Follow Up RC Drilling Targeting Pegmatites at Dundas
Released
Released
Announcement PDF
ASX Announcement
08 August 2023
FOLLOW UP RC DRILLING TARGETING PEGMATITES TO BEGIN
AT DUNDAS
Lightning Minerals (L1M or the Company) is pleased to report that its maiden Aircore (AC) drill program
has been completed at its 100% owned Dundas project in Western Australia. A follow up Reverse
Circulation (RC) program will begin over the next few days to follow up on pegmatite intersections on
tenement E63/2001. Further pegmatite intersections have also been encountered under alluvial cover.
These results represent early-stage exploration success demonstrating increased potential which will
be further developed through the upcoming RC drill program.
HIGHLIGHTS
o
The Company’s maiden Aircore drilling program has been completed and follow up
RC program targeting previously intersected pegmatites is now planned
o
New pegmatite intersections have also been encountered under alluvial cover as
follows:
o
o
o
o
o
17m in Hole DSAC0071, with end of hole (EOH) ending in pegmatite from 30m to 47m
5m in Hole DSAC0069, from 67m to 72m
3m in Hole DSAC0105, from 24m to 27m
3m in Hole DSAC01024, with EOH ending in pegmatite from 21m to 24m
Previous pegmatite intersections1 encountered under alluvial cover as follows:
o
o
o
o
o
20m in Hole DSAC0033, with end of hole (EOH) ending in pegmatite from 31m to 51m
12m in Hole DSAC0006, with EOH ending in pegmatite from 9m to 21m
11m in Hole DSAC0010, from 34m to 45m downhole
9m in Hole DSAC0034 with EOH ending in pegmatite from 22m to 31m
7m in Hole DSAC0012, from 9m to 16m downhole
Additional RC drilling of approximately 1,000m has been designed to target pegmatites intersected
during the Company’s maiden Aircore drill campaign. This is scheduled to begin by mid-August. The
principal purpose of the RC follow-up drilling is to further understand the dip direction of pegmatites
that have so far been encountered under alluvial cover on tenement E63/2001. This will assist in future
drill program planning by optimising drill direction. It will also test beneath the weathered rocks under
the base of complete oxidation as intersected during the Aircore drilling. The program will potentially
further demonstrate the thesis of north-west to south-east striking pegmatites as evidenced regionally.
Note: The field lithological logging and subsequent reporting of pegmatites are not indicative of
economic pegmatite hosted mineralisation. No mineralogical confirmation or quantitative
analysis has yet been completed. Further exploration work including an assessment of the
current drill sampling results and follow up drilling and sampling will be required to confirm the
presence of any mineralisation.
ASX Announcement 13 July 2023
1
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Lightning Minerals Chief Executive Officer Alex Biggs said, “The early success we have experienced
at our Dundas Project is very positive and warrants further follow up to determine orientation and
depth of pegmatites. The indication of north-west to south-east striking pegmatites which have been
located under alluvial cover is a demonstration of the team’s diligent and staged approach to
exploration. I congratulate the team on a job well done and look forward further successes as we
continue to identify areas that host the potential for lithium mineralisation. Our exploration plans across
our Dundas Project are focused on multiple lithium in soil anomalies and targets and we look forward
to keeping the market updated on our progress”.
ADDITIONAL PEGMATITE INTERSECTIONS ON DUNDAS TENEMENT E63/2001
Four additional downhole pegmatite intersections have been detected within the Aircore drilling
program under alluvial cover. This is subsequent to the Company’s recent announcement regarding
pegmatite intersections also encountered on tenement E63/2001 (ASX announcement 13 July 2023).
Drillholes DSAC0069, DSAC0071, DSAC0105 and DSAC0124 (Table 1) have reported pegmatite
intersections, with hole DSAC0071 displaying the largest interval occurring from 30-47m which remains
open at end of hole. The locations of the intersections are shown in Figure 1 with geological cross
sections shown in Figure 2 and Figure 3. Both cross sections are orientated on an east-west plane and
are looking north.
Holes that have ended in pegmatite have either proven too difficult to re-enter due to field constraints,
or the hammer has not been able to penetrate thought the entire width of the pegmatite leaving the
true width and orientation of the pegmatite unknown at this stage, which is the purpose of the follow
up RC drilling campaign.
In total the AC drill program on tenement E63/2001 has intersected 10 discrete pegmatites, all located
under alluvial cover. This is a significant exploration success and is a crucial step in potentially
progressing towards identifying lithium-caesium-tantalum (LCT) pegmatites as a core focus of the next
stage of RC drilling which will target greater depths.
Table 1: Most recent Aircore program pegmatite intersections on tenement E63/2001
Tenement
Hole ID
Drill
Type
From
(m)
To
(m)
E63/2001
DSAC0069
AC
67
72
E63/2001
DSAC0071
AC
30
47
E63/2001
DSAC0105
AC
24
27
E63/2001
DSAC0124
AC
21
24
Downhole
Interval (m)
EOH in
Pegmatite
Pegmatite (%)
Intersections
Degree of
Weathering
5
-
80% Pegmatite
High
17
✓
95% Pegmatite
Mod-High
3
-
50% Pegmatite
High
3
✓
50% Pegmatite
High
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 1: Drill location map showing Aircore drill area and intersected pegmatite locations
Figure 2: Geological cross section (Section A) of Aircore pegmatite intersections in holes
DSAC0069 and DSAC0071
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 3: Geological cross section (Section B) of Aircore pegmatite intersections in holes
DSAC0105 and DSAC0124.
Pegmatite chips returned from drillhole DSAC0071 are shown in Figure 4. An Aircore blade drill bit was
used until blade refusal at 31m, the hole was then re-entered with an Aircore hammer resulting in
sample contamination (loss) at 31-32m, and reduced chip size.
Figure 4: DSAC0071 chip tray showing Aircore sampled pegmatite intercept between 30m and 47m (EOH).
Field geological logging suggests the pegmatites are highly weathered, the mineral species recorded
are of a similar composition to those reported in prior intersections (ASX announcement 13 July 2023)
with a feldspar-quartz-mica dominant composition. The full table of field geological logging is available
in Appendix 1, Table 2.
Follow up confirmation of the mineral suite is required to ascertain if lithium bearing minerals are
present. Field identification of weathered lithium bearing minerals in pegmatites can be difficult and
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
the presence of spodumene does not have a direct correlation with lithium content. The use of
spectrographic mineral identification on drill cuttings and quantitative analysis by a certified laboratory
using a Peroxide Fusion Digest with Inductively Coupled Plasma (ICP) finish is being finalised.
Sampling of the weathered saprolitic zone encountered during much of the Aircore drill program is
being further analysed. The objective is to composite the saprolitic clay samples into larger 4m samples
that may provide geochemical vectors toward LCT mineralisation given the depth at which the samples
have been taken. Samples will be selected from each hole on a discretionary basis dependant on field
geological logging amongst a variety of modifying factors.
FOLLOW UP REVERSE CIRCULATION (RC) DRILLING
Interpreting the orientation and true width of the intersected pegmatites is not currently possible as
the Aircore drilling locates but fails to delineate the spatial presentation of the pegmatite intrusives. To
accelerate the understanding approximately 1,000m of RC drilling will be employed to test depth
extension beneath the Aircore drill holes that have reported pegmatites. Drilling is designed to test for
depth extension to a maximum of 100m vertically beneath the natural surface. Full penetration of the
pegmatites downhole will provide greater confidence of spatial geological modelling. Additionally, the
collection of fresh rock samples will provide a more representative sample for analysis.
As reported in ASX announcement 13 July 2023 it is yet to be determined if the pegmatites intersected
in holes DSAC0031 to DSAC0034 coalesce as part of a larger swarm or form a single pegmatite unit. The
completion of up to two RC holes under this zone will help appraise the thickness of the pegmatites at
this location.
OTHER EXPLORATION PROGRESS
An infill soil sampling campaign is underway on tenement E63/2000 and E63/1993 (ASX announcement
02 August 2023) to further delineate an 8km2 lithium in-soil anomaly that has been identified with
assays up to 218ppm lithium on tenement E63/2000.
Evaluation of various exploration programs at the Dundas North Project is also underway, approvals are
being curated at present.
Work programs for the company’s other assets are progressing, with progress being made on the Mt
Jewell and Mailman Hill projects.
DUNDAS PROJECT (LIGHTNING MINERALS 100%)
The Dundas Project area is located near Norseman in Western Australia and comprises eight
tenements totalling approximately 454km2. Norseman has a strong history of mining dating back to
1892 and is located 190km south of Kalgoorlie. Historically, Norseman and the Dundas area has
experienced mining in gold and nickel although over recent years the region has become an emerging
lithium and critical minerals province with multiple discoveries and significant exploration activity.
There are two project areas at Dundas:
a) South/western tenements surrounding Liontown Resources’ Buldania/Anna lithium deposit, and,
b) North/eastern tenements approximately 30km to the east of Alliance Mineral Assets’ Bald Hill
lithium-tantalum mine.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 5: Location of Lightning Minerals’ Dundas projects
This announcement has been approved for release by the Board of Directors.
-end
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Stock Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas project is
located in the prolific Dundas region of Western Australia. The Company also has other projects in Western Australia, Mt Jewell,
Mt Bartle and Mailman Hill prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is a
full-time employee of the company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation and
types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in
the original market announcements, and that all material assumptions and technical parameters have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcements.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
APPENDIX 1: DUNDAS – JORC CODE 2012 TABLE 1 CRITERIA
The Table below summarises the assessment and reporting criteria used for exploration results for the Dundas Exploration Project and reflects the guidelines in Table 1 of The Australasian Code
for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Drilling techniques
Drill sample recovery
Logging
Commentary
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
No drill assays reported.
Aircore (AC) drilling samples are collected at 1m intervals from the beginning to the end of each AC hole. Drill sample piles
are placed in an orderly fashion on the drill site pad. When impenetrable lithologies are intersected a 90mm hammer is
used to re-enter the hole to continue drilling. When the hammer is used, a 2-3kg samples are taken from a cone splitting
device to provide drill sample for laboratory analysis.
4m compositing within oxidised saprolite that has not been logged as pegmatite may be undertaken at the Dundas Projects.
This will involve sampling the 1m sample piles with an appropriate scoop to produce a 2-3kg sample from the bulk samples.
Sampling was carried out using Lightning Minerals procedures and QAQC processes as per current industry standard
practice.
Drillhole collars are located using a Garmin Map 62s handheld device.
The AC drilling used an aircore blade drill bit of 90mm diameter, collecting samples at 1m intervals, with the drill sample
being placed onto the drill site pad. When impenetrable lithologies are intersected by the rotation blade bit, a 90mm
percussion hammer is used to re-enter the hole to continue drilling.
Sample quality and % recoveries are recorded as a visual estimate percentage as part of the field drill rig geologist’s rig
data capture template.
Recoveries remained relatively consistent throughout the program.
The drill cyclone is cleaned between rod changes when drilling material that adheres to the cyclone out perimeter, and
as required when drilling harder lithologies that generate coarse rock chips.
Care was taken to ensure calico samples were of consistent volume and weight.
Samples are representative of the drilled intervals.
All drillholes are geologically domain logged by suitably experienced and qualified geologists.
Logging is both quantitative and qualitative in nature, including lithology, mineralisation, mineralogy, weathering, and
colour. Logging is of a standard able support future resource studies should they be required.
A representative washed chip sample for each one-metre interval as placed in a chip tray for future reference.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
The total length and percentage of the relevant intersections logged.
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Photographs are taken of chip trays for each drillhole and stored on L1M company servers.
The field lithological logging and subsequent reporting of pegmatites are not indicative of economic pegmatite hosted
mineralisation. No mineralogical or quantitative analysis has yet been completed. Further exploration work including an
assessment of the current drill sampling results and follow up drilling and sampling will be required to confirm the
presence of any mineralisation.
No drill sample assays have been reported in this announcement.
A 2-3kg sample is split via cone splitter into a numbered calico bag to provide drill sample for laboratory analysis. This occurs
for both the RC and AC programs.
4m composite sampling may be undertaken within non pegmatite logged intervals within the oxidised saprolite. This will
involve sampling the 1m sample piles with an appropriate scoop to produce a 2-3kg sample from the bulk samples.
No drill sample assays have been reported.
References to prior reports have adequate JORC Table 1 information contained within.
No drill sample assays have been reported.
Handheld Garmin GPS instruments were used to geo locate each drill collar, these instruments are understood to be
accurate within a nominal ±5m in the horizontal and vertical planes.
The level of topographic control offered by a handheld GPS is considered sufficient for early exploration drilling.
All samples were collected in the Geocentric Datum of Australia 1994 (GDA94) system. (MGA94, Zone 51)
The drilling spacing is considered appropriate for the reporting of the exploration results.
No Mineral Resource or Ore Reserve Estimates have been completed.
One-metre AC drill hole chip samples were prepared for sample submission.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
•
•
Sample security
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
•
The chain of custody for sampling procedures and sample analysis was managed by the rig geologists during drilling.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
No audits or reviews of sampling techniques have been conducted to date.
Orientation of data in
relation to geological
structure
•
No sample compositing was applied to lithological zones logged as pegmatite lithologies. 4m composite sampling may be
undertaken within the oxidised saprolite. This will involve sampling the 1m sample piles with an appropriate scoop to
produce a 2-3kg sample from the bulk samples.
The drilling of pegmatite units was targeted as best possible at this early stage of exploration activities. Field modifications
were made as best possible to intercept pegmatite perpendicular to the dip plane as per industry best practice.
New or poorly understood pegmatite units can be targeted from opposing directions in order to establish a representative
intercept.
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
•
•
•
•
•
•
•
•
Geology
Deposit type, geological setting and style of mineralisation.
•
•
•
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
•
The Dundas Projects are located ~600km east of Perth and 20 to 50 km ENE of Norseman in Western Australia.
The Dundas Project area totals ~450km2 and comprises eight granted exploration licences separated into two exploration
areas – Dundas North (E28/3027 and E28/3028) and Dundas South (E15/1748, E63/1932, E63/1993, E63/2000, E63/2001,
and E63/2028)
The Tenements are covered by the Ngadju Determined Native Title Claim (WCD2014/004). An agreement is in Place
between the Ngadju Native Title Aboriginal Corporation RNTBC and Lightning Minerals.
The Tenements are considered in good standing at the time of this report.
The Project area has been explored predominantly for gold and nickel by various prior parties.
More recent exploration has included a focus on Lithium via explorers such as Matsa Resources (2008-2018), West
Resource Ventures (2018 – 2019), and Liontown Resources (2018-2020).
The result of this work is described in numerous publicly available Geological Society of Western Australia publications.
Review of the considerable historic exploration activities is ongoing; data is being collated into company databases as per
industry standard data collection practice.
No known mineral deposits occur within project tenure.
The mineralisation style related to this release are metals related to lithium-caesium-tantalum (LCT) pegmatites intrusives.
There are publicly reported occurrences of LCT pegmatites within an acceptable proximity to the Dundas Project
exploration tenure. (Liontown Resources (ASX:LTR) – Buldania Deposit)
The Dundas Project is located at the southern-eastern end of the Norseman-Wiluna Belt within the Archaean Yilgarn
Craton. The project area sits adjacent to the Jerdacuttup Fault which represents the boundary or the Archaean Yilgarn
Craton with the adjacent Proterozoic Albany-Fraser Province.
One hundred and thirty-seven (137) AC holes have been drilled totalling 6,397m of drilling at the time of this
announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
o
o
Data aggregation
methods
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
down hole length and interception depth,
o
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used fo