Aircore Drill Program Complete at Dundas
Released
Released
Announcement PDF
ASX Announcement
9th February 2024
Aircore Drill Program Complete at Dundas
Lightning Minerals (L1M or the Company) is pleased to report that exploration drilling on tenement
E63/2000 is now complete. The drill program has successfully finished 96 aircore holes for 3,820m to
test the lithium, caesium and rubidium geochemical in soil anomalism identified at surface by infill
soil programs in late 20231.
HIGHLIGHTS
o
Aircore drilling campaign on tenement E63/2000 has now been completed
o
96 Aircore drillholes for 3,820m completed to test the geochemistry beneath to surface soil
anomalism
o
Samples enroute to laboratory with assay results expected within 6-8 weeks.
A total of 96 exploration Aircore drill holes have been completed for 3,820m of total drill metres at the
company’s flagship Dundas project 34km east of Norseman in Western Australia.
The drilling targeted two anomalous areas, a ~2.6km x ~1km >100ppm lithium in-soil anomaly, and a
subordinate 600m x 300m area both within E63/20001. This was identified during late 2023 as part of
the Company’s aggressive exploration strategy across the Dundas group of tenements. Holes were
drilled until blade refusal and averaged ~39m maximum depth. Composite samples have been
collected and will be submitted to Nagrom Laboratories of Perth (Nagrom), Western Australia for
analysis. The expected turnaround time for the results is between 6-8 weeks.
Drill contractors Gyro Drilling Australia have now demobilised from site.
Lightning Minerals Managing Director Alex Biggs said, “Completion of Aircore drilling on tenement
E63/2000 is another important incremental step in identifying the mineralisation potential of the
previously identified lithium in-soil anomalies. We have expedited this campaign efficiently and costeffectively to allow us the best opportunity to continue to identify drill targets for future campaigns.
Despite the current market sentiment this doesn’t change the fact that the Dundas region is an
emerging and important lithium district. The Company still believes in the green energy thematic
and continues to execute on its promises that were committed to at the IPO stage. I would like to
thank our geology team and contractors for their efforts and conducting the program in a safe and
efficient manner”.
PRELIMINARY RESULTS
The drill program has successfully achieved spatial coverage of coincident lithium, caesium and
rubidium in soil anomalism identified at surface in late 2023 (Figure 1). End of hole (EOH) lithological
logging includes a range of rock types including mafic volcanics, granites, and metasediments, with
some holes ending within hard undifferentiated saprock/saprolite.
1
ASX Announcement 08 August 2023
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Samples have been collected from all holes where a 4m composite sampling technique has been
employed. The samples are now enroute to the selected laboratory (Nagrom) for a full suite of
exploration stage low level elemental analysis. These results will be assessed, any 4m composite
samples that return elevated geochemistry for pathfinder elements will be resampled for further
analysis at a one-meter resolution to better understand the tenor of the results within the saprolite
profile. The results of this final round of analysis may then be used target and locate an RC drill
campaign that can penetrate to fresh rock below any weathered profile.
Figure 1: Plan of Aircore drillhole collars completed within E63/2000.
OTHER EXPLORATION PROGRESS AT DUNDAS
Logistics are currently being arranged to facilitate an infill soil sampling campaign on tenement
E63/2028. Review of previous soil geochemistry results in this tenement warrants a follow-up program
to further test the thin/stripped saprolite profile present. It is expected that the program could be
undertaken as early as March 2024 dependent on permitting.
Plans are also being finalised for infill soil sampling programs to follow up previous results at the
Company’s Dundas North Project.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Figure 2: Dundas South tenement E63/2000 and E63/1993 showing UFF+ lithium soil geochemistry results for
reconnaissance and infill sampling programs with resultant target areas
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
DUNDAS PROJECT (LIGHTNING MINERALS 100%)
The Dundas Project area is located near Norseman in Western Australia and comprises eight
tenements totalling approximately 454km2. Norseman has a strong history of mining dating back to
1892 and is located 190km south of Kalgoorlie. Historically, Norseman and the Dundas area has
experienced mining in gold and nickel although over recent years the region has become an emerging
lithium and critical minerals province with multiple discoveries and significant exploration activity.
There are two project areas at Dundas:
a) South/western tenements surrounding Liontown Resources’ Buldania/Anna lithium deposit, and,
b) North/eastern tenements approximately 30km to the east of Alliance Mineral Assets’ Bald Hill
lithium-tantalum mine.
Figure 3: Location of Lightning Minerals’ Dundas projects
This announcement has been approved for release by the Board of Directors.
-end
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
ABOUT LIGHTNING MINERALS
Lightning Minerals is a mineral exploration company, listed on the Australian Stock Exchange (ASX:L1M) and focused on the
exploration of critical minerals and lithium at its tenements across Western Australia. The Company’s flagship Dundas project is
located in the prolific Dundas region of Western Australia. The Company also owns the Dalmas and Hiver lithium projects in
Quebec, Canada, another significant and evolving lithium region globally as well as other projects in Western Australia which
include Mt Jewell, Mt Bartle and Mailman Hill which are prospective for base metals and critical minerals.
FORWARD LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the
reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking
statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake
any obligation to publicly update or revise any of the forward-looking statements or to advise of any change in events, conditions
or circumstances on which any such statement is based.
COMPETENT PERSONS STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr Jarrad
Woodland, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Woodland is a
full-time employee of the company. Mr Woodland has sufficient experience which is relevant to the style of mineralisation and
types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Woodland consents to the inclusion of his name in the matters based on the information in the form and context in which it
appears. Mr Woodland holds options in Lightning Minerals.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcements, and that all material assumptions and technical parameters have not materially changed. The
Company also confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
APPENDIX 1: DUNDAS – JORC CODE 2012 TABLE 1 CRITERIA
The Table below summarises the assessment and reporting criteria used for exploration results for the Dundas Exploration Project and reflects the guidelines in Table 1 of The Australasian Code for
the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC 2012 Code).
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed. Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Drilling techniques
Drill sample recovery
Logging
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
No drill assays reported.
Aircore (AC) drilling samples are collected at 1m intervals from the beginning to the end of each AC hole. Drill sample piles
are placed in an orderly fashion on the drill site pad. A 2-3kg composite sample is then taken from four consecutive 1m
samples using a spear comprised of inert material.
Sampling was carried out using Lightning Minerals procedures and QAQC processes as per current industry standard
practice.
Drillhole collars are located using a Garmin Map 62s handheld device.
AC drilling used an industry standard aircore blade drill bit of 90mm diameter, collecting samples at 1m intervals, with
the drill sample cuttings being placed onto the drill site pad.
Sample quality and % recoveries are recorded as a visual estimate percentage as part of the field drill rig geologist’s rig
data capture template.
Recoveries remained relatively consistent throughout the program.
Care was taken to ensure calico samples were of consistent volume and weight.
Samples are representative of the drilled intervals.
All drillholes are geologically domain logged by suitably experienced and qualified geologists.
Logging is both quantitative and qualitative in nature, including lithology, mineralisation, mineralogy, weathering, and
colour. Logging is of a standard able support future resource studies should they be required.
A representative washed chip sample for each end of hole (EOH) interval as placed in a chip tray for future reference.
Photographs are taken of EOH chip trays for each drillhole and stored on L1M company servers.
Field lithological logging is not indicative of economic pegmatite hosted mineralisation. No laboratory analysis results
have yet been returned. Further exploration work including an assessment of the current drill sampling results and
follow up drilling and sampling will be required to confirm the presence of any mineralisation.
No drill sample assays have been reported in this announcement.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
•
Sample security
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
•
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
•
•
•
•
•
•
•
•
•
•
•
•
Aircore drill cuttings are collected at 1m intervals from the beginning to the end of each AC hole. Drill sample piles are
placed in an orderly fashion on the drill site pad. A 2-3kg composite sample is then taken from four consecutive 1m samples
using a spear comprised of inert material.
Compositing samples to 4m intervals are considered appropriate at this early stage of exploration.
No drill sample assays have been reported.
References to prior reports have adequate JORC Table 1 information contained within.
No drill sample assays have been reported.
Handheld Garmin GPS instruments were used to geo locate each drill collar, these instruments are understood to be
accurate within a nominal ±5m in the horizontal and vertical planes.
The level of topographic control offered by a handheld GPS is considered sufficient for early exploration drilling.
All drillholes are in the Geocentric Datum of Australia 1994 (GDA94) system. (MGA94, Zone 51)
The drilling spacing is considered appropriate for the reporting of the exploration results.
No Mineral Resource or Ore Reserve Estimates have been completed.
4m sample compositing was applied.
The drillhole locations are designed to target as best possible the soil anomalism at this early stage of exploration
activities.
The chain of custody for sampling procedures and sample analysis was managed by the onsite rig geologists during
drilling.
No audits or reviews of sampling techniques have been conducted to date.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Mineral tenement and land
tenure status
Type, reference name/number, location and ownership
•
including agreements or material issues with third
•
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites,
•
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a •
licence to operate in the area.
Acknowledgment and appraisal of exploration by other
•
parties.
Exploration done by other
parties
Commentary
•
•
•
Geology
Deposit type, geological setting and style of
mineralisation.
•
•
•
Drill hole Information
Data aggregation methods
A summary of all information material to the
•
understanding of the exploration results including a
•
tabulation of the following information for all Material
•
drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o
down hole length and interception depth,
o
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging•
techniques, maximum and/or minimum grade
•
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated. •
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low grade
results, the procedure used for such aggregation should
The Dundas Projects are located ~600km east of Perth and 20 to 50 km ENE of Norseman in Western Australia.
The Dundas Project area totals ~450km2 and comprises eight granted exploration licences separated into two exploration areas – Dundas
North (E28/3027 and E28/3028) and Dundas South (E15/1748, E63/1932, E63/1993, E63/2000, E63/2001, and E63/2028)
The Tenements are covered by the Ngadju Determined Native Title Claim (WCD2014/004). An agreement is in Place between the Ngadju
Native Title Aboriginal Corporation RNTBC and Lightning Minerals.
The Tenements are considered in good standing at the time of this report.
The Dundas South Project area has been explored predominantly for gold and nickel by various prior parties.
More recent exploration has included a focus on Lithium via explorers such as Matsa Resources (2008-2018), West Resource Ventures
(2018 – 2019), and Liontown Resources (2018-2020).
The result of this work is described in numerous publicly available Geological Society of Western Australia publications.
Review of the considerable historic exploration activities is ongoing; data is being collated into company databases as per industry
standard data collection practice.
No known mineral deposits occur within project tenure.
The mineralisation style related to this release are metals related to lithium-caesium-tantalum (LCT) pegmatites intrusives. There are
publicly reported occurrences of LCT pegmatites within an acceptable proximity to the Dundas Project exploration tenure. (Liontown
Resources (ASX:LTR) – Buldania Deposit)
The Dundas Project is located at the southern-eastern end of the Norseman-Wiluna Belt within the Archaean Yilgarn Craton. The project
area sits adjacent to the Jerdacuttup Fault which represents the boundary or the Archaean Yilgarn Craton with the adjacent Proterozoic
Albany-Fraser Province.
Ninety six (96) AC holes for a total of 3,820m were drilled during the campaign.
Relevant drill hole information has been provided in this release.
No information has been excluded.
No levelling of the raw geochemical data was undertaken.
Plan images have been generated using QGGIS software.
No metal equivalent values are reported.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Relationship between
mineralisation widths and
intercept lengths
Diagrams
Balanced reporting
Other substantive exploration
data
Further work
be stated and some typical examples of such
aggregations should be shown in detail.
These relationships are particularly important in the •
reporting of Exploration Results. If the geometry of the
mineralisation with respect to the drill hole angle is
known, its nature should be reported. If it is not known
and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales) and
•
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration •
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Other exploration data, if meaningful and material, •
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests
•
for lateral extensions or depth extensions or large-scale
•
step-out drilling). Diagrams clearly highlighting the
areas of possible extensions, including the main
geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Any relationship between reported geochemical results and potential mineralisation is unknown at the time of the report.
Appropriate plans and cross sections have been included in the body of this announcement; these plans suitably represent the nature of
the drilling results.
Balanced reporting has been completed.
All meaningful data and relevant information have been included in the body of the report.
Mineralogical studies and geochemical assay work is planned to be completed once the samples are returned to Perth.
Planning of follow up Reverse Circulation or Diamond Drilling of pegmatites is partially dependant on qualified laboratory analytical results
but is under consideration.
Level 6, 505 Little Collins Street, Melbourne VIC 3000 | admin@lightningminerals.com.au | www.lightningminerals.com.au | (08) 9429 8806
Share your feedback
Discover