Auger Program Assay Results for Mailman Hill Gold Project
Released
Released
Announcement PDF
Auger Program Assay Results Received for Mailman Hill Gold
Project
ASX An n ou n cem en t
2 1 Au gu st 2 0 2 4
Lightning Minerals (L1M or the Company) is pleased to announce the return of assays from its recent auger
sampling program at its 100% owned Mailman Hill Project, 30km east of Leanora near Kalgoorlie in Western
Australia. The Labwest UFF+ analysis technique results highlight three areas of interest for follow up
exploration, with peak gold anomalism returning at 141ppb Au.
The assays are from the recently completed auger drilling campaign- which aimed to identify drill targets
which may be an extension to Cavalier Resources’ (ASX: CVR) Crawford Gold Project which hosts 3.75Mt @
1.0g/t for 118Koz (Inferred + Indicated) and initial Probable Ore Reserve of 1.00Mt @ 0.91g/t for 29Koz 2.
The Mailman Hill asset is a project that was part of the Company’s IPO on the ASX in November 2022 and the
Company is excited about the gold potential the Mailman Hill asset may present in the future. While the
Company is still focused on its lithium projects, Mailman Hill provides some positive results in a strong market
for gold and precious metals.
HIGHLIGHTS
•
Program tested 9km of the prospective lithology within the Keith -Kilkenny Tectonic Zone
immediately southeast of the Crawford Gold Project (ASX:CVR)
•
Assays highlight three broad clustered areas with multiple results >15ppb Au that require
follow up exploration.
•
Peak UFF+ gold value of 141ppb Au returned from saprolite above Felsic Volcaniclastic s
of the Minerie Formation
e l 6 505 Li ttle C ollins St Melbo urn e VI C 3000 Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
Lightning Minerals Managing Director Alex Biggs said, “First pass results from Mailman Hill are encouraging
and provide impetus for further follow up and allows the Company to capitalise on an asset that was part of
our IPO. We are still principally focused on the critical minerals and lithium markets, supported by our recent
acquisition of the Caraíbas, Sidrônio and Esperança projects in Brazil’s Lithium Valley but see value at Mailman
Hill. We will now look at the next stage of works and aim to expand on the principle areas of interest that have
been identified during this campaign”.
ASX Announcement 11 June 2024
Cavalier Resources (ASX: CVR) ASX Announcement 14 March 2024
JORC Resource Estimate: 3.75Mt @ 1.00g/t for 117,800 Ounces (Indicated: 1.15Mt @ 1.00g.t for 37,300 Ounces, Inferred:
1
2
2.59Mt @ 1.00g/t for 80,600 Ounces)
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
AUGER DRILLING STRATEGY FOR E37/1408 – MAILMAN HILL GOLD PROJECT
The Mailman Hill project is located adjacent to the southeast of Cavalier Resources (ASX:CVR). Recent
exploration success has progressed the Crawford gold project beyond Prefeasibility studies and has
successfully delineated a JORC gold resource of 3.74Mt @ 1.0g/t (0.5g/t cut off) for 117,800 ounces 2 (Figure
1).
The Mailman Hill auger sampling program was designed to test the geophysical trend extensions over a
spatial footprint of approximately 41km2, including an 8km stretch of prospective strike extension south east
of the Crawford project. Seven hundred and nineteen (719) auger samples have now been collected at
average depths of 1.5 metres beneath alluvial cover. Samples were collected into kraft field sampling bags
which were then sent to LabWest Minerals Analysis of Perth for analysis using the CSIRO developed Labwest
UltraFine+™ (UFF+) analysis technique. The UFF+ technique was developed to test for low level pathfinder
element anomalism through the cover sequences, the application of this technique is considered appropriate
for the Mailman Hill gold project.
Figure 1: Mailman Hill Project location
e l 6 505 Li ttle C ollins St Melbo urn e VI C 3000 Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
KEY ASSAY RESULTS
The UFF+ analytical method was selected as it can detect very subtle anomalies in transported cover where
other traditional detection methods may be challenged. The UFF+ process involves a physical step to retain
the fine microparticles of less than two microns in size as they have a greater surface area to test for the
presence of adsorbed gold and other elements. Where metals can reasonably migrate to the surface in great
enough concentrations, the UFF+ method is the best suited to expose even very low tenor response
anomalism.
Results for the Mailman Hill auger program are encouraging, Au results show a concentration of broad low
level (>15ppb Au) clusters in the north-western half of the auger program area (Figure 2).
Figure 2: Mailman Hill Project complete auger program Au assay results showing gold anomalism
clustered in North-Western half of survey area.
e l 6 505 Li ttle C ollins St Melbo urn e VI C 3000 Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
This concentration of results can be further subdivided into three areas above 15ppb Au (Figure 3). The
response from the south-eastern half of the program may be further subdued due to the depth of the alluvial
cover increasing in this area.
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
The peak Au value (141ppb Au) occurs within ‘Target area 2’ in sample MHAU00250 which is located
approximately 3km east of the interpreted extensions of the Crawford project. The relationship between the
peak gold values returned in this location will be investigated as a priority, as the elevated Au responses are
more consistent along the two sample traverses present within ‘Target area 2’ as shown in Figure 2 below.
The underlying geology in this location is interpreted as Felsic Volcaniclastics of the Minerie Formation, which
may lie on the eastern contact of the broad eastern boundary of the Keith-Kilkenny Tectonic Zone (KKTZ). The
KKTZ lineament is a major structural feature within the Eastern Goldfields Superterrane and has a strong
association with various gold deposits within the region.
High resolution and targeted infill auger programs may be considered to improve the clarity of results for any
Aircore drill target generation, and for follow up exploration works. Assay results for the Mailman Hill auger
program are visually displayed shown in Figure 2 and 3, a full list of results for samples >15ppb Au is available
in Appendix 1.
Figure 3: Mailman Hill Project Auger program Au results showing three broad Target areas for follow
up exploration works
e l 6 505 Li ttle C ollins St Melbo urn e VI C 3000 Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
NEXT STEPS AND OTHER WORK PROGRAMS
A review of geochemical results including analysis of pathfinder elements to elucidate any subtle trends will
be completed to aid in the drill targeting exercise. Small, targeted, and cost-effective infill auger programs
may be considered prior to a decision on aircore drill testing.
The Company has recently begun works on its recently acquired Caraíbas and Sidrônio lithium projects in
Minas Gerais, Brazil. The work program consists of geophysics, soil sampling and ground reconnaissance and
is a crucial step in identifying drill targets across the project area. The projects are in the prolific Lithium Valley
region of Minas Gerais which hosts multiple proven lithium Mineral Resources. The Company will expand its
works to its other recently acquired project in Lithium Valley, Brazil, Esperança.
The Company is also reviewing and developing its next phase of work for its Dundas project in Western
Australia where multiple lithium in soil anomalies exist for follow up.
Approved for release by the Board of Directors
-ENDMore information at www.lightningm inerals.com.au
e l 6 505 Li ttle C ollins St Melbo urn e VI C 3000 Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian S ecurities Exchange (ASX:L1M) and focused on
the exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s D undas project is
located in the prolific Dundas region of Western Australia. The recent acquisition of the Caraíbas, Sidrônio and Esperança
lithium projects in Minas Gerais, Brazil are potentially transformational to the Company’s success in the lithium sector. The
Company also owns the Dalmas and Hiver lithium projects in Quebec, Canada, another significant and evolving lithium region
globally as well as other projects in Western Australia which include Mt Jewell, Mt Bartle and Mailman Hill which are prospec tive
for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward -looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs
or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration
and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades
of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the
future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel,
industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or oth er
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to dif fer
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT
e l 6 505 Li ttle
C ollins St MelboPERSONS
urn e VI C 3000 STATEMENT
Au stralia | admin@ ligh tnin gm inerals.c om.au | (08) 9 4 2 9 8 8 0 6
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarra d
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is
a full-time employee of the Company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation
and types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
REFERENCES TO PREVIOUS ANNOUNCEMENTS
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
L e ve l 11 40 The Espl an ad e Pert h WA 6000 Aust ralia | adm in@li ght ningmin erals.co m.au | (08) 9429 8806
Appendix 1: Mailman Hill – JORC Code 2012 Table 1 Criteria
The Table below summarises the assessment and reporting criteria used for exploration results for the Mailman Hill Exploration Project and reflects the guidelines in Table 1 of The Australasian
Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Drilling techniques
Drill sample recovery
Logging
Sub-sampling techniques
and sample preparation
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
Commentary
•
Auger (Aug) drilling samples were collected at a nominal 1.5m depth or at the field geologists discretion. Selected intervals
for sampling generally correspond with the end of each auger hole. Each collected sample weighs approximately 200gms.
All 719 samples were submitted to the analytical laboratory.
Sample quality was supervised with no material sample loss or excess moisture recorded.
Sampling was carried out using Lightning Minerals procedures and QAQC processes as per current industry standard
practice.
Drillhole collars are located using a Garmin Map 62s handheld device and are reported in projection MGA94 Zone 51
•
•
•
•
•
•
•
•
•
•
•
•
Auger drilling is the technique used for this drilling campaign with collar size of 120mm.
•
•
•
Logging of the weathered and regolith profile is done at the rig site during drilling. Logging is qualitative.
No intersections are recorded: Auger is used as a geochemistry survey below alluvial/lateritic cover.
Level and quality of logging is not defined to establish a geological and structural model but to check and define potential
source of surface anomalous gold samples.
•
Samples collected at the rig are 200gm per unit. Samples are collected in small kraft cardboard bags.
The rig is mounted on a Toyota Landcruiser
Average depth of hole is 1.5m, depths range from 0.1m to 7m deep.
Holes are drilled vertical.
No recovery measurement is done: the samples are collected for grades under alluvial/lateritic cover.
Little water was intersected downhole.
Care was taken to ensure kraft sample bags were of consistent volume and weight as close as practicable to 200gm.
Samples are representative of the drilled intervals.
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
Sample security
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
•
Industry standard QAQC practices of field duplicates and blank sampling, and the appropriate use of laboratory provided
Certified Reference Material for low level gold are used for all laboratory sample submissions. Field Duplicates are utilised
by the company at a rate of 1:50 samples for auger drilling campaigns.
•
Samples, including QA/QC samples, have been processed by LabWest Minerals Analysis of Perth Western Australia, whom
is accredited to ISO17025.
Analysis has been completed using the CSIRO developed Labwest UltraFine+™ (UFF+) analysis technique.
Sample sizes of approximately 200gm are considered appropriate for the Ultrafine+ analytical technique.
Auger samples were collected on a general 100m sample spacing, 400m line spacing grid pattern, and were best orientated
to cross geological strike at approximately 90 degrees.
Some minor variations to sample site locations will occur due to field complexities.
•
•
•
•
•
•
The CP independently verified drilling, sampling, assay and logging results from a validated, externally maintained and
stored geological database.
No adjustments to assay data have been performed. The CP has verified the drill collar, assay and assay QAQC data.
•
Handheld Garmin GPS instruments were used to geo locate each auger drill collar, these instruments are understood to
be accurate within a ±5m in the horizontal and vertical planes.
•
•
The level of topographic control offered by a handheld GPS is considered sufficient for early exploration auger drilling.
All samples were collected in the Geocentric Datum of Australia 1994 (GDA94) system. (MGA94, Zone 51)
•
•
The auger drillhole spacing is considered appropriate for the reporting of the exploration results.
No Mineral Resource or Ore Reserve Estimates have been completed.
•
The auger drilling of soil geochemical targets was targeted as best possible at this early stage of exploration activities.
•
The chain of custody for sampling procedures and sample analysis was managed by the rig geologists during drilling.
Audits or reviews
•
The results of any audits or reviews of sampling techniques and data.
No audits or reviews of sampling techniques have been conducted to date.
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral tenement and Type, reference name/number, location and ownership including
land tenure status
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other parties.
parties
Commentary
•
•
•
•
•
•
•
•
Geology
Deposit type, geological setting and style of mineralisation.
•
•
•
Drill hole Information
Data aggregation
methods
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o
down hole length and interception depth,
o
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The Mailman Hill Project is located ~30km east of Leonora in Western Australia.
The Mailman Hill Project area totals ~101.8km2 and comprises one granted exploration licence E37/1408
The Tenements are covered by the Wangkatja Tjungula Determined Native Title Claim. An agreement is in Place between
the Wangkatja Tjungula Native Title Aboriginal Corporation RNTBC and Lightning Minerals.
The Tenements are considered in good standing at the time of this report.
The Mailman Hill Project area has been explored predominantly for gold and base metals by various prior parties.
More recent and comprehensive exploration has included a focus on Gold via explorers such as Jindalee Resources /
Newcrest Mining (Iron Tank JV) (2004-2005) and Goldphyre Resources (2013-2015)
The result of this work is described in numerous publicly available Geological Society of Western Australia publications.
Review of the considerable historic exploration activities has been completed; data is collated into company databases as
per industry standard data collection practice.
No known mineral deposits occur within project tenure.
There are publicly reported occurrences of gold deposits within an acceptable proximity to the Mailman Hill Project
exploration tenure. (Cavalier Resources (ASX:CVR) – Crawford Deposit)
The Mailman Hill Project straddles the boundary between the Menangina and Murrin Domains of the Kurnalpi Terrane of
the Eastern Goldfields Province. The project covers a significant section of the Keith Kilkenny Lineament that forms the
domain boundary and a structurally complex package of the Murrin Greenstone Belt including mafic, ultramafic, and felsic
volcanic sedimentary units.
•
•
Relevant auger drill hole information has been provided in Appendix 1 of this release.
No material information has been excluded from this report, laboratory analytical results have been adequately
communicated and described within the body of this report.
•
•
•
No levelling of the raw geochemical data was undertaken.
Plan images have been generated using QGGIS software .
No metal equivalent values are reported.
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
These relationships are particularly important in the reporting of Exploration
Results. If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported. If it is not known and only the
down hole lengths are reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
•
•
The Auger drilling data described in this report are reported as downhole samples, no intervals are reported.
There is insufficient data provided by the auger geochemistry contained within this report for a relationship between any
mineralisation, or its geometry.
•
Appropriate reporting of results has been included in the body of this announcement; the plans, or lack thereof suitably
represent the nature of the drilling results.
•
Comprehensive reporting of all exploration results is not considered practicable for this announcement. Pertinent
information for samples returning above 15ppb Au has been communicated in Appendix 1 to ensure balanced and
representative reporting of exploration results has been achieved.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling). Diagrams clearly
highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not
commercially sensitive.
•
All meaningful data and relevant information have been included in the body of the report.
•
The planning of follow up Aircore Drilling is dependent on a full review of the laboratory analytical results and remains
under consideration.
Appendix 1 - Table 1: Mailman Hill Auger program collar locations and Au results >15ppb Au
Tenement
Hole ID
Collar Easting
(MGA94_Z51)
Collar Northing
(MGA94_Z51)
Sample
Depth (m)
Au
(ppb)
Ag
(ppm)
As
(ppm)
Cu
(ppm)
Ni
(ppm)
Pb
(ppm)
Pd
(ppb)
Pt
(ppb)
Sb
(ppm)
Te
(ppm)
Zn
(ppm)
E37/1408
MHAU00001
362080
6803764
1
16.7
0.050
10.7
65.0
159
14.6
4
5
0.598
0.072
78.5
E37/1408
MHAU00004
362194
6803860
4
17.5
0.038
12.2
61.8
71.5
6.69
2
3
0.669
0.052
57.1
E37/1408
MHAU00006
362270
6803922
2
15.9
0.050
9.3
48.4
79.0
8.13
4
5
0.516
Share your feedback
Discover