4 November 2026
Warby Phase 3 Soil Sampling Complete as
Maiden Tungsten Drill Targeting Advances
________________________________________________________________________________________
Lightning has completed its expanded Phase 3 soil sampling program at the wholly owned
Warby Tungsten Project in North Queensland, with 220 samples submitted for analysis.
Together with newly identified historical workings, planned LiDAR survey and UNSW
petrological work, the expanded dataset is designed to rank targets for a maiden drill
program at Warby.
Highlights:
• Expanded Phase 3 soil program completed at the Warby Tungsten Project, with 220
samples collected and submitted for analysis; close-spaced coverage is designed to
further refine the current tungsten soil anomalies
• Further historical workings identified during sampling, with visible wolframite
observed in hand specimen; surface rock chip sampling is planned (visual observations
only, laboratory assays required)
• LiDAR surveying planned for November 2026 to map historical workings and support
interpretation of the potential extent of the vein swarm/footprint
• Samples submitted to the University of New South Wales (UNSW) for petrological
work to improve understanding of the controls on tungsten mineralisation
• An Integrated approach utilising geochemical and mineralogical data, mapping and
LiDAR, will be used to rank targets for a maiden drill program
• Engage with this announcement via InvestorHub
MANAGING DIRECTOR COMMENT
Lightning Minerals Managing Director Troy Brice said:
“Completing the expanded geochemical sampling program is another important step in
advancing Warby towards drill target selection. We now have a broader dataset to work with, the
identification of further historical workings during the field program provide additional target
areas for immediate follow-up.
“Our next priority is to bring together the assay data, LiDAR survey and UNSW petrological work
to better understand the controls on tungsten mineralisation and rank targets for a maiden drill
program. This systematic approach is designed to focus exploration expenditure on areas
supported by the strongest technical evidence.”
2
Lightning Minerals Limited (ASX: L1M) (“Lightning” or “the Company”) is pleased to report
completion of its expanded Phase 3 soil sampling program at the wholly owned Warby Tungsten
Project in North Queensland. A total of 220 samples have been collected and submitted for
analysis, advancing the Company’s systematic evaluation of the project’s tungsten potential.
The program also identified further historical workings, targeted for follow-up geochemical
sampling. Combined with the planned LiDAR survey and petrological work by UNSW, the
expanded dataset is designed to strengthen the geological model and focus the next stage of
exploration on the most prospective targets.
For investors, Phase 3 is the bridge between surface exploration and drill testing. Each dataset
(close-spaced soil sample coverage, field mapping of historical workings, LiDAR surveying and
petrology) is designed to refine targets prior to drilling. Capital is then directed to the targets
supported by the strongest technical evidence.
EXPANDED PHASE 3 SOIL SAMPLING PROGRAM
Phase 3 builds on the soil geochemistry, rock chip and drainage sampling completed during
Phases 1 and 2. It was designed to refine the orientation and extent of the previously identified
tungsten soil anomalies, including areas that remained open to the north-east, south-west,
north and west, and to assess their relationship with mapped veins and historical workings.
The expanded program is now complete, with 220 samples collected and submitted for analysis.
Samples were taken at 25-metre spacing along infill and extension lines approximately 125
metres apart. This closer-spaced coverage is intended to improve definition of the surface
anomalies and help distinguish priority areas for follow-up. Drill holes will then be planned to
target the highest-order anomalies.
The geochemical anomaly map delineates the current interpretation of the tungsten soil
anomaly along with sample locations, mapped veins, historical workings and panned
concentrate results, (Figure 1). It provides the spatial framework for assessing the expanded
sampling coverage alongside geological observations. The map does not establish the extent or
continuity of mineralisation at depth.
3
Figure 1. Location of Warby Phase 3 Soil Samples collected (green)
FURTHER HISTORICAL WORKINGS IDENTIFIED
Further historical workings were identified during the soil sampling program, with visible
wolframite observed in the field (Figures 2 and 3). These new areas will be targeted for geological
mapping and surface sampling and will be integrated into the current geological and
geochemical interpretations.
4
Figure 2 (left). Soil sampling using a power auger at the Warby Tungsten Project.
Figure 3 (right). Representative specimen of crystalline wolframite observed at newly identified workings, Warby
Vein Swarm.
PETROLOGICAL WORK TO SUPPORT TARGET INTERPRETATION
13 samples have been submitted to UNSW for petrological work. The results are intended to
improve understanding of the mineral assemblages, host rocks and alteration associated with
the Warby tungsten occurrences, and to assist interpretation of the controls on tungsten
mineralisation.
The Company will integrate these findings with the expanded geochemical dataset and field
mapping to refine its geological model and prioritise targets for further testing. No petrological
results are reported in this announcement.
LIDAR TO SHARPEN FOLLOW-UP EXPLORATION
LiDAR surveying is planned for November 2026 to provide a detailed digital elevation model
(DEM) of the surface terrain, (Figure 4). The survey is intended to help delineate known historical
tungsten workings, identify additional surface features for field checking and assist structural
interpretation.
LiDAR maps the ground surface in detail and may reveal features on the ground not immediately
obvious in aerial imagery or from the ground. These features will then require field checking to
determine if they are related to potential historical workings and/or vein structures. The resulting
DEM will be incorporated alongside the current geochemical and geological data to help
interpret the potential extent of the vein swarm and potential mineralised footprint.
5
Figure 4. Aerial view of the Lightning exploration team at the Warby Tungsten Project.
NEXT STEPS
• Validate and interpret the Phase 3 soil assay results, and report material results to the
market with the supporting technical information.
• Complete surface rock chip sampling and geological mapping at the newly identified
historical workings.
• Complete the LiDAR survey (planned November 2026) and integrate the interpretation
with field observations and geochemical data.
• Incorporate UNSW petrological findings into the Warby geological model when
available.
• Assess further drainage sampling across the broader Lyndbrook Complex, including the
approximately 13-kilometre Angore Granite contact and areas intersected by north-
west-trending structures.
• Rank targets for potential trenching and a maiden drill program, subject to results,
required approvals, access and final program design.
WARBY REGIONAL SETTING
The Warby Project (EPM 28262) is located north-east of Georgetown in North Queensland,
adjacent to the Company’s Scardon tenement (EPM 28289), Figure 5. The Company’s North
Queensland tenements proximity relative to regional processing infrastructure can clearly be
seen, including the active Mt Carbine tungsten plant (ASX: EQR).
6
Figure 5. Location of Lightning Minerals’ North Queensland tenements, including Warby (EPM 28262) and Scardon
(EPM 28289), relative to regional processing infrastructure.
PATHWAY TO A MAIDEN DRILL PROGRAM AT WARBY
Phase 3 is designed to convert the surface results generated to date into a ranked set of drill
targets. A maiden drill program would be the Company’s first test of the Warby targets at depth
and represents the next key milestone for the project, subject to results, required approvals,
access and final program design.
-end-
7
REFERENCES TO PREVIOUS ASX ANNOUNCEMENTS
This announcement should be read in conjunction with the following previous Company
announcements. The historical datasets reproduced in the Appendices relate to Phases 1 and 2
and are not new Phase 3 assay results.
• 16 April 2026 — Strategic Plan and Portfolio Simplification
• 19 May 2026 — Significant Tungsten Potential Identified at the Warby Project in North
Queensland
• 22 May 2026 — Supplementary Information – Warby Project Tungsten Announcement
• 4 June 2026 — High-Grade Tungsten Assays Confirm Extensive Mineralisation
• 13 July 2026 — Lightning Accelerates Warby Tungsten Exploration Following High-Grade
Assay Results
• 21 July 2026 — Lightning Completes Phase 2 Exploration at Warby Tungsten Ahead of
Drill Target Selection
• 24 August 2026 — High-Grade Rock Chip Results from Phase 2 Strengthen Warby’s
Regional Tungsten Potential
• 21 September 2026 — Large Scale Open Tungsten System at Warby Project Historical
Workings
• 24 September 2026 — Phase 3 Soil Program Underway at Warby to Define Maiden
Tungsten Drill Targets
This announcement has been authorised for release by the Board of Lightning Minerals Limited.
For more information, please visit: lightningminerals.com.au.
Enquiries in relation to the announcement, please contact:
Lightning Minerals Ltd (ASX: L1M) Tau Media
Troy Brice Jessica Fertig | +61 408 855 855
Managing Director Investor & Media Relations
admin@lightningminerals.com.au ir@lightningminerals.com.au
8
About Lightning Minerals Limited (ASX: L1M)
Lightning Minerals Limited is an Australian mineral exploration company focused on gold, copper,
molybdenum and tungsten opportunities within its Australian project portfolio. The Company’s principal
asset is the wholly owned Mt Turner Project in northern Queensland. Exploration at Mt Turner is focused on
gold, copper and molybdenum mineralisation. The Company is undertaking systematic exploration, including
geochemical sampling, geophysical surveys, geological interpretation and drilling, to progressively evaluate
the project’s mineral potential and advance priority targets.
Lightning Minerals also holds the Warby Project in northern Queensland, a rapidly advancing tungsten
exploration opportunity and an important component of the Company’s critical-minerals strategy.
Systematic exploration is being undertaken to evaluate the extent and continuity of tungsten mineralisation,
refine priority target areas and inform subsequent phases of exploration.
The Company’s Western Australian gold projects provide additional exploration and asset- development
depth, complementing the Company’s priority activities at Mt Turner and contributing to a broader pipeline of
gold opportunities. Lightning Minerals’ strategy is to create long-term shareholder value through disciplined
exploration, technically driven target generation and responsible capital allocation.
Lightning Minerals Project Map
9
COMPETENT PERSON STATEMENT
The information contained herein that relates to exploration results is based on information compiled or reviewed by Mr
Lee Spencer, who is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy. Mr Spencer
is a Director of TRS Management Pty Ltd, a contractor to the Company. Mr Spencer, B.Sc. (Hons) M.Sc. M.AusIMM, has
sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Spencer consents to the inclusion of his
name in the matters based on the information in the form and context in which it appears.
PREVIOUSLY REPORTED INFORMATION
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements, and that all material assumptions and technical parameters have not materially
changed. The Company also confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original market announcements.
FORWARD-LOOKING STATEMENTS
Information included in this release constitutes forward-looking statements. Often, but not always, forward-looking
statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”,
“plan”, “estimate”, “anticipate”, “continue” and “guidance”, or other similar words, and may include, without limitation,
statements regarding plans, strategies and objectives of management, anticipated production or construction
commencement dates and expected costs or production outputs.
Forward-looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance
or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuationsandgeneral economic conditions, increasedcostsand demand for production inputs, the speculative nature
of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing
quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company
operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and
retention of personnel, industrial relations issues and litigation.
Forward-looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and
operations in the future. The Company does not give any assurance that the assumptions on which forward-looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any
material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the
Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results
to differ materially from those disclosed in forward-looking statements, there may be other factors that could cause
actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events
are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on
forward-looking statements. Forward-looking statements in these materials speak only at the date of issue. Subject to
any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information
the Company does not undertake any obligation to publicly update or revise any of the forward-looking statements or to
advise of any change in events, conditions or circumstances on which any such statement is based.
10
APPENDICES
JORC Code, 2012 Edition – Table 1 (Section 4 & 5 not applicable)
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g., cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
• Includereferencetomeasurestakentoensure samplerepresentivityandthe
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g., ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g., submarine nodules) may warrant
disclosure of detailed information.
Soil Samples
• A total of 220 soil samples were collected with lines 125 metres apart and
samples collected at 25 metre spacing. Samples were collected using a
power auger to a nominal depth of 0.5 metre in the B horizon.
• Outcrop, coordinates, soil type and colour were logged. Samples were
screened at 180 microns and the minus-180-micron fraction submitted for
analysis.
Drilling
techniques
• Drill type (e.g., core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g., core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
• Not Applicable.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Not Applicable.
11
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc.) photography.
• The total length and percentage of the relevant intersections logged.
• Sample site coordinates were noted, samples sites were logged for soil
type, colour and basement outcrop. Logging is qualitative and appropriate
for early-stage exploration.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-
half sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• Soil samples were collected using a power auger to a maximum depth of
0.5 metre. Samples were collected, bagged and assigned a sample
number. Coordinates were recorded (GDA94 Zone 55) along with soil type,
colour, description and notes on any nearby outcrop.
• Samples were transported back to Georgetown facility where they were
screened at 180 microns with the -180 micron fraction weighed and
transferred to a soil packet. Screens were cleaned by air compressor
between each sample.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their derivation,
etc.
• Nature of quality control procedures adopted (e.g., standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e., lack of bias) and precision have been established.
• Samples were transported to ALS Laboratory in Townsville and will be
analysed using ALS assay method ME-MS 81.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Primary data is recorded in the field and transferred to spreadsheets and
uploaded to the company’s electronic data filing system.
• Assays are received from the Laboratory in excel format and appended to
field data. Deviations of assays from observed mineralisation are re-
assayed.
12
Criteria JORC Code explanation Commentary
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• All sample locations are recorded by GPS and entered into field notes.
• Grid system is GDA94 Zone 55.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• The spacing is appropriate for reconnaissance anomaly definition.
• The current spacing of sampling may be sufficient to establish some degree
of continuity. Further grid-based sampling or drilling would be required to
define grade and geological continuity.
• No compositing has been applied.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• Sampling lines were designed to cross perpendicular to the orientation of
the interpreted and inferred vein mineralisation.
• The relationship between sample orientation and all possible mineralised
structures is not fully understood at this early stage.
Sample security • The measures taken to ensure sample security. • Chief measure to ensure sample security was the adoption of an internal
chain security of custody. Samples were delivered from the field and
delivered to courier for delivery to ALS Laboratory.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No internal review or audit of sampling techniques has been carried out.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• Sampling was carried out on EPM 28262 Warby 100% owned by Lightning
Minerals Pty Ltd. The tenement is in good standing and under Queensland
law gives the holder exclusive right to explore for minerals for a period of 5
13
Criteria JORC Code explanation Commentary
• The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
years. The tenement can be extended for a further five years on
application.
Exploration done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • No recorded previous exploration on tungsten exploration. other parties
Geology • Deposit type, geological setting and style of mineralisation. • Mineralisation appears to be hydrothermal W vein type.
Drill hole Information • A summary of all information material to the understanding of the exploration results including a
tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar.
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar.
o dip and azimuth of the hole.
o down hole length and interception depth.
o hole length.
• If the exclusion of this information is justified on the basis that the information is not Material and this
exclusion does not detract from the understanding of the report, the Competent Person should
clearly explain why this is the case.
• Not applicable.
Data aggregation methods • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade
truncations (e.g., cutting of high grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-
grade results, the procedure used for such aggregation should be stated and some typical examples
of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be clearly stated.
• Not applicable.
Relationship between
mineralisation widths and
intercept lengths
• These relationships are particularly important in the reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be
reported.
• If it is not known and only the down hole lengths are reported, there should be a clear statement to
this effect (e.g., ‘down hole length, true width not known’).
• Not applicable.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any
significant discovery being reported These should include but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
• Not applicable.
Balanced reporting • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting
of both low and high grades and/or widths should be practiced to avoid misleading reporting of
• Not Applicable.
14
Criteria JORC Code explanation Commentary
Exploration Results.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be reported including (but not limited to):
geological observations; geophysical survey results; geochemical survey results; bulk samples – size
and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and
rock characteristics; potential deleterious or contaminating substances.
• Not Applicable.
Further work • The nature and scale of planned further work (e.g., tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially sensitive.
• Depending on assay results further work will
be aimed at discovery of further evidence of
W mineralisation by a combination of
drainage sampling, soil sampling and
trenching.
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)
Criteria JORC Code explanation Commentary
Database
integrity
• Measures taken to ensure that data has not been corrupted by, for example, transcription or keying errors,
between its initial collection and its use for Mineral Resource estimation purposes.
• Data validation procedures used.
• Sampling was conducted under a quality
management system. All field data
captured by hard copy is subsequently
uploaded to a spreadsheet system and
added to the stored database. The
database is checked for input errors in the
field and at head office.
Site visits
• Comment on any site visits undertaken by the Competent Person and the outcome of those visits.
• If no site visits have been undertaken indicate why this is the case.
• Competent person collected phase 1 rock
chips.
15
Criteria JORC Code explanation Commentary
• Competent person inspected Phase 2 soil
sampling.
Geological
interpretation
• Confidence in (or conversely, the uncertainty of) the geological interpretation of the mineral deposit.
• Nature of the data used and of any assumptions made.
• The effect, if any, of alternative interpretations on Mineral Resource estimation.
• The use of geology in guiding and controlling Mineral Resource estimation.
• The factors affecting continuity both of grade and geology.
• Project is in early exploration stage as such
geological interpretation of any mineral
deposits present is premature.
Dimensions
• The extent and variability of the Mineral Resource expressed as length (along strike or otherwise), plan
width, and depth below surface to the upper and lower limits of the Mineral Resource.
• Current soil sampling will not estimate the
extent of sub surface mineralisation.
Estimation
and modelling
techniques
• The nature and appropriateness of the estimation technique(s) applied and key assumptions, including
treatment of extreme grade values, domaining, interpolation parameters and maximum distance of
extrapolation from data points. If a computer assisted estimation method was chosen include a description
of computer software and parameters used.
• The availability of check estimates, previous estimates and/or mine production records and whether the
Mineral Resource estimate takes appropriat
Share your feedback