Proposed Brazilian Lithium Project Acquisition
Released
Released
Announcement PDF
`
Acquisition of Bengal Mining - Highly Prospective Lithium
Projects in Brazil’s Lithium Valley
ASX Announcement
22 April 2024
Lightning Minerals (L1M or the Company) is excited to announce the signing of a binding agreement to
acquire Bengal Mining Pty Ltd (Bengal) which holds, via its wholly owned subsidiary Tigre Mineracao
Ltda (Tigre) option agreements over two lithium projects, Caraíbas and Sidrônio (the Projects) in Brazil’s
prolific Lithium Valley district in the state of Minas Gerais (Proposed Acquisition).
The Company views the Proposed Acquisition as transformative for its future, leveraging the strategic
proximity of the projects to Latin Resources’ (ASX: LRS) Colina project1 hosting 70.3Mt @ 1.27% Li20 and
Sigma Lithium’s (NASDAQ: SGML) Grota do Cirilo project2 hosting 108.9Mt @ 1.41% Li20. The Projects
have been acquired from Bengal, a privately held Australian company which holds exclusive options
across all seven (7) tenements totalling 3,372 Ha.
HIGHLIGHTS
•
Projects located in the prolific Lithium Valley region of Minas Gerais 20km south of Latin
Resources’ (ASX: LRS) Colina project
•
Multiple pegmatites have been identified at the Caraíbas Project, with peak lithium rock
chip assay results grading up to 0.53% Li2O (lepidolite)
•
Significant tantalum (1,245ppm), rubidium (1,175ppm) and caesium (1,455ppm) rock chip
assay results are considered positive exploration indicators
•
Strong aeromagnetic geophysical trends correlate with regional mineralised trends
•
Projects lie within geology of the Salinas Formation which hosts other lithium Resources in
the region
•
Proposed Transaction based on 5Mt, 10Mt and 20Mt Resource milestones presenting
significant upside at both a project and company level demonstrating vendor confidence
•
Oversubscribed placement of A$1.5M at A$0.07 per share to facilitate work program
•
Field work to commence as soon as deal completion and approval at Company EGM
•
Access to a seasoned field team that holds significant local IP, providing invaluable
fieldwork expertise and insights
Note 1: Further exploration work to verify historically mapped and sampled pegmatites is necessary. The scale of the geological outcrops are
unknown and the presence of pegmatitic lithologies does not necessarily indicate the presence of lithium, tantalum or caesium mineralisation.
Note 2: The Company is op@mis@c about concluding the transac@on and acquisi@on outlined herein, however at the date of this announcement
no assurance that the condi@ons precedent with respect to the transac@on will be met. Accordingly, investors are cau@oned against making
investment decisions based on this announcement.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08)
9429 8806
It is with great excitement that Lightning Minerals announces what it considers the transformative
Proposed Acquisition of the Projects in the Lithium Valley region of Minas Gerais, Brazil. The Projects are
located in the Eastern Brazilian Pegmatite Province which currently hosts two world class lithium
deposits: Latin Resources’ (ASX: LRS) Colina project and Sigma Lithium’s (NASDAQ: SGML) Grota do
Cirilo project.
The Company is planning to begin on-ground works as soon as the Proposed Acquisition is finalised.
Early-stage reconnaissance works indicate presence of lithium bearing minerals (lepidolite) with the
immediate strategy to now confirm potential and then test via drilling. The Projects are subject to an
exclusive option agreement that allows the Company flexibility in its exploration approach to determine
the most prospective opportunities that it sees most value in based on initial work programs.
Lightning Minerals Managing Director Alex Biggs said, “This Proposed Acquisition represents a
significant transaction for the Company. We believe in the lithium thematic and see now as a great
opportunity to acquire highly prospective projects in known and established lithium regions. Minas
Gerais in Brazil has emerged as a proven lithium hub with the acquisition located in close proximity to
the world class lithium resources of Latin Resources’ (ASX: LRS) Colina project and Sigma Lithium’s
(NASDAQ: SGML) Grota do Cirilo project. The Project presents some excellent early indicators of lithium
mineralisation with prospective underlying geology that offers clear exploration targets. As part of the
transaction we welcome new key shareholders, to the Company and look forward to the next stage of
evolution of the business. It is exciting to see the Company developing and expanding our influence; we
now have projects in three of the predominant lithium regions in the world: Dundas in Western Australia,
Quebec in Canada and Mina Gerais in Brazil. We look forward to starting our on-ground works in Brazil
and also progressing works on our other projects in Western Australia and Canada”.
About the Projects and Minas Gerais as a Lithium Region
The Projects are located in the Lithium Valley region of Minas Gerais, Brazil. The Projects cover 3,372 Ha
comprising seven (7) exploration licences and are located approximately 20km south of Latin Resources’
(ASX: LRS) Colina lithium project and 60km north-west of Signa Lithium’s (NASDAQ: SGML) Grota do
Cirilo project (Figure 1). The region has emerged as one of the world’s premier lithium districts over the
past few years and presents significant exploration potential.
The Company will benefit from access to a seasoned ground team, providing invaluable fieldwork
expertise and insights, enhancing the Company's strategic approach to exploration. Relationships the
Company already has in the region will help facilitate project growth and advancement.
Minas Gerais is Brazil’s third largest economy with over 300 mines operating in the state with tier-1
operators including Vale, BHP and Rio Tinto. The state boasts a strong mining labour pool and presents
a cost competitive jurisdiction for exploration and project development with mature infrastructure, hydro
power and road access.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 1: Location of Caraíbas and Sidrônio projects
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Caraíbas and Sidrônio Projects
The Projects are located in the Eastern Brazilian Pegmatite Province that encompasses approximately
150,000 km2, stretching from Bahia state to Rio de Janeiro state. The Caraíbas Project consists of five (5)
separate tenements covering 1,733 Ha and the project area contains a series of albite and muscovite
rich pegmatites identified by Bengal’s initial reconnaissance works. Aeromagnetic data shows the
tenements are located along regional structures and shear zones which are analogous to the trends
present at Latin Resources’ (ASX: LRS) Colina deposit. The Caraíbas Project is located approximately
20km to the south in the same Salinas geological formation.
The Sidrônio Project consists of two (2) tenements covering 1,638 Ha, strategically located adjacent and
along strike to the south from the Caraíbas Project. Aeromagnetic data shows the tenements are located
along similar interpreted structural trends that may potentially be conduits for mineralisation.
Figure 2: Caraíbas and Sidrônio project location, geology and tenements
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Both Projects cover prospective Salinas Formation geology which is thought to provide adequate
rheological conditions suitable for the emplacement of late hydrothermal fluids. In similar geological
settings, proximal to S-type granites, the Salinas Formation is known to host fertile lithium mineral
bearing pegmatites.
Records from the ‘Project Evaluation of the Potential of Lithium in Brazil’ - Servico Geologico do Brasil
(Geological Service of Brazil)3 indicate that historic prospecting or fossicking may have occurred with the
Caraíbas Project. At this location an inactive mine location is recorded as ‘LB-43 Lavra Luís Rocha –
Caraíbas’ which is interpreted to be a small-scale prospecting excavation. The area was then targeted by
Bengal company geologists in late 2023 as part of a small reconnaissance program to identify lithium
prospectivity in the region. Three rock chip samples were taken from the site with peak assay results of
0.53% Li2O, 1,245 ppm tantalum, 1,175 ppm rubidium and 1,455 ppm caesium (Table 1). Geological
descriptions of the rock samples are shown in Table 2, and photographs of BLR237 and VLR1269 are
shown in Figure 3(a) and Figure 3 (b) respectively.
These results are considered encouraging and support the thesis that pegmatites in the project areas
might have favourable geochemistry and fractionation conditions. Elevated tantalum levels are
considered a good indicator of potential for adequate fractionation conditions and will form a key part
of the Company’s initial reconnaissance works and analysis. These results warrant immediate follow up
exploration and will form part of the near-term exploration plan for the Caraíbas project. A full table of
results for samples taken from the project areas are included in Appendix 2, Table 1.
Table 1: Assay data associated with samples taken at historic “inactive mine” location
Caraibas
Easting
(UTM
23S)
803813
Northing
(UTM
23S)
8194761
BLR237
Caraibas
803812
VLR1269
Caraibas
803808
Field
Name
Target
BLR238
Cs ppm
Li ppm
Nb ppm
Rb ppm
Sn ppm
Ta ppm
Li2O
%
K/R
b
704
1281
801
665
272
1245
0.28
29
8194766
1455
2457
64
1175
103
196
0.53
24
8194765
124
97
5
574
2.5
5
0.01
64
Table 2: Geological descriptions associated with samples taken at historic “inactive mine” location.
Caraibas
Easting
(UTM
23S)
803813
Northing
(UTM
23S)
8194761
Gpe (pegmatite) whitish with >> schorlite + lepidolite
BLR237
Caraibas
803812
8194766
Presence of rubellite and lepidolite. Zoned lepidolite (external halo with Li)
VLR1269
Caraibas
803808
8194765
Pegmatite rich in Lepidolite (Li) and light green tourmaline(?)
Field Name
Target
BLR238
Geology Description
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 3: (A) Photograph of sample BLR237 showing lepidolite minerals (purple) within pegmatite sample (B)
Photograph of sample VLR1269 showing lepidolite minerals (purple) within pegmatite sample (C) Photographic
example of workings located within the larger Caraíbas tenement area (805118mE, 8193908mN). Samples
collected by Bengal Mining
Regional Geology, Prospectivity and Trends
The Eastern Brazilian Pegmatite Province is a globally recognised region for hard rock lithium
prospectivity. The Colina and Grota do Cirilo Project Lithium resources highlight the potential for the
region to host Tier 1 lithium deposits.
Like Caraíbas and Sidrônio, these deposits are located within the Salinas Formation proximal to PostCollisional Magmatism which are of the Type-S granitic geochemistry. S-Type granites are known to be
favourable and form part of the genetic model for the creation of lithium-caesium-tantalum (LCT)
deposits. The Salinas Formation commonly includes lithologies such as mica-quartz schists and quartzmica schists with localised intercalations of rocks, calcium-silicates, meta conglomerates and micaceous
quartzites. Reconnaissance work by Bengal has identified similar rock types at both the Caraibas and
Sidronio projects which are considered positive indicators when looking at the projects in a regional
context.
Multiple prospective geophysical trends have been identified through interpretation of publicly available
aeromagnetic data from the Servico Geologico do Brasil (Geological Service of Brazil) which correlates
with the parallel mineralised corridor that hosts Latin Resources’ (ASX: LRS) Colina deposit. These trends
will form the basis of further on-ground mapping, reconnaissance, and sampling across the tenements
with a view to defining drill targets.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 4: Caraíbas and Sidrônio projects location and tenements plotted against publicly available analytic signal
aeromagnetic image from Servico Geologico do Brasil (Geological Service of Brazil)
Program of Works and Use of Funds
The option agreements that the Company has acquired via Bengal allows for clear identification of drill
targets prior to full acquisition of the Project areas, either in full or in part. The Company has existing
relationships with contractors and personnel in the region which will significantly accelerate its work
programs and has a strong relationship with other operators in the region.
The following work programs will be completed across all projects. These work plans are subject to
change as the Company develops further knowledge of the Project areas.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Table 3: Initial work program strategy Caraíbas and Sidrônio projects
Work Program
Timing
Use of Funds (A$)
Ground reconnaissance – mapping and sampling
10 weeks
200,000
Geophysical drone survey
8 weeks
100,000
Drill target identification
8 weeks
50,000
Phase 1 drilling
12 weeks
960,000
Notes
To run concurrently
Table 4: Initial work program schedule Caraíbas and Sidrônio projects
Work Program
Jun
24
Jul
24
Aug
24
Sep
24
Oct
24
Nov
24
Dec
24
Ground reconnaissance – mapping and sampling
Geophysical drone survey and interpretation
Drill target identification
Phase 1 drilling
Proposed Acquisition Terms
The Company has entered into a binding share sale agreement with the majority shareholders of Bengal
to acquire all the issued capital of Bengal. Bengal holds exclusive options via its wholly owned subsidiary
Tigre, to purchase seven (7) tenements located in Brazil’s Lithium Valley region in the state of Minas
Gerais, comprising the Projects.
Subject to obtaining all regulatory and shareholder approvals, the initial consideration payable for the
acquisition of 100% of the shares in Bengal is as follows:
Consideration
a) 22,142,857 fully ordinary paid shares in the Company (Shares) to the value of A$1,550,000 based
on a deemed issue price of $0.07 per Share (Consideration Shares);
b) 6,000,000 L1M options, with an exercise price of $0.105 being a 50% premium to the Share price
of $0.07 and an expiry date of three years from the date of issue (Consideration Options); and
c) 39,999,999 performance rights that will convert into Shares on a one-for-one basis, subject to the
satisfaction of the milestones outlined below (Performance Rights).
The issue of the Consideration Shares, the Performance Rights and the Shares issued on conversion of
the Performance Rights will be subject to voluntary escrow for a period of 12 months from the date of
issue.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Milestones
a) Milestone 1: 14,285,714 Performance Rights to vest into Shares subject to the Company
delineating a JORC compliant Mineral Resource Estimate on the Projects of at least 5Mt grading
at least 1.0% Li2O within three years from the date of issue;
b) Milestone 2: 14,285,714 Performance Rights to vest into Shares subject to the Company
delineating a JORC compliant Mineral Resource Estimate on the Projects of at least 10Mt grading
at least 1.0%Li2O within four years from the date of issue; and
c) Milestone 3: 11,428,571 Performance Rights to vest into Shares subject to the Company
delineating a JORC compliant Mineral Resource Estimate on the Projects of at least 30Mt grading
at least 1.0%Li2O within five years from the date of issue.
Exclusive Option Exercise
Bengal (via its wholly owned subsidiary Tigre) has exclusive options across all tenements under the
following terms in Table 5. This allows the Company to conduct early-stage exploration quickly and
effectively to then determine which of the tenements are appropriate to exercise, minimising the
upfront expenditure.
Table 5: Exclusive option agreement terms
Project
Option
Period
Option
Fee
Monthly Fee
(US$)
Option Exercise
(US$)
Bonus (US$)
Royalty
Status
Caraíbas
24
month
100K
(Paid)
5K
1M per
tenement
Nil
Nil
Landowner
signed
Sidrônio
12
month
70K (Paid)
Nil
200K per
tenement
200K if 10Mt @
1.3% Li20 or
greater
1% NSR
Landowner
signed
Conditions Precedent
The Proposed Acquisition is subject to the following conditions precedent:
•
•
•
•
•
the minority shareholders of Bengal executing a binding share sale agreement;
satisfaction of the Company’s due diligence investigations;
the repayment of loans owed by Tigre;
the Company completing the Placement (defined below);
the Company obtaining any necessary ASX or shareholder approvals, including issue of the
Consideration Shares, Consideration Options, Performance Rights and Tranche 2 Placement Shares
and Options (defined below); and
• The parties obtaining any required third party approvals.
Cautionary Statement
The Company is optimistic about concluding the Proposed Acquisition, however, at the date of this
announcement there is no assurance that the conditions precedent with respect to the Proposed
Acquisition will be met. Accordingly, investors are cautioned against making investment decisions based
on this announcement.
Dilutionary Effect of Transaction
The below table shows the potential dilution of existing shareholders as a result of the Proposed
Acquisition.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Table 6: Dilutionary effect of transaction
Capital Structure
Shares
%
Options
Performance
Rights
Existing Securities
49,864,034
50.20
37,258,543
4,800,000
Consideration Securities
22,142,857
22.29
6,000,000
39,999,999
Placement Securities
21,428,571
21.57
10,714,286
-
S3 Consortium Pty Ltd (Stocks Digital)
5,892,857
5.93
-
-
Total Post Completion
99,328,320
100.00
53,972,829
44,799,999
Placement
The Company has received firm commitments in relation to a placement from new and existing
professional and sophisticated investors to raise A$1.50 million by the issue of 21,428,571 Shares at an
issue price of $0.07 (Placement Shares), with attaching quoted options (L1MO) exercisable at A$0.25
each and expiring 13 March 2028 (Placement Options) on the basis of 1 option for every 2 Placement
Shares subscribed for (Placement).
The Placement will take place in two tranches as follows:
(a) 7,479,605 Placement Shares issued on 29 April 2024 utilising the Company’s placement capacity
under Listing Rule 7.1, raising a total of A$523,572 (before costs) (Tranche 1); and
(b) 13,948,966 Placement Shares and 10,714,286 Placement Options subject to shareholder
approval pursuant to Listing Rule 7.1 and Listing Rule 10.11 (Listing Rule 10.11 director
participation detailed below), to raise a total of A$976,428 before costs (Tranche 2).
The Company engaged PAC Partners Securities Pty Ltd as lead manager and broker to the Placement
and will receive a fee of 6%.
Company directors Francesco Cannavo, Alex Biggs and Craig Sharpe will participate in tranche 2 of the
placement, subscribing for securities to the value of A$20,000, A$15,000 and A$10,500
respectively. The director’s participation in tranche 2 of the placement is subject to shareholder approval
for the purposes of ASX Listing Rule 10.11.
Extraordinary General Meeting (EGM)
The issue of the Consideration Shares, Consideration Options, Performance Rights and the Tranche 2
Placement Shares and Options will be subject to the Company obtaining shareholder approval at an
upcoming EGM of its shareholders.
Relevance of Proposed Acquisition
Brazil has emerged in recent years as a significant lithium mining region with Latin Resources (ASX: LRS)
Colina lithium project and Signa Lithium’s (NASDAQ: SGML) Grota do Cirilo project being the most
advanced and largest scale lithium projects in Brazil. The Eastern Brazilian Pegmatite Province in Minas
Gerais, which hosts the Company’s proposed acquisitions, is hole to 100% of Brazil’s official lithium
reserves. Also operating in the region is Lithium Ionic Corp. (TSXV: LTH) who have recently been
delineating its initial Mineral Resource Estimate at its Bandeira Project 29.5Mt @ 1.37% Li20 (13.72 Mt @
1.40% Li20 Measured + Indicated), 15.79Mt @ 1.34% Li20 Inferred) further demonstrating the
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
prospectivity of the region. A Pre Economic Assessment (PEA) demonstrated a IRR of 121% and NPV8
post tax of C$1.6 Billion (see TSXV announcement 30 November 2023).
Mining is a key driver of the economy in both Minas Gerais and Brazil. Figure 5 demonstrates the impact
that mining has had on Minas Gerais’ Industrial Production Index (IPI) in 2023. In December 2023 Minas
Gerais exported US$3.56 Billion of goods. Between December 2022 and December 2023. The exports
of Minas Gerais have increased by US$722 Million (25.5%) from US$2.84 Billion to US$3.56 Billion with
the dominant commodities being minerals (mainly iron ore and ferro alloys) and raw sugar.
Figure 5: Minas Gerais industrial grow in 2023
Source: CEIC
The Proposed Acquisition is relevant to the Company as it expands its influence into some of the world’s
premier lithium mining regions. Active exploration is key to the Company’s modus operandi and
acquisition of projects that sit within proven geological domains is an important step in working towards
a discovery. Optionality on a jurisdictional basis also provides additional opportunities and investors that
may have a preference for specific jurisdictions and their related commodities.
The Company has existing relationships within the region that can be utilised to ensure efficient
deployment of exploration teams to identify drill targets as quickly as possible.
References
Latin Resources’ (ASX: LRS) Colina project hosting 70.3Mt @ 1.27% Li20 (1.73Mt @ 1.47% Li20
Measured, 39.29 Mt @ 1.36% Li20 Indicated, 29.26Mt @1.13% Li20 Inferred)
2
Sigma Lithium’s (NASDAQ: SGML) Grota do Cirilo project hosting 108.9Mt @ 1.41% Li202 (94.3Mt @
1.40% Li20 Measured and Indicated, 14.6Mt @ 1.37% Li20 Inferred)
3
Servico Geologico do Brasil (Geological Service of Brazil):
https://rigeo.cprm.gov.br/jspui/handle/doc/17451
1
Approved for release by the Board of Directors
-ENDMore information at www.lightnmingminerals.com.au
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Securities Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s agship Dundas project is located
in the prolic Dundas region of Western Australia. The Company also owns the Dalmas and Hiver lithium projects in Quebec, Canada,
another signicant and evolving lithium region globally as well as other projects in Western Australia which include Mt Jewell, Mt Bartle
and Mailman Hill which are prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identied by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company’s
actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors
may include, but are not limited to, changes in commodity prices, foreign exchange uctuations and general economic conditions,
increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks
of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the
regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme
weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the nancial, market,
regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future. The Company
does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the
Company’s business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by
the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially
from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance,
achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the
Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements
in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock
exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of
the forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is a full-time
employee of the Company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation and types of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Persons as dened in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodland consents to the inclusion of
his name in the matters based on the information in the form and context in which it appears. Mr Woodland holds options in Lightning
Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company conrms that it is not aware of any new information or data that materially affects the information included in the original
market announcements, and that all material assumptions and technical parameters have not materially changed. The Company also
conrms that the form and context in which the Competent Person’s ndings are presented have not been materially modied from the
original market announcement.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Appendix 1: Caraíbas and Sidrônio Projects – JORC Code 2012 Table 1 Criteria
The Table below summarises the assessment and reporting criteria used for exploration results for the Caraíbas and Sidrônio Projects and reflects the guidelines in Table 1 of The
Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explana@on
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under inves;ga;on, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limi;ng the broad meaning of sampling.
Include reference to measures taken to ensure sample represen;vity and
the appropriate calibra;on of any measurement tools or systems used.
Aspects of the determina;on of mineralisa;on that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
rela;vely simple (eg ‘reverse circula;on drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explana;on may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodi;es or mineralisa;on types (eg submarine nodules) may
warrant disclosure of detailed informa;on.
Drill type (eg core, reverse circula;on, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representa;ve nature of the samples.
Whether a rela;onship exists between sample recovery and grade and
whether sample bias may have occurred due to preferen;al loss/gain
of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support a
Share your feedback
Discover