaugural drill program at the Company’s newly acquired gold project, Mt
Turner in Queensland, Australia. Plans for drilling are now underway following positive results from the
Company’s EGM supporting the Lotus Minerals acquisition (ASX Announcement 26 August 2025 and
ASX Announcement 30 June 2025).
HIGHLIGHTS
• Up to 1,300m of diamond drilling across five high priority gold targets to begin week of 15th
September 2025
• Previous mining and drilling has demonstrated the near surface, high-grade potential of Mt Turner with
results including1:
o
o
o
o
o
16m @ 3.56 g/t Au (Hole UMDT95_D04)
16.0m @ 3.60g/t Au (Hole UMDT95_D03)
12m @ 6.5g/t Au (Hole UMDT95_D03)
7m @ 1.7g/t Au and 43g/t Ag from 64m (Hole 21ISMDWRC001); and
3m @ 5.1g/t Au and 51g/t Ag from 83m (Hole DH2)
• Soil sampling expected to be completed within next week along 9km of the Drummer Hill Fault
System testing for coherent linear gold anomalies
Highly experienced drilling contractor GeoDrill Australia has been appointed to complete up to 1,300m
of diamond drilling below five existing historic open pits which were mined for gold in the 1980s and
1990s. Drilling is planned to begin week starting the 15th September 2025. GeoDrill were successful
following a tender process to three drilling companies and demonstrated the experience, excellence
and attitude that the Company demands from its contracting partners.
Targeting has been an ongoing task for the Company’s geology team during the past month and
supported by a site visit to Mt Turner in July (ASX Announcement 24 July 2025) and the Company
continues its process of further evolving the thesis for Mt Turner. The inaugural drill program will target
potential continuations of mineralisation at depths up to 150m below existing open pits where previous
drilling is minimal or non-existent. Drilling will also target lateral extensions along the Drummer Fault.
Soil sampling is due to be completed in the next week with samples to then be sent to the ALS Global
Laboratory in Townsville. Assays are expected to be received within 4-6 weeks. The soil sampling
program is designed to develop further targets along the Drummer Fault and support the next phase of
drill targeting.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Lightning Minerals’ Managing Director Alex Biggs said, “We’re looking forward to starting our first drill
campaign at Mt Turner. There are multiple targets which the team has a high degree of confidence in.
Combined with other ongoing works at Mt Turner including soil sampling and ground reconnaissance
works we are developing multiple drill targets across both gold and copper targets which sets us up for
a busy and exciting period ahead. We know that Mt Turner was mined in multiple locations in the past,
targeting high grade, oxide mineralisation. We believe there are multiple opportunities for identification
and delineation of gold mineralisation that remain along the Drummer Fault which extends 14km. We
welcome GeoDrill as our drilling partners and look forward to a safe and productive drill campaign”.
Mt Turner Gold Project – Phase 1 Drill Plan
Drilling has been designed to demonstrate the potential for extensions to, orientation of and style of
mineralisation beneath the existing Rocky Reward, Drummer Girl, Drummer Boy, Drummer West and
Drummer East pits. Existing pits were excavated to a maximum depth of 20m targeting high-grade oxide
material during the 1990s with little exploration at depths below 100m. Drilling will begin the week
starting 15th September.
Drill hole locations as shown in Figures 1 and 2 and are subject to change as drilling advances.
Figure 1: Indicative drill targeting at the Mt Turner Gold Project – Drummer Deposits (Digital Terrain Model showing
existing open pits, previous drill locations and planned drill hole locations)
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 2: Indicative drill targeting at the Mt Turner Gold Project – Rocky Reward Deposit (Digital Terrain Model
showing existing open pits, previous drill locations and planned drill hole locations)
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
Mt Turner Gold Project – Soil Sampling
A soil sampling program is nearing completion and has been designed to test for coherent linear gold
anomalies between the known Drummer and Rocky Reward open pits, over a strike length of 12.5 km as
shown in Figure 3.
The soil sampling program will collect samples along the Drummer Hill Fault System on a fence line
spacing of 100m, with samples collected along the fence lines every 20m.
Soils at Georgetown are skeletal except for sheet wash and recent sediments from active drainages.
There are no deep soil profiles as the terrain is an emerging landscape. A handheld mechanical auger
will be used to collect soil samples from ground within the B soil horizon. Samples will be sent to the
ALS Global Laboratory in Townsville for sample preparation and chemical analysis with results expected
within 4-6 weeks.
Results will assist with further drill targeting and aim to demonstrate continuity of mineralisation along
the strike of the Drummer Fault.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 3: Indicative soil sampling campaign along the Mt Drummer Hill Fault at the Mt Turner Gold Project (Digital
Terrain Model showing soil sampling areas across total tenement area of EPM 27525 and EPM 27170)
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
About the Mt Turner Gold Project
The Mt Turner Gold Project is located 15km to the northwest of Georgetown in North Queensland. The
Mt Turner Gold Project is granted Exploration Permits (EPM 27170 and EPM 27525) and will be explored
by the Company with the intention of identifying an economic gold resource with accessory silver along
the Drummer Fault structure, a 14 km east-west structure readily visible on LiDAR and satellite imagery.
Historically, several shallow oxide pits were mined for gold in the 1990’s along the Drummer Fault. In
addition, northeast trending structures have intersected the Drummer Fault in a number of locations,
with these structures potentially contributing to the formation of higher-grade mineralisation of yet
undiscovered mineralised splay faults. Multiple targets exist along the Drummer Fault and below existing
open pits.
Prior drilling has been completed by Essex Minerals Inc2 during 2021, Union Mining NL3 in the 1990s,
and CRA Exploration Ltd4 in the late 1980s intersecting multiple gold lodes with positive results including
16m @ 3.56 g/t Au (Hole UMDT95_D04), 16.0m @ 3.60g/t Au (Hole UMDT95_D03), 12m @ 6.5g/t Au
(Hole UMDT95_D03) and 6m @ 2.9g/t Au (Hole PD86_RR2). These results formed the basis for open pit
mining across six open pits in the 1990s. Minimal exploration has occurred beneath the historical open
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
pits but multiple targets exist with shallow mineralisation intercepts of up to 7.0m @ 1.74g/t Au (Hole
21ISMDWRC001) and 7.5m @ 1.6g/t Au (Hole QMCD83_D04).
Relevant information pertaining to the drill holes is listed in Appendix 3 - Table 1 and Table 2 at the back
of this announcement.
Further information on Mt Turner project and the Lotus Minerals acquisition in full can be found in the
Company’s ASX Announcement dated 30 June 2025.
Figure 4: Isometric view of Mt Turner project demonstrating the 14km Drummer Fault (LANDSAT image)
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
Esperança Assays Update
Samples are now at the SGS laboratory in Belo Horizonte with results expected within 4-6 weeks.
Sample shipping was delayed due to further analysis and sample selection procedures being
employed to ensure appropriate material was sent for analysis.
On ground reconnaissance works and target generation is ongoing across all tenements in Brazil.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
REFERENCES
Prior drilling results contained within this document have been reviewed and compiled by the
Competent Person and reported in accordance with JORC Code 2012. See Company Announcement
30 June 2025 - Acquisition of Advanced Brownfields Gold and Copper Projects
1
Essex Minerals (TSX-V:ESX) TSXV Announcement - Essex Reports Numerous High-Grade Gold
Intercepts At Drummer Fault, October 13, 2021 (https://essexminerals.com/wp-content/uploads/ESX2021-10-13-NR-Drummer-Fault-Drilling-FINAL.pdf)
2
Essex Minerals (TSX-V:ESX) TSXV Announcement – ESSEX Samples Up to 14.55 G/T Gold Extending
Gold Mineralisation Along Drummer Fault, Mt Turner Gold Project (https://essexminerals.com/wpcontent/uploads/ESX-2021-07-13_NR-Mt-Turner-Exploration-FINAL.pdf)
3
CRA Exploration Ltd 1987 - Clark Creek A to P 4416M, North Queensland, Report On Investigations For
The First Six Months Of Tenure, https://geoscience.data.qld.gov.au/data/report/cr016859
4
Approved for release by the Board of Directors
-ENDMore information at www.lightnmingminerals.com.au
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Securities Exchange (ASX:L1M) and focused
on the exploration of gold, critical minerals and lithium. The acquisition of Lotus Minerals provides the Company with
access the gold and copper markets through near term, brownfields projects in Australia. The Company also owns the
Caraíbas, Canabrava and Esperança lithium projects in Minas Gerais, Brazil, the Dundas projects in Western Australia, the
Dalmas and Hiver lithium projects in Quebec, Canada. The Company also holds other projects in Western Australia which
include Mt Bartle and Mailman Hill which are prospective for gold, base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking
statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”,
“estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements
regarding plans, strategies and objectives of management, anticipated production or construction commencement dates
and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature
of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing
quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company
operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and
retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and
operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any
material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429
Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results
to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual
results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are
beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on
forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any
continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the
Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to
advise of any change in events, conditions or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr
Matthew Watson, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr
Watson is a full-time employee of the Company. Mr Watson has sufficient experience which is relevant to the style of
mineralisation and types of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Watson consents to the inclusion of his name in the matters based on the information in
the form and context in which it appears. Mr Watson holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements, and that all material assumptions and technical parameters have not materially
changed. The Company also confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original market announcement.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Appendix 1: Project Acquisition – JORC Code 2012 Table 1 Criteria
The Table below summarises the assessment and reporting criteria used for exploration results for the Acquisition projects and reflects the guidelines in Table 1 of The Australasian
Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Commentary
•
The exploration data contained within the announcement has been provided by Lotus Minerals and
reviewed and compiled by the Company and its competent person.
•
The state scale opensource geology is sourced from the various state geological bodies, namely the
Geological Survey of Queensland (GSQ).
With respect to the 2021 drilling by Essex Minerals2
•
Drilling consisted of two HQ diamond holes with RC pre-collars, the remaining four holes were
completed as Reverse Circulation using a 5.5-inch drill bit.
•
All samples were processed in Townsville by ALS Global, an independent accredited laboratory. Gold
assays were completed by 50g screen fire assay with atomic absorption finish, with the over limit
samples rechecked by 50 g fire assay with a gravimetric finish. Silver and 33 multi-element analysis
was undertaken by a four-acid digest followed by inductively coupled plasma atomic emission
spectroscopy (ICPAES).
With respect to the 1995 drilling by Union Mining NL3
•
Drilling consisted of forty-eight air core drill holes, with a sample interval of 2m, with no records for
blade size.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
Drilling was by conventional open hole percussion methods, with a sample interval of 2m, using a 4.5inch hammer.
•
Drilling techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
With respect to the 2021 drilling by Essex Minerals2
•
Drilling consisted of two HQ diamond holes with RC pre-collars, the remaining four holes were
completed as Reverse Circulation using a 5.5-inch drill bit.
With respect to the 1995 drilling by Union Mining NL3
•
Drilling consisted of forty-eight air core drill holes, with a sample interval of 2m, with no records for
blade size.
•
Samples were analysed for Au. No record of the laboratory, analytical method or detection limits has
been found.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
Drilling was by conventional open hole percussion methods, with a sample interval of 2m, using a 4.5inch hammer.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Drill sample recovery
Logging
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Method of recording and assessing core and chip sample recoveries and results
assessed. Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
With respect to the 2021 drilling by Essex Minerals2
•
No information regarding sample recovery is available.
With respect to the 1995 drilling by Union Mining NL3
•
No record of sample recovery is documented.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
• No record of sample recovery is documented.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
• Anecdotal comments by the supervising geologist suggest a lack of sample return, the exact details of
which are unknown.
Whether core and chip samples have been geologically and geotechnically
With respect to the 2021 drilling by Essex Minerals2
logged to a level of detail to support appropriate Mineral Resource estimation,
• All holes have been geologically logged at 1m intervals for weathering, rock type, colour, mineralogy
mining studies and metallurgical studies.
and where possible, protolith, texture, and grainsize.
Whether logging is qualitative or quantitative in nature. Core (or costean,
•
The logging is qualitative and appears to be consistent, both between adjacent drill holes, and with
channel, etc) photography.
respect to the assay data for the corresponding sample interval. The data appears to be of an
The total length and percentage of the relevant intersections logged.
industry standard, however further confirmation of the logging is required to increase the level of
confidence in the logging data. At present the data quality is not comprehensive enough to support
mineral resource estimation.
With respect to the 1995 drilling by Union Mining NL3
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
•
Logging data is not reported and remains unknown.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
Samples have been qualitatively geologically logged at 2m intervals, the logging is considered to be of
a high standard however remains insufficient to be used within any modern mineral estimations.
With respect to the 2021 drilling by Essex Minerals2
•
Core samples were cut in half with a diamond saw, with one half of each interval sent for laboratory
analysis.
•
•
It is unclear how RC chip samples were prepared and sampling technique remains unknown.
•
The method of subsampling is not reported and remains unknown.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
The method of subsampling is not reported and remains unknown.
No mention of certified reference materials has been identified in the original reports.
With respect to the 1995 drilling by Union Mining NL3
With respect to the 2021 drilling by Essex Minerals2
•
All samples were processed in Townsville QLD by ALS Global, an independent accredited laboratory.
Gold assays were completed by 50g screen fire assay with atomic absorption finish, with the over
limit samples rechecked by 50 g fire assay with a gravimetric finish. Silver and 33 multi-element
analysis was undertaken by a four-acid digest followed by inductively coupled plasma atomic
emission spectroscopy (ICPAES).
•
Analytical techniques were Au_SCR24, Au-AA26 and ME-ICP61.
With respect to the 1995 drilling by Union Mining NL3
•
Samples were analysed for Au. The laboratory, analytical method and detection limits remain
unknown.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
Samples were analysed for Cu, Pb, Zn, Ag, As, and Au by Tetchem Laboratories of Cairns.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
•
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
The Analytical Method and detection limits are not recorded.
The verification of significant intersections by either independent or alternative
• The Company has yet to verify any prior drilling by field visitation.
company personnel.
• No twinned holes have been completed due to the early stage of exploration. The Company will
The use of twinned holes.
consider the twinning of previous holes to undertake further due diligence at the projects.
Documentation of primary data, data entry procedures, data verification, data
• Sample and drill hole locations are regularly digitised from georeferenced maps and as such are
storage (physical and electronic) protocols.
40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au
(08)
considered accurate to with ±20m|on
the9429
X and8806
Y planes. This level of accuracy is considered
Discuss any adjustment toLevel
assay 11
data.
acceptable at this early stage of exploration, and prior to field validation of exploration data.
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
•
The documentation of primary data, data entry procedures, data verification, data storage (physical
and electronic) protocols completed by Lotus Minerals is currently unknown. Data collection and
validation into Lightning Minerals databases remains as an ongoing task for company employees.
•
•
No drill data has been used for mineral resource estimation purposes.
•
•
All drill holes have been converted to GDA94 / MGA zone 54 - EPSG:28354
•
•
•
The sample spacing of the reported data is considered appropriate for early exploration drilling
Sample and drill hole locations are regularly digitised from georeferenced maps and as such are
considered accurate to with ±20m on the X and Y planes. This level of accuracy is considered
acceptable at this early stage of exploration, and prior to field validation of exploration data.
Topography control over the Mt Turner Project is excellent. A LiDAR survey was completed in 2020
with horizontal and vertical accuracy to within 0.05m.
No Mineral Resource or Ore Reserve Estimates have been completed.
No sample compositing has been applied to previously reported exploration information.
With respect to the 2021 drilling by Essex Minerals2
•
The orientation of the drilling program is considered sufficiently perpendicular to the strike and dip of
the mineralisation given the early stage of exploration.
With respect to the 1995 drilling by Union Mining NL3
The drilling was conducted at approximately perpendicular to the strike of the exploration target, drill
hole dip was approximately 60° and are specified in Appendix 3 below.
With respect to the 1987 QLD drilling by CRA Exploration Pty Ltd4
•
The drilling was conducted at approximately perpendicular to the strike of the exploration target, drill
hole dip was approximately 60° and are specified in Appendix 3 below.
Sample security
The measures taken to ensure sample security.
•
The chain of custody for sampling procedures within previously reported exploration drilling is not
known.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
No audits or reviews of sampling techniques have been conducted to date.
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
Commentary
•
Lotus Minerals Pty Ltd holds exclusive options to acquire the Tenements that comprise the ‘Mt
Drummer’ tenure.
•
•
The Mt Drummer Project includes exploration licences EPM27525, and EPM27170
The Tenements are considered in good standing at the time of this report.
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
Geology
•
Exploration undertaken by prior parties remains an ongoing data collation exercise for company
geologists.
•
The Mt Drummer Project:
• CRA Exploration 1985-1990, Union Mining 1993-2003, Mega Uranium 2006-2014, KNX
Level 11 40 The Esplanade Perth WA 6000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Resources Aust 2015-2020, Essex Minerals 2020-2022, Meryllion Resources Corp 20202022.
Deposit type, geological setting and style of mineralisation.
•
The Mt Drummer Tenements are prospective for Orogenic and Epithermal Gold and Porphyry CuAu. They lie in the central portion of the Georgetown Inlier (GTI), which constitutes the bulk of the
Share your feedback
Discover