Strong Lithium Anomalism Continues at Dundas Project
Released
Released
Announcement PDF
Strong Lithium Anomalism Continues at Dundas Project
ASX Announcement
13 May 2024
Lightning Minerals (L1M or the Company) is pleased to provide an update for the Dundas South Project
and reports assay results for its recent drilling program on tenement E63/2000. The drilling program
tested lithium and rubidium targets identified through regional soil exploration work (refer ASX release
9th February). The results demonstrate a continuation of strong lithium and rubidium occurrences (up
to 994ppm lithium and 1,834 ppm rubidium at depths of up to 26m.
Highlights
•
Positive assays for the Company’s 96 hole, 3,820m Aircore drill campaign1 on tenement
E63/2000 have now been received
•
Assays have returned elevated lithium values on composite samples with peak results
of 994ppm lithium, confirming and increasing the tenor of the previously identified
anomalism
•
Results highlight three sites of interest which exhibit correlated elevations in lithium
and pathfinder elements supporting continued exploration
Strong assay results have continued at the Company’s Dundas South Project within tenement E63/2000
following completion of drilling in February 2024. Results continue to demonstrate the presence of
elevated lithium across the project area with strategies now being reviewed to identify the potential
source of the anomalous lithium values. The staged approach to exploration across the Company’s
Dundas projects continues to build confidence in lithium potential throughout the region.
Lightning Minerals Managing Director Alex Biggs said, “Drilling on E63/2000 has yielded positive
results that suggest we are potentially closing in on what might be a source of lithium mineralisation.
The staged approach we have taken: geophysics, soil sampling, infill soil sampling and now Aircore
drilling have helped us identify the areas of highest importance and we will continue to follow up on
these with further targeted drilling. It also demonstrates that this approach to exploration works, while
at the same time conserving capital and ensuring maximum value proposition for exploration
expenditure.
The Company remains committed to its exploration at its Dundas project and is excited to begin
exploration at its newly acquired Caraíbas and Sidrônio projects in Brazil’s Lithium Valley region of
Minas Gerais. It is important that we generate optionality in our exploration strategy and we now hold
projects in three of the most prospective lithium districts in the world: Minas Gerais, Brazil, Dundas,
Western Australia and Quebec, Canada. We remain excited about the Company’s project’s potential
and are supportive of the overall lithium thematic”.
1
ASX Announcement 9th February
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Drilling Results for Dundas Tenement E63/2000
During early 2023 Lightning Minerals completed a first pass reconnaissance soil geochemistry program
consisting of 1,391 soil samples at its Dundas South Project. Results within tenements E63/2000 and
E63/1993 defined a broad lithium in-soil anomaly over an approximate 2.4km x 1.0km area, including
a peak result of 218ppm lithium (Figure 1). Infill sampling was then completed to further define
anomalism and to delineate drill targets through the shallow regolith and alluvial cover present in the
area. The positive results of the infill program were sufficient to support the continuation of exploration
activities through Aircore drilling.
Figure 1: Dundas South tenement E63/2000 and E63/1993 showing UFF+ lithium soil geochemistry
results and recent Aircore drill collar locations (white)
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
The maiden drill program within E63/2000 was then completed in February 2024 and assays have
now been received for all samples submitted for laboratory analysis. Results show three sites of
interest, these exhibit broadly correlated elevations in pathfinder elements within highly weathered
saprolites. Two of the three sites (Drill Traverse 4 and 6, Figure 2) are located on the eastern extents
of east west orientated drill lines and will require follow up exploration to continue vectoring toward
any potential lithium mineral system that may be responsible for the elevated results.
Samples were collected from all holes using a 4m composite sampling technique from surface. The
samples were then submitted to Nagrom laboratories for a full suite of exploration stage low level
elemental analysis. Lithological logging via suitably qualified contract geologists reported a range of
end of hole (EOH) rock types including mafic volcanics, granites, and metasediments, with some holes
ending at hard undifferentiated saprock/saprolite boundaries.
Two drillholes (DSAC0140 and DSAC0151) intersected albite-quartz-muscovite pegmatites. This
supports the thesis that pegmatite producing hydrothermal systems are present and may support
lithium enrichment if the genetic lithological conditions are correct. Due to the pegmatite intersection,
drillhole DSAC0151 was sampled at 1m intervals. Potassium to rubidium ratios (K/Rb) are
encouraging for this intersection as they may indicate that pegmatites in this location have
experienced fractionation.
Figure 2: Peak downhole lithium result plan for composite samples within E63/2000 Aircore program.
(Background lithium heatmap derived from UFF+ lithium soil geochemistry results)
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Peak results for elements considered as potential pathfinders for the target commodity include
125ppm beryllium, 115ppm caesium, 35ppm tin, and 38ppm tantalum. A full list of results for
drillholes in the located in the three areas of elevated lithium results with values greater than 100ppm
are shown in Appendix 1 Table 2. Geological cross sections for the three sites are presented in Figure
5.
The peak lithium result of 994ppm lithium occurs within a 2m composite sample at EOH in drillhole
DSAC0227 (Figure 4). The lithology for this sample is described as highly weather mafic saprock (2425m), followed by moderately weathered, fine grained mafic basalt (25-26m EOH). A lithium response
of this magnitude is unusual for this lithology without the presence of an underlying modifying factor,
investigating this will form part of the next stage of works. Resampling of DSAC0227 to a 1m downhole
resolution will now be undertaken to provide further confidence in the identified area of interest.
Drill sections for each of the three areas of interest are shown in Figures 3 to 5. A full list of results for
drillholes displayed in Figures 3 to 5 are shown in Appendix 1 Table 2. In cross sections ‘C-D’ and ‘EF’ it is noted that a gradual increase in the tenor of results occurs as drilling moves toward the east.
Exploration will focus on areas located immediately east of drillholes DSAC0227 and DSAC0151 and
may require follow up exploration to determine the potential of a lithium mineral system.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 3: Cross Section A-B showing composite downhole lithium and rubidium intercepts
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 4: Cross Section C-D showing composite downhole lithium and rubidium intercepts
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Figure 5: Cross Section E-F showing composite downhole lithium and rubidium intercepts
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Dundas Project (Lightning Minerals 100%)
The Dundas Project area is located near Norseman in Western Australia and comprises eight tenements
totalling approximately 454km2. Norseman has a strong history of mining dating back to 1892 and is located
190km south of Kalgoorlie. Historically, Norseman and the Dundas area has experienced mining in gold and
nickel although over recent years the region has become an emerging lithium and critical minerals province
with multiple discoveries and significant exploration activity.
There are two project areas at Dundas:
a) South/western tenements surrounding Liontown Resources’ Buldania/Anna lithium deposit, and,
b) North/eastern tenements approximately 30km to the east of Alliance Mineral Assets’ Bald Hill lithiumtantalum mine.
Figure 6: Location of Lightning Minerals’ projects
Approved for release by the Board of Directors
-ENDMore information at www.lightnmingminerals.com.au
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Securities Exchange (ASX:L1M) and focused on
the exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas
project is located in the prolific Dundas region of Western Australia. The Company also owns the Dalmas and Hiver lithium
projects in Quebec, Canada, another significant and evolving lithium region globally as well as other projects in Western
Australia which include Mt Jewell, Mt Bartle and Mailman Hill which are prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs
or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration
and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades
of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the
future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel,
industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is
a full-time employee of the Company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation
and types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Level 6 505 Little Collins St Melbourne VIC 3000 Australia | admin@lightningminerals.com.au | (08) 9429 8806
Appendix 1: Dundas – JORC Code 2012 Table 1 Criteria
The Table below summarises the assessment and reporting criteria used for exploration results for the Dundas Exploration Project and reflects the guidelines in Table 1 of The Australasian Code
for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Drilling techniques
Drill sample recovery
Logging
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Aircore (AC) drilling samples are collected at 1m intervals from the beginning to the end of each AC hole. Drill sample piles
are placed in an orderly fashion on the drill site pad. When impenetrable lithologies are intersected a 90mm hammer is
used to re-enter the hole to continue drilling. When the hammer is used, a 2-3kg samples are taken from a cone splitting
device to provide drill sample for laboratory analysis.
Composite sampling of the Aircore samples are collected with a tube spear at 4m composite sample intervals to an
approximate weight of 2-3kg.
Samples submitted to the analytical laboratory are at the discretion of the representative geologist.
Sample quality was supervised with no material sample loss or excess moisture recorded.
Sampling was carried out using Lightning Minerals procedures and QAQC processes as per current industry standard
practice.
Drillhole collars are located using a Garmin Map 62s handheld device.
AC drilling used an aircore blade drill bit of 90mm diameter, collecting samples at 1m intervals, with the drill sample
being placed onto the drill site pad. When impenetrable lithologies are intersected by the rotation blade bit, a 90mm
percussion hammer is used to re-enter the hole to continue drilling.
Sample quality and % recoveries are recorded as a visual estimate percentage as part of the field drill rig geologist’s rig
data capture template.
Recoveries remained relatively consistent throughout the program, little water was intersected downhole.
Care was taken to ensure calico samples were of consistent volume and weight.
Samples are representative of the drilled intervals.
All drillholes are geologically domain logged by suitably experienced and qualified geologists.
Logging is both quantitative and qualitative in nature, including lithology, mineralisation, mineralogy, weathering, and
colour. Logging is of a standard able support future resource studies should they be required.
A representative washed chip sample for each end of hole interval as placed in a chip tray for future reference.
Photographs are taken of chip trays for each drillhole and stored on L1M company servers.
The field lithological logging and subsequent reporting of pegmatites are not indicative of economic pegmatite hosted
mineralisation. Further exploration work including an assessment of the current drill sampling results and follow up
drilling and sampling will be required to confirm the presence of any mineralisation.
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
4m composite spear sampling is undertaken on each aircore drillhole, this method is considered appropriate given the early
stage of exploration works.
DSAC0151 was sampled at 1m intervals due to the presence of a pegmatite unit.
All reported samples are analysed at Nagrom Laboratories, samples are dried to 105C°, crushed to nominal top-size of
6.5mm in a Terminator Jaw crusher using method CRU01. Pulverised up to 3 kg in a LM5 pulveriser mill at 80% or better
passing 75μm, using method PUL01. If the sample is greater than 3 kg, the sample is dried, and split with rotary splitter
before analysis.
Industry standard QAQC practices of duplicate and blank sampling, and the appropriate use of Certified Reference Material
for LCT pegmatite mineralisation are used for all laboratory sample submissions. CRM’s are utilised by the company at a
rate of 1:25 samples.
Samples, including QA/QC samples, have been processed by Nagrom Perth, Perth Western Australia.
Methods utilised for laboratory analysis are ICP003, ICP003_OES, and ICP003_MS. Review of QA/QC, including blanks, field
duplicates, high-grade and low-grade CRM’s has been completed with no issues interpreted from results. All sampling has
rigorous QAQC in terms of reference sampling as well as blank and standards introduced into the sample stream.
Prepared sample is digested with a mixture of acids and boiled to dryness. Residue is leached and the resultant solution is
analysed by ICP. This method is a near total digestion, most mineral species will be decomposed under these conditions.
The CP independently verified drilling, sampling, assay and logging results from a validated, externally maintained and
stored geological database.
No adjustments to assay data have been performed. The CP has verified the drill collar, assay and assay QAQC data.
Handheld Garmin GPS instruments were used to geo locate each drill collar, these instruments are understood to be
accurate within a nominal ±5m in the horizontal and vertical planes.
The level of topographic control offered by a handheld GPS is considered sufficient for early exploration drilling.
All samples were collected in the Geocentric Datum of Australia 1994 (GDA94) system. (MGA94, Zone 51)
The drillhole spacing is considered appropriate for the reporting of the exploration results.
No Mineral Resource or Ore Reserve Estimates have been completed.
One-metre downhole AC drill chip samples were composited to 4m via tube spear and prepared for sample submission.
The drilling of soil geochemical targets was targeted as best possible at this early stage of exploration activities.
Sample security
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
•
The chain of custody for sampling procedures and sample analysis was managed by the rig geologists during drilling.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
No audits or reviews of sampling techniques have been conducted to date.
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
Commentary
•
•
•
•
•
•
•
•
Geology
Deposit type, geological setting and style of mineralisation.
•
•
•
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
down hole length and interception depth,
o
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
•
•
The Dundas Projects are located ~600km east of Perth and 20 to 50 km ENE of Norseman in Western Australia.
The Dundas Project area totals ~450km2 and comprises eight granted exploration licences separated into two exploration
areas – Dundas North (E28/3027 and E28/3028) and Dundas South (E15/1748, E63/1932, E63/1993, E63/2000, E63/2001,
and E63/2028)
The Tenements are covered by the Ngadju Determined Native Title Claim (WCD2014/004). An agreement is in Place
between the Ngadju Native Title Aboriginal Corporation RNTBC and Lightning Minerals.
The Tenements are considered in good standing at the time of this report.
The Dundas South Project area has been explored predominantly for gold and nickel by various prior parties.
More recent exploration has included a focus on Lithium via explorers such as Matsa Resources (2008-2018), West
Resource Ventures (2018 – 2019), and Liontown Resources (2018-2020).
The result of this work is described in numerous publicly available Geological Society of Western Australia publications.
Review of the considerable historic exploration activities has been completed; data is collated into company databases as
per industry standard data collection practice.
No known mineral deposits occur within project tenure.
The mineralisation style related to this release are metals related to lithium-caesium-tantalum (LCT) pegmatites intrusives.
There are publicly reported occurrences of LCT pegmatites within an acceptable proximity to the Dundas Project
exploration tenure. (Liontown Resources (ASX:LTR) – Buldania Deposit)
The Dundas Project is located at the southern-eastern end of the Norseman-Wiluna Belt within the Archaean Yilgarn
Craton. The project area sits adjacent to the Jerdacuttup Fault which represents the boundary or the Archaean Yilgarn
Craton with the adjacent Proterozoic Albany-Fraser Province.
Relevant drill hole information has been provided in Appendix 1 of this release
No material information has been excluded from this report, laboratory analytical results have been adequately
communicated and described within the body of this report.
Data aggregation
methods
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
These relationships are particularly important in the reporting of Exploration
Results. If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported. If it is not known and only the
down hole lengths are reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
•
•
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-