Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
30 October 2023
QUARTERLY ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 SEPTEMBER 2023
Lightning Minerals (“L1M” or “the Company”) is pleased to report its Quarterly Activities Report for the
quarter ending 30 September 2023.
HIGHLIGHTS
ASX: L1M
o
Binding Agreement signed to acquire Dalmas and Hiver
lithium Projects in James Bay, Quebec (Canada)
o
Multispectral analysis has identified multiple pegmatite
target areas at the Dalmas and Hiver Projects
o
165 discreet signatures that form seven exploration target
areas identified. Target areas up to 2.7km in length at
Dalmas and 2.1km in length at Hiver
o
Completion of drilling at Dundas project on tenement
E63/2001
o
Infill soil sampling started at Dundas tenement
E63/2000 to define drill targets and following up on
218ppm lithium in soil anomaly
o
Chief Executive Officer Alex Biggs has been promoted
to position of Managing Director
Shares on Issue
48,457,170
Performance Rights
4,800,000
Unlisted Options
Outstanding
10,200,000 (exercisable at A$0.25)
80,000 (exercisable at A$0.30)
110,000 (exercisable at A$0.40)
140,000 (exercisable at A$0.50)
Listed Options Outstanding
26,728,543 (exercisable at A$0.25)
Cash Position
A$3.51 Million
(at 30 September 23)
Lightning Minerals Managing Director Alex Biggs said, “The September Quarter has provided
significant progress for the Company as we continue to refine our exploration strategy at our Dundas
Project in Western Australia. Completion of our phase 1 drilling has allowed us to refine our exploration
strategy with focus now on defining drill targets on tenement E63/2000. It is also a great success to sign
a binding agreement for the Dalmas and Hiver Projects in James Bay, Quebec. This provides a
significant increase in exposure to lithium potential in one of the premier lithium regions globally. The
Company now holds highly prospective tenements with exposure to the green energy thematic in both
Australia and Canada”.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
OPERATIONAL ACTIVITIES
DUNDAS PROJECT OVERVIEW (100% L1M)
Drilling at the Company’s Dundas project continued during the Quarter focusing on tenement
E63/2001. Multiple pegmatites were intersected during the campaign both through Aircore and RC
drilling. Assays returned anomalous lithium results which has provided further opportunity to assess
the potential source of mineralisation on tenement E63/2001. Infill soil sampling began on tenement
E63/2001 with a view to identify drill targets for upcoming drilling. Initial soil sampling identified a
lithium in soil anomaly of 8km2 up to 218ppm lithium (ASX Announcement 23 March 2023).
EXPLORATION UPDATE FOR DUNDAS PROJECT
(ASX ANNOUNCEMENT 29 SEPTEMBER 2023)
and
FURTHER PEGMATITE INTERSECTIONS AT DUNDAS PROJECT
(ASX ANNOUNCEMENT 01 SEPTEMBER 2023)
and
RC DRILLING BEGINS ON LITHIUM TARGETS AT DUNDAS SOUTH PROJECT
(ASX ANNOUNCEMENT 14 AUGUST 2023)
o Discrete pegmatite intersections between 52m to 93m downhole in drill hole DSRC0029
o Multiple pegmatite intersections encountered across tenement E63/2001 through Aircore and
RC drilling
o No significant lithium-Caesium-tantalum (LCT) results reported at this stage but subject to
potential further evaluation and future exploration
EXPLORATION SUMMARY FOR DUNDAS SOUTH TENEMENT E63/2001
The maiden drill program at the Dundas South Project has been successful in locating a felsic
pegmatitic hydrothermal system within E63/2001. Assays have now been received for all pegmatite
samples submitted for laboratory analysis.
Results for lithium-caesium-tantalum are subdued overall. Some minor but non-material elevations in
caesium, tantalum and tin are present in drill hole DSRC0029. These may form the basis of further
review which may determine future exploration activities within tenement E63/2001. Evaluation of
results is currently underway to determine a relevant strategy for targeting potential LCT pegmatite
bodies concealed under salt lakes to the north-west of the completed drilling. This area falls within the
prospective Mt Kirk mafic geological unit that transects the tenement in a north-north-west
orientation.
The geological thesis for exploration within E63/2001 was that concealed LCT pegmatites may generate
a sufficient geochemical signature through the transported cover above to cause a geochemical
response in the soil. Previous exploration works by the Company utilising soil geochemistry identified
lithium-rubidium in-soil anomalies, these broadly coincide with the location of the pegmatites
uncovered during recent drilling (ASX Announcement 23 January 2023). Additionally, geophysical
targets interpreted from aeromagnetic interpretations further warranted drill testing and formed the
basis for drill targeting.
Future exploration in this area will continue to search for pegmatites of a similar fractionated
state/mineralised phase to those present at Liontown Resources’ (ASX: LTR) Buldania/Anna lithium
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
deposit to the north. The discovery of the unmineralised pegmatite bodies under cover, at the scale
they have been intersected downhole, is considered a positive indicator for the prospectivity for the
tenement. Other areas with similar transported cover within the tenement may also host similar
pegmatitic hydrothermal fluid systems without surficial expression, but within a geochemical setting
more aligned with the nucleation of lithium bearing minerals.
Figure 1: Geological cross section ‘A’ - interpreted pegmatite after intersections in holes DSAC0031-DSAC0034,
and DSRC0029 and DSRC0030
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 2: Drill location map showing RC drill areas and intersected pegmatite locations
INFILL SOIL SAMPLING BEGINS ON LITHIUM TARGETS AT DUNDAS SOUTH PROJECT TENEMENTS
E63/2000 AND E63/1993
(ASX ANNOUNCEMENT 02 AUGUST 2023)
o
Follow up infill soil sampling designed to follow up on successful geochemical
results that identified 8km2 lithium in soil anomaly up to 218ppm lithium (ASX
Announcement 23 March 2023)
o
1500 samples are planned, which will increase the sampling density to approximately
200m x 200m, and to 100m x 100m over higher priority areas
o
UFF+ Analysis techniques to be employed with 62 elements to be assayed for
INFILL SOIL SAMPLING STRATEGY
The strategy for soil sampling is to infill the current areas of interest which were initially sampled on
400m x 400m centres. The planned infill soil sampling is shown in Figure 3 with the aim to provide a
more targeted area for start of drilling as the current area of interest is large at 8km2.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Sampling will be reduced to 100m x 100m centres over the highest levels of anomalism. This will provide
the company with a higher resolution of results which will feed directly into follow up exploration
drilling. Within the broader zones of anomalism, sample spacing will expand to 200m x 200m to assist
in delineating drill targets.
It is important to provide a hierarchy of drill targets to increase the chance of drilling success particularly
as the tenements have a degree of alluvial cover. This is seen as an opportunity as demonstrated by the
Company’s recent successful drilling on tenement E63/2001 where multiple pegmatites have been
intersected under alluvial cover (ASX announcement 13 July 2023). Further infill sampling is proposed
and being assessed on the Company’s other Dundas tenements with the plan to delineate multiple
high-quality drill targets.
PREVIOUS GEOCHEMICAL RESULTS ON TENEMENTS E63/2000 AND E63/1993
Previous geochemical results for tenements E63/2000 and E63/1993 (ASX announcement 23 March
2023) identified a broad, moderate to high tenor lithium-in-soil geochemical anomaly over an
approximate 3.5km x 2.4km area with assays up to 218ppm lithium as shown in Figure 4.
The broad and consistent tenor of the anomalism is considered a positive indicator given the resolution
of the sampling grid at 400m centres. Within the greater anomalous zone five samples have returned
lithium values of over 150ppm lithium, with a peak result of 218ppm lithium. These sites occur within a
clustered zone near the centre of the anomaly, thus indicating that a closer spaced soil sampling
program is required to identify a starting point for exploration drilling.
The underlying bedrock geology consists of ultramafic and mafic volcanics hosted within a felsic
granitic pluton as recorded in state interpreted geological datasets. Locally there appear to be multiple
phases or ‘pulses’ of granitic intrusive events as evidenced by the unique geophysical signature of each
‘pulse’. Dependent on the timing and geochemistry these various pulses may have experienced the
right conditions to emplace LCT pegmatites in the surrounding host rocks.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 3: Planned infill soil sampling campaign on tenements E63/2000 and E63/1993
Figure 4: Lithium in soil geochemical results within E63/2000 and E63/1993, shown on Analytic Signal
Total Magnetic Intensity geophysical image
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
JAMES BAY, CANADA PROJECT OVERVIEW – DALMAS AND HIVER (100%L1M)
The Company entered into a Binding Letter of Intent on 11 August 2023 to purchase 100% interest
in two projects in the James Bay region of Quebec, Canada. The acquisition was completed on 16
October 2023.
James Bay is a prolific emerging lithium province which hosts multiple large scale lithium projects
including Allkem’s (ASX: AKE) James Bay lithium project with 40.3Mt @ 1.4% Li20 Indicated
resource1, Nemaska Lithium’s (TSX: NMX) Whabouchi lithium project with 55.7Mt @ 1.4% Li202
consisting of 38.5Mt @ 1.45% Li20 Measured and Indicated and 17.2Mt @ 1.29% Li20 Inferred, Critical
Elements’ (TSX.V: CRE) Rose lithium project with 34.2Mt @ 0.9% Li203 consisting of 31.5Mt @ 0.91%
Li20 Indicated and 2.7Mt @ 0.77% Li20 Inferred and Sayona Mining’s (ASX: SYA) Moblan lithium
project with 51.4Mt @ 1.3% Li204 Measured, Indicated and Inferred. The region is also home to Patriot
Battery Metals’ (ASX: PMT) Corvette lithium Project consisting of 109.2Mt @ 1.42% Li205 Inferred,
currently the largest hard rock lithium deposit in the Americas and Winsome Resources’ (ASX:
WR1)6 who are exploring multiple lithium exploration projects in the region.
Figure 5: Dalmas and Hiver project locations, James Bay, Quebec
1Allkem’s ASX Announcement 21 December 2021, 2Nemaska Lithium’s TSX Announcement 09 August 2019
3Critical Element’s TSX.V Announcement 27 July 2022, 4Sayona Mining’s ASX Announcement 17 April 2023
5Patriot Battery Metals (PMT) ASX Announcement 31 July 2023, 6Winsome Resources (WR1) ASX Announcement 01 August 2023
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
BINDING LETTER OF INTENT SIGNED FOR JAMES BAY LITHIUM PROJECTS
(ASX ANNOUNCEMENT 11 AUGUST 2023)
o
Binding LOI entered into to acquire the Dalmas Project (47km2) and Hiver Project (32km2) in
the prolific lithium region of James Bay, Quebec, Canada
o
Both projects have historical reports of outcropping pegmatites as mapped by Québec's
Ministry of Natural Resources and Forests (MERN). Ground reconnaissance is to begin
immediately post deal completion
o
This adds to the Company’s exciting flagship Dundas Project in Western Australia
DALMAS PROJECT
The Dalmas Project is located in the James Bay region of Quebec approximately 150km to the east of
Patriot Battery Metals’ (ASX: PMT) Corvette lithium Project and 45km to the east of Winsome Resources’
(ASX: WR1) Adina lithium Project. The project area consists of felsic intrusive lithologies which are
juxtaposed against greenstone and metasedimentary units. This geological setting is considered
favorable to host pegmatite emplacement and potential for lithium-caesium-tantalum (LCT)
mineralisation. The project covers an area of 47km2.
Very limited exploration has occurred within the tenement boundaries with 13 sites with geological
observations being recorded. Of these, 9 have been described as ‘pegmatitic’. All reported pegmatite
outcrops will be investigated during early exploration activities with an emphasis on ground truthing
the reported pegmatitic lithologies. The remaining four outcrop locations with historical mapping will
also be investigated, as three of these have site interpretations that include a coarse grained description.
Figure 6: Dalmas Project geological lithologies and identified pegmatites
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
HIVER PROJECT
The Hiver Project is also located in the James Bay region of Quebec and covers an area of 32km2 and is
located approximately 4km from the Trans-Taiga Road highway. The project is adjacent to Megado
Resources’ (ASX: MEG) Cyclone lithium Project and in the proximity of multiple lithium exploration
opportunities. The project demonstrates an interpreted folded and faulted extensions of greenstone
lithology (Aquilon Group) against granites of the Tramont Suite, thus it is thought to provide a
geologically favorable host environment for potential hard rock LCT pegmatite style mineralisation.
The project also has one historical outcrop mapping location, recorded by Québec's Ministry of Natural
Resources and Forests (MERN) which describes a ‘pegmatitic lithology’ in the north of the tenement
(Figure 7). It is the opinion of the Company that the greenstone extension holds the most prospectivity
for hosting potential lithium bearing pegmatites based on other projects in the surrounding area.
Historic mapping of the area is sparse in nature, with one outcrop being described as a pegmatitic
intrusion.
Figure 7: Hiver Project geological lithologies and identified pegmatites
REGIONAL GEOLOGY OVERVIEW
The Dalmas and Hiver Projects are thought to hold considerable potential for LCT style mineralised
systems due to the underlying geological conditions present at each location. The James Bay region of
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Quebec is becoming synonymous with a favorable regional geological setting for hard rock LCT style
lithium mineralisation.
Multiple projects are experiencing exploration success in the region where greenstone lithologies,
proximal to tonalites and other intrusive felsic lithologies, are host to large lithium bearing pegmatite
systems as reported by other ASX listed entities who are exploring within the area7,8.
Both the Dalmas and Hiver Projects display similar characteristics, and in conjunction with the
observed pegmatitic lithologies across both projects, the company believes that prospectivity warrants
acquisition.
The geological maps of the Dalmas and Hiver Projects (Figure 6 and 7 respectively) were compiled with
data from the geological database of Québec's Ministry of Natural Resources and Forests (MERN). All
geological information presented in this announcement can be accessed through the Quebec
Government SIGÉOM database or through the noted references.
QUEBEC, CANADA – ONE OF THE WORLD’S LEADING LITHIUM REGIONS
The Quebec government is actively investing in the lithium sector including exploration grants as well
as funding development of infrastructure. Canada’s federal government and the Quebec government
announced in May 2023 that it will each provide C$150 million for a General Motors-POSCO Chemical
battery materials facility that is expected to create about 200 jobs. The facility will be built in Becancour,
Quebec, to produce cathode active material for electric vehicle batteries. Ford recently agreed an
offtake agreement with Nemaska Lithium to purchase up to 13,000 tons per annum of lithium
hydroxide further demonstrating the move by manufactures into both Quebec and Canada as a whole.
Canada is aggressively pursuing the lithium industry from both mining and downstream
manufacturing perspectives with a view to establishing an end-to-end electric vehicle supply chain.
The state of Ontario has successfully attracted Tesla, Volkswagen, Stellantis, LG Energy Solutions and
Unimore to manufacture battery cells, battery components and electric vehicle parts.
Due to Canada’s proximity to the United States and abundance of lithium it is crucially important to be
manufacturing in the United States. There are multiple significant lithium resources that are yet to be
developed and current production is small. However, the current levels of investment in the lithium
sector and continued support from the Canadian government will likely see Canada become one of
the world’s top lithium producers over the next decade.
ACQUISITION TERMS
The Company was granted an exclusivity period of 60 days, at a cost of A$30,000, commencing 10
August 2023 during which time it undertook due diligence on the projects. Subsequent to end of
Quarter the Company satisfied its due diligence and entered into a binding sale agreement for the
Dalmas and Hiver projects (ASX Announcement 27 September 2023) and the Company completed the
acquisition on 16 October 2023.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Consideration to Vendor or its Nominees
• Paid A$250,000 in cash
• 1,406,864 ordinary shares in the Company (escrowed for 12-months) at $0.177 per share issue price,
issued on 16 October 2023 without prior shareholder approval utilising the Company’s current 15%
placement capacity under ASX Listing Rule 7.1 (Consideration Shares).
• Grant 2.0% Net Smelter Royalty, of which 1.0% may be bought back by the Company at any time for
A$1.0 million. The NSR is applicable across both projects.
Milestone payments (Milestone Shares) will be made as follows:
Milestone 1: A$300,000 of ordinary shares in the Company based on five (5) rock chip samples of >1.0%
Li20. Samples are to be no less than 50m from nearest sample grading >1.0% Li20 to be considered as
contributing to milestone. Samples may be taken from either project with 5 samples not necessarily
required from one specific project. Milestone can be achieved from either project.
Milestone 2: A$400,000 of ordinary shares in the Company based on either a 5m channel sample or
drill intercept of >5m true width grading at >1.0% Li20. Milestone can be achieved from either project.
Milestone 3: A$500,000 of ordinary shares in the Company based on JORC or 43-101 compliant
Resource estimate of not less than 5.0Mt containing not less than 50,000t of Li20 or equivalent in the
Inferred, indicated or Measured category using a cut-off of not less than 0.40% Li20 and to be calculated
in accordance with Section 50 of the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves – The JORC Code). Milestone can be achieved from either
Project.
All milestone share quantities are to be calculated using the VWAP over the fifteen twenty (1520)
consecutive trading days on which the Company’s securities have actually traded prior to the relevant
announcement for achievement of the specific Milestone on the ASX subject to a floor price or
minimum issue price of $0.0925 (9.25 cents) per share.
MULTIPLE TARGETS IDENTIFIED AT JAMES BAY LITHIUM PROJECTS
(ASX ANNOUNCEMENT 30 AUGUST 2023)
o
Multispectral analysis (Sentinel 2 and ASTER satellites) has identified multiple
pegmatite target areas at the Dalmas and Hiver Projects
o
165 discreet signatures that form seven exploration target areas identified across
both projects. Target areas up to 2.7km in length at Dalmas and 2.1km in length at
Hiver
o
Results form the basis of phase 1 sampling, ground truthing and reconnaissance
which is planned to begin post deal completion
Multispectral data covering the Dalmas and Hiver Projects has been interrogated with analysis of both
Sentinel 2 and ASTER satellite data completed. Multiple areas of interest have now been identified with
a total of 165 discreet multispectral targets for follow up field investigation. The identified target areas
extend up to 2.7km in strike on the Dalmas Project and 2.1km on the Hiver Project.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
The Dalmas Project area exhibits 113 potential targets, the remaining 52 targets occur within the Hiver
Project tenure. The majority of multispectral targets appear to occur in four clustered areas at Dalmas,
and three at Hiver. Identifying these target areas is a crucial step in defining a phase 1 work program
consisting of rock chip sampling and ground reconnaissance which will focus on the potential
identification of lithium bearing pegmatites. Phase 1 works are planned to begin immediately following
satisfaction of due diligence and deal completion.
DALMAS PROJECT - TARGET GENERATION
The Dalmas Project is located in the James Bay region of Quebec approximately 150km to the east of
Patriot Battery Metals’ (ASX: PMT) Corvette lithium project and 45km to the east of Winsome Resources’
(ASX: WR1) Adina lithium project. Within the Dalmas Project area 113 discreet multispectral signatures
have been identified, which broadly form four clustered areas for follow up investigation (Figures 8 and
9). These signatures have the potential to represent lithium-caesium-tantalum (LCT) pegmatites. Field
verification will be conducted during the phase 1 work program phase.
Figure 8: Dalmas project with identified multispectral pegmatite targets (red outlines) on Sentinel 2
composite image
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 9: Dalmas project with identified multispectral pegmatite targets (red outlines) on Sentinel 2
composite image and 1:2,000,000 QGS interpreted bedrock geology
The Dalmas project geology is interpreted by Quebec Geological Survey (QGS) at a 1:2,000,000 scale,
this can be summarised at a project scale as felsic intrusive lithologies (granite/tonalites) juxtaposed
against greenstone and metasedimentary units. The Quebec Geological Survey historic outcrop
mapping information is also displayed in Figure 9, with previously mapped outcropping pegmatitic
lithologies occur at three of the four priority areas. These sites will be visited as a priority during the
phase 1 work program for verification. The prospect scale relationship between the geological setting,
the QGS mapped pegmatitic outcrops and the potential for LCT pegmatite mineralisation will be a
focus for field investigations.
HIVER PROJECT MULTISPECTRAL ANALYSIS
The Hiver Project is also located in the James Bay region of Quebec, covers an area of 32km2 and is
located approximately 4km from the Trans-Taiga Road highway. The Project is adjacent to Megado
Resources’ (ASX: MEG) Cyclone lithium project and in the proximity of multiple lithium exploration
opportunities. The Hiver project contains 52 discreet potential pegmatite signatures have been
identified, which broadly form three clustered areas for follow up investigation (Figures 10 and 11).
Quebec Geological Survey historic outcrop mapping information is also displayed in Figure 7. Previously
mapped outcropping pegmatite lithologies occur at one of the three priority areas.
The Hiver Project geology is interpreted to consist of folded and faulted extensions of greenstone
lithologies (Aquilon Group) against granites of the Tramont Suite. At this early stage of exploration, and
similar to the Dalmas Project the relationship between the geological setting, the historic QGS mapped
pegmatitic outcrops and the potential for economic LCT pegmatite mineralisation will be a focus for
field investigations.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 10 and 11: Dalmas project with identified pegmatite targets (red outlines) on Sentinel 2 composite
image; and 1:2,000,000 QGS interpreted bedrock geology
SATELLITE MULTISPECTRAL ANALYSIS
Multispectral analysis can be used as a mineral exploration tool by accessing data collected by
specialised satellites. These satellites have instrumentation capable of measuring the spectral response
of outcropping lithologies at the surface of the earth. The data collected can be used to aid early
regional scale exploration by focusing early exploration efforts on areas that are more likely to have the
right geological conditions to support the target exploration commodity.
Both ASTER and Sentinel-2 multispectral data covering the Dalmas and Hiver projects has been utilised
to generate the target areas presented herein. These satellites collect thermal infrared, visible nearinfrared, and shortwave infrared data which has been processed following industry leading techniques8.
These methods have been developed to target outcropping LCT pegmatites at other project areas, the
learnings are then applied elsewhere for image and target generation.
For the purpose of targeting at the Dalmas and Hiver Projects the spectral signature of the known
outcropping lithium pegmatites at Winsome Resources’ (ASX: WR1) Adina and Jamar projects were
measured. The spectral response signature over known outcropping LCT pegmatite areas was used as
an analogue to aid exploration by identifying similar targets within the Project areas. The Adina and
Jamar projects can reasonably be considered to have desirable outcropping lithologies that are
appropriate analogues for targeting at the Dalmas and Hiver projects.
ROCK CHIP SAMPLING AND RECONNAISSANCE PROGRAM
Subject to the end of Quarter a phase 1 exploration program which will include rock chip sampling,
ground truthing and reconnaissance has been planned to begin mid-October 2023 with field support
from Québec based geological contractors.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
MT JEWELL PROJECT (100% L1M)
Review and interpretation of existing drilling data has been completed during the period and is
ongoing subsequent to end of quarter including a geophysical review of potential drill targets. POW
applications have been approved by The Department of Mines, Industry Regulation and Safety (DMIRS).
Heritage agreements have been executed.
MAILMAN HILL PROJECT (100% L1M)
Data review and interpretation of existing drilling data has been completed during the period and is
ongoing subsequent to end of quarter to determine potential for an inaugural drill campaign in early
2024 targeting gold mineralisation and potential extensions to Cavalier Resources (ASX: CVR) Crawford
project. POW applications have been approved by The Department of Mines, Industry Regulation and
Safety (DMIRS). Heritage agreements have been executed.
MT BARTLE PROJECT (100% L1M)
Application for the Mt Bartle tenements is still pending. Data review and analysis is ongoing and
continues subsequent to the end of quarter. Discussions regarding execution of heritage agreements
are still ongoing.
CURRENT WORK PROGRAMS
Drilling on the Company’s Dundas E63/2001 were completed during the quarter with infill soil sampling
on Dundas tenements E63/2000 and E63/1993 ongoing subsequent to end of Quarter. Planning is
underway for drilling on tenements E63/2000 and E63/1993 and planning is also underway for phase 1
exploration works at the Company’s newly acquired Hiver and Dalmas projects to begin in October
2023.
PERMITTING, HERITAGE AGREEMENTS AND POW APPLICATIONS
A summary of POW applications and status is shown in Table 1 as at 30 September 2023.
Table 1: Current POW applications with Department of Mines, Industry Regulation and Safety (DMIRS)
Project
Tenement
Drill type
Approved
Dundas Sth
E63/2001
RC
Yes
Dundas Sth
E63/2001
AC
Yes
Mt Jewell
E27/566
DD
Yes
MM Hill
E37/1408
RC
Yes
Dundas Sth
E63/2000
Auger
Yes
Dundas Sth
E63/2000 and E63/1993
AC
Yes
Dundas Sth
E63/2000 and E63/1993
DD + RC
Pending
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 12: Lightning Minerals’ project tenement summary
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
Figure 13: Location of Dundas project tenements
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au
OTHER RELEVANT ANNOUNCEMENTS DURING THE QUARTER
BOARD CHANGES
(ASX ANNOUNCEMENT 28 SEPTEMBER 2023)
The Company announced the appointment of Chief Executive Officer, Alex Biggs to the position of
Managing Director. Upon his appointment as Managing Director Mr. Biggs remuneration has increased
from $220,000 plus superannuation to $250,000 plus superannuation.
In addition, and subject to shareholder approval, he will be issued the below securities in the Company:
a) 250,000 Options with an exercise price of 25 cents per option expiring 27 September 2027 and vesting
upon issue
b) 250,000 Performance Rights which vest and become exercisable (convert to shares) on the
Company’s shares achieving a volume weighted average price per share of at least 50 cents over any
20 consecutive trading days on which the shares have actually traded on ASX
c) 500,000 Performance Rights which vest and become exercisable (convert to shares) on the
Com